REINFORCEMENT CHECKLIST
Site: Date:
Activity
Location:
YES NO NA
Structural Drg. No. and date as per which reinforcemnt checked, the Bar
1 Bending Scheduale Prepared?
Placing of bar diameter, number, spacing, all match with the construction
3
scheduale?
6 Chairs Provided?
9 Maintaing records and getting approval for additional reinforcement not shown.
10 To check the construction joint for proper concrete bonding before placing reinforcement.
12 Check for test reports for rebar steel and approved brand or not ?
Checked By:
Approved By:
GOLDEN SQUARE ENGINEERING CONSULTANT
Project:
Client:
Project Location
Doc. No.:
SHUTTERING CHECKLIST
Site: Date:
Activity
Location:
SHUTTERING YES NO NA
1 Shuttering material is New / Old.
2 Repairs are OK?
3 Cleanliness of Shuttering
4 Oiling of shuttering
FIXED SHUTTERING
5 Shuttering Design OK? (Dimension, Diagonal, Sunken Position, etc.,)
6 Alignment / Level / Rigidity OK?
7 Check props, are they OK?
8 Check Acrows span, are they OK?
9 Check Braces, are they OK?
10 Check sealing joints / Holes , OK?
11 Check for any rework or alternations.
AFTER REMOVAL OF SHUTTER
12 Surface of concrete, Good / Moderate level and line.
13 Repair of surface required?
If YES then the same to be carried out and checked by the QA Engineer.
REMARKS OF Q.A ENGINEER:
Checked By:
Approved By: