Annexure I Circuit Breaker 1.0 General Technical Requirements
Annexure I Circuit Breaker 1.0 General Technical Requirements
LTD
Annexure I
CIRCUIT BREAKER
1.1 The circuit breakers shall be porcelain-clad type suitable for outdoor installation.
The porcelain housing for the interrupter shall be of a single-piece construction,
without any joint. The breaker unit shall be mounted on insulator columns, each
column consisting of not more than two insulators.
1.2 All ferrous parts, including fasteners of size M10 and above, exposed to air, shall
be hot dip galvanized. Nut-bolts of size less than M10 shall be made of stainless
steel.
1.3 The terminal pads for take-off shall be made of aluminum. If the terminal pad is
made of any material other than aluminum, it shall be silver painted. The
current density adopted for the terminal pad shall not be more than 1.0A per sq.
mm.
1.4 The circuit breaker for 33kV shall be VCB. Each breaker shall be provided with a
minimum of 10 N/O + 10 N/C auxiliary contacts. The contacts shall be
adequately rated for the various duties stipulated.
1.5 Similar parts of the breaker, especially the removable ones, shall be freely
interchangeable without any modification at site.
1.6 The support structure may be lattice type or tubular type, and shall be made out
of hot-dip galvanized steel. The foundation bolts and other associated nuts,
washers, spring washer, etc. shall also be hot-dip galvanized.
Page 1 of 4
MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO.LTD
8. Auto-reclosing duty. -
9. Operating duty. (-----------0 – 0.3Sec –CO– 3min– CO ----------)
Page 2 of 4
MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO.LTD
19. Rated breaking current capacity for rated small 0.5 to 10A without switching overvoltage exceeding 2.0
inductive current (Amps) per unit
Notes :
1. Provision shall be made for attaching timing kit at site for timing test on breaker without
opening any vacuum compartment/botle.
2. Provision for circuit breaker ready status using spring charge and Vacuum switch contact
shall be available.
3. D.C. changeover scheme should be for indication ckt., Annunciation ckt, pressure switch and
pole discrepancy only.
4. The foundation drilling plan shall be exactly in line with the details given in the existing
foundation plan arrangement .
Page 3 of 4
MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO.LTD
LIST OF STANDARDS
Chief Engineer
EHV PC O&M Zone, MSETCL Pune