Excercise 1: Network Diagram: Name: Banaag, Janelle Andrea U. Macasaet, Abegail C. Odo, Fyella Margrette M

The document provides information about an exercise involving network diagrams and precedence relationships between activities. It includes two tables and figures - Table 1 and Figure 1 show the activities, their predecessors, and duration in weeks for a book production process. Table 2 and Figure 2 show the immediate predecessors and expected time in days for construction activities of building a house. The total duration to complete the book production process is 17 weeks and to complete the house construction is 23 weeks.

Uploaded by

Joseph Tan Lanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views13 pages

Excercise 1: Network Diagram: Name: Banaag, Janelle Andrea U. Macasaet, Abegail C. Odo, Fyella Margrette M

The document provides information about an exercise involving network diagrams and precedence relationships between activities. It includes two tables and figures - Table 1 and Figure 1 show the activities, their predecessors, and duration in weeks for a book production process. Table 2 and Figure 2 show the immediate predecessors and expected time in days for construction activities of building a house. The total duration to complete the book production process is 17 weeks and to complete the house construction is 23 weeks.

Uploaded by

Joseph Tan Lanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

EXCERCISE 1:

NETWORK DIAGRAM

NAME:
BANAAG, JANELLE ANDREA U.
MACASAET, ABEGAIL C.
ODO, FYELLA MARGRETTE M.

TABLE 1 & FIGURE 1 TABLE 2 & FIGURE 2


ACTIVITY PREDECESSOR(S)

A: Manuscript proofreading by editor None

B: Sample pages preparation None

C: Book cover design None


D: Artwork Preparation None
E: Author's approval of edited A,B
manuscript and sample pages
F: Book formatting E
G: Author's review of formatted F
pages
H: Author's review of artwork D
I: Production of printed plates G,H
J: Book production and binding C,I

3
A
START
E
B
B 2
DURATION (WEEKS)

4
3

1
2
4

2 4 2
E F G
1

3
D H
17 WEEKS

2 2 4
I J END
1 4

C
EEKS
IMMEDIATE
ACTIVITY PREDECESSORS
1 Walls and Ceiling 2
2 Foundation -
3 Roof Timbers 1
4 Roof Sheating 3
5 Electrical Wiring 1
6 Roof Shingles 4
7 Exterior Siding 8
8 Windows 1
9 Paint 6, 7, 10
10 Inside Wall Board 8, 5

START 2
EXPECTED TIME
(DAYS)
5
3
2
3
4
8
5
2
2
3

17 WEEKS

5 2

2 1 3 4
2

8 7
5
5
4

10
3
3 8

4 6
5

7
9 2

23 WEEKS

END