100% found this document useful (1 vote)
781 views4 pages

Model Estimate of Soakpit and Mixed Fruit

Estimates

Uploaded by

Mery Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (1 vote)
781 views4 pages

Model Estimate of Soakpit and Mixed Fruit

Estimates

Uploaded by

Mery Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
Model Estimate for construction of Tube well Platform with Soak-Pit and Compost Pit under MGNREGA in the District Coochbehar Sino Description of ftem Sk_[Ssk [Usk Materials 1 [Earth work in excavation in foundation trenches ar drain lift Platform, 1 x 1.50 x 1.80 x 0.225 = 0.61 cum, Drain, 4.50 x 0.60 x 0.225 0.61, Soak-pit, 1 x 22/7 x 1.10/2 x 1.10/2 1.80 = 1.71, |Compost pit 1x 1.50.x 2.10 x 0.90 = 2.84, Total = 5.77 cum @1.T6cum.Jusk o | o | 328 12 Laying soling to proper cambér, hand packing, spreading] Stone boulder: powdered earth in the interestices with bricks and stones| 0.82 cum. b) Laterite boulder/stone boulder Drain, 1x4.50x 0.60 =2.700 sqm. Total = 5.40 sqm. Wage @30sqm/sk-1, usk-& ois} o | 07 5 [Cement concrete with 30 mm down graded shingles excluding Stone singles-0.39 On soling area, 5.40 x 0.075 = 0.41 cum. cum, — Sand-0.20 ad Total = 0.41 cum, J cum, Cement-1.83, @2lcunvsk-2, usk-3] 032 | 0 | 049 bags a ‘Ordinary cement concrete with 20mm down graded stone Platform, 2 x (1.80 + 1.50) x 0.20 x 0.20 = 0.26 cum. River bazree 0.55 Drain wall, 2x 4.50x 0.20.x 0.20 | cum, Sand- ‘Total 0.27 Cement-3.90 @2cum/sk-2,usk3 | 062} 0 | 093 bags [5 |Flire charge for shuttering with centreing and necessary staging Platform, 2x2 x (1.80 + 1.50) x0.20 ° =2.64 sqm. |e Drain wall, 2x2 x 4.50 x 0.20 = 3.60 sqm. ape Total == 6.24 sqm. Wage@ Msam/sk-2,usk-1|.0.9 | 0 | 0.45 _| Shuttering- 6.24 sqm. Sino. Deseription of Item sk_|Ssk [Usk Materials 6 [Plaster (wo wall, floor, ceiling etc.) with sand and cement Platform wall, 2x 2(1.80 + 1.50) x 0.20 = 2.64 sqm. Platform, 140x110 <154,, Drain wall, 2x2 x 4.50°x0.20 =3.60,, Top & Bottom, 3 x 0.20 x 4.50 -2210,, ‘ Soak-pit, cover 1x3.14%0.55x0.55 =0.95,, Above GL, 1x2x3.14x 0.550.225 =0.78,, Total = 12.21 sqm. Sand-0.18 cum. Wage@ 18sam/sk-2, usk3| 136 | 0 | 2.04 | Cement-1.33 bags or Neat Cement punning te a i Vide hem no. 5 12.21 sqm. Wage @ S0sqmisk-2, usk-1] 0.49 | 0 | 0.24 | Coment-0.57 bag 8 |Labour for laying RCC. Ring with cover including all RCC Ring-4 nos R.CC Ring - 34ia, V'6"height = 4 nos. Matching cover LS mondags (elece 2 es [5 [Cabour for eurin Ls. oo Total 4150 «1397 Say so. 4 a a ABSTRACT ‘A) Labour wage: 14 nos. @Rs.191.00/no. Rs, 2674.00 B) Materials: 1. Stone boulder (63mm size) 0.82 cum. @Rs.958.60/n0. Rs. 786.00 2. Stone singles 0.94 cum. @Rs. 1090.00/cum. Rs, 1025.00 jh 3.Sand 0.65 cum. @Rs.650.00/eum. Rs, 423.00 4. Cement 8 bags @Rs.390.00/bag Rs, 3120.00 5. Shuttering 6.24 sqm. @Rs.160.00/sqm. Rs, 998,00 6.R.C.C. Ring 3'dia & V6" height 4 nos. @Rs.275.00ino. => Rs. 1100.00 7. Matching Cover Ino. @Rs.280.00/no. Rs, 280.00 ArGidlied 5 nos @Rs.382.00/no. Rs.1910.00 . 9 Bhpervisor Ino. @Rs.286.50/no. Rs, 287.00 10. Display Board LS. Rs, 3000.00 ; Total Rs. 12929.00 : Total Rs. A) Wage Rs, 2674.00 B) Materials Rs. 12929.00 Scheme Total Rs, 15603.00 Rupees: Fifteen thousand six hundred and three only. ~ DE aelooie Technical Assistant Dastnct NREGA Cell. Cooch Behan. Mantel Basti Drum vate for Raising Mixed fruit PI: ick & Pa ntation (Mango, Lemor ) surrounding Border areas of School under MG Unit size: 2X (70 mt in length + 50 mt in width) = 240 mn Plant population: 92 nos (Mango 12 nos, Lemon 6 nos, Guava 11 nos, Jamun 8 nos, Drumstick 6 nos & Papaya 49 nos) Spacing: $ mt ele for Mango, 4 mtc /e for Lemon, Guava &Drumstick , 10 mt ele for Jamun. Papaya will be planted as filer plant in between Mango, Lemon, Guava, Jamun & Drumstick A) Wage Component Description ofitems Quantity & Rate | Mandays_ |_| Demarcation, cleaning of planting site & ni ; alignment of planting pits és a i a Digging of pits. 99 nos X fet 756 cf 4 | Gsize of each pit: 20x2Ax2N = Ben)" ae a Mixing of top soil with organic manure & filling | cei @ 100 pits’ 7 usk 6 6 _[ Planting including carriage of plants @ 100 plants Suk 5 / 7 [Application of manures (@ 100 plants/ 5 usk 5 [8 [Staking, weeding, mulching ete (@ 100 plants/ 7 usk 6 Tntercultural Operation as well as application oF 9 | insecticide & fungicide. ai O0 pleom) 1O a . a ro | Fetene plants wit amo in on FPS | 10 an wk > Ti] Manual ivigation as & when required(12 Umea) | @ 100 plants/5 uskhime 35 Total 107 “Total unskilled labours = 107 nos X Rs. 191/- per usk = Rs. 20,437/- B) Material Component SIN. Description oftems Rate ‘Amount Cost of Planting materials: fi 1) Mango 12:n0s @Rs. 35/: por plant [Lemon 6 nos @Rs 2 per plant | Tobe i Guava 11 nos @Rs.24/- per plant | _ procured Jamun 8 nos. @Rs.10/- per plant | from other Drumstick seedling 6 nos @Rs 10/- per plant | fund. Papaya 98 nos. (49 no pits X 2 seedlings | @ Rs. 10/- per plant per pit = 98 nos) Cost of organic manure a) Cost of cow dung manure: 675 kg @Rs.3/- per kg Rs.2025/- Pe i) For Mango, Lemon, Guava, Jamun & Drumstick: 10 kg X 43 nos = 430 ke Ps (Cow dung manure 10 kg, per pit) is ii) For Papaya: 5 kg X 49 nos = 245 ke ee (Cow dung manure 5 kg per pit) b)_ Cost of Vermi compost: I kg X 92 nos. @Rs. 6/- per kg, Rs, $52/- (Yermi compost | kg per pit) 3__| Cost of insecticide & fungicide ts RS. 150 ‘4 [Cost of bamboo for fencing = 23 nos @Rs.102/- perno. | Rs. 23467. Cost of nylon net for fencing 120 mt. (3.5 fe height X mt | RS 10807 $ | 425 A tength per plant) err rem © | Cost of nylon rope for fencing 0.5 kg @RS.120/-perkg | Rs. 60 7 | Display Board Ls Rs. 1000/- | Provision of Semiskilled labour = SR 23 wsk=4 nos. | @RH2BES- per | Rs. 146 ssk Total Rs, 8359 ‘Total (Wage + Material) s.20,431/- (097%) + Rs. 8359/2909) =Rs. 28,7961. . ole ynical ORE cick regen 2 ‘ + 4 ’ | + | oe | : : 4 | 4 : 4 wore x $4 ic : fia 1Ls0dwod N IGS I WOO’. NaH Lm 3 2NIGTING 10, 0HIS | rae || =weosive WIT HOLT aon 2 bd 1¥0S uivag fT 2 ot ms BVHIG HOOD NI wag 9 Y3ENN AYVINDGD TOOHIS 3qISNI NOILVINYId Linyd Guim 11d 29¥BIvb yO L90dhkI aNY Lid AVOS 'NIVYd ‘Wandt-vi4 TIaM aan) Sind Nu

You might also like