Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
100%
(1)
100% found this document useful (1 vote)
781 views
4 pages
Model Estimate of Soakpit and Mixed Fruit
Estimates
Uploaded by
Mery Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Model Estimate of Soakpit and Mixed Fruit For Later
Download
Save
Save Model Estimate of Soakpit and Mixed Fruit For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
100%
(1)
100% found this document useful (1 vote)
781 views
4 pages
Model Estimate of Soakpit and Mixed Fruit
Estimates
Uploaded by
Mery Roy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Model Estimate of Soakpit and Mixed Fruit For Later
Carousel Previous
Carousel Next
Download
Save
Save Model Estimate of Soakpit and Mixed Fruit For Later
100%
100% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 4
Search
Fullscreen
Model Estimate for construction of Tube well Platform with Soak-Pit and Compost Pit under MGNREGA in the District Coochbehar Sino Description of ftem Sk_[Ssk [Usk Materials 1 [Earth work in excavation in foundation trenches ar drain lift Platform, 1 x 1.50 x 1.80 x 0.225 = 0.61 cum, Drain, 4.50 x 0.60 x 0.225 0.61, Soak-pit, 1 x 22/7 x 1.10/2 x 1.10/2 1.80 = 1.71, |Compost pit 1x 1.50.x 2.10 x 0.90 = 2.84, Total = 5.77 cum @1.T6cum.Jusk o | o | 328 12 Laying soling to proper cambér, hand packing, spreading] Stone boulder: powdered earth in the interestices with bricks and stones| 0.82 cum. b) Laterite boulder/stone boulder Drain, 1x4.50x 0.60 =2.700 sqm. Total = 5.40 sqm. Wage @30sqm/sk-1, usk-& ois} o | 07 5 [Cement concrete with 30 mm down graded shingles excluding Stone singles-0.39 On soling area, 5.40 x 0.075 = 0.41 cum. cum, — Sand-0.20 ad Total = 0.41 cum, J cum, Cement-1.83, @2lcunvsk-2, usk-3] 032 | 0 | 049 bags a ‘Ordinary cement concrete with 20mm down graded stone Platform, 2 x (1.80 + 1.50) x 0.20 x 0.20 = 0.26 cum. River bazree 0.55 Drain wall, 2x 4.50x 0.20.x 0.20 | cum, Sand- ‘Total 0.27 Cement-3.90 @2cum/sk-2,usk3 | 062} 0 | 093 bags [5 |Flire charge for shuttering with centreing and necessary staging Platform, 2x2 x (1.80 + 1.50) x0.20 ° =2.64 sqm. |e Drain wall, 2x2 x 4.50 x 0.20 = 3.60 sqm. ape Total == 6.24 sqm. Wage@ Msam/sk-2,usk-1|.0.9 | 0 | 0.45 _| Shuttering- 6.24 sqm. Sino. Deseription of Item sk_|Ssk [Usk Materials 6 [Plaster (wo wall, floor, ceiling etc.) with sand and cement Platform wall, 2x 2(1.80 + 1.50) x 0.20 = 2.64 sqm. Platform, 140x110 <154,, Drain wall, 2x2 x 4.50°x0.20 =3.60,, Top & Bottom, 3 x 0.20 x 4.50 -2210,, ‘ Soak-pit, cover 1x3.14%0.55x0.55 =0.95,, Above GL, 1x2x3.14x 0.550.225 =0.78,, Total = 12.21 sqm. Sand-0.18 cum. Wage@ 18sam/sk-2, usk3| 136 | 0 | 2.04 | Cement-1.33 bagsor Neat Cement punning te a i Vide hem no. 5 12.21 sqm. Wage @ S0sqmisk-2, usk-1] 0.49 | 0 | 0.24 | Coment-0.57 bag 8 |Labour for laying RCC. Ring with cover including all RCC Ring-4 nos R.CC Ring - 34ia, V'6"height = 4 nos. Matching cover LS mondags (elece 2 es [5 [Cabour for eurin Ls. oo Total 4150 «1397 Say so. 4 a a ABSTRACT ‘A) Labour wage: 14 nos. @Rs.191.00/no. Rs, 2674.00 B) Materials: 1. Stone boulder (63mm size) 0.82 cum. @Rs.958.60/n0. Rs. 786.00 2. Stone singles 0.94 cum. @Rs. 1090.00/cum. Rs, 1025.00 jh 3.Sand 0.65 cum. @Rs.650.00/eum. Rs, 423.00 4. Cement 8 bags @Rs.390.00/bag Rs, 3120.00 5. Shuttering 6.24 sqm. @Rs.160.00/sqm. Rs, 998,00 6.R.C.C. Ring 3'dia & V6" height 4 nos. @Rs.275.00ino. => Rs. 1100.00 7. Matching Cover Ino. @Rs.280.00/no. Rs, 280.00 ArGidlied 5 nos @Rs.382.00/no. Rs.1910.00 . 9 Bhpervisor Ino. @Rs.286.50/no. Rs, 287.00 10. Display Board LS. Rs, 3000.00 ; Total Rs. 12929.00 : Total Rs. A) Wage Rs, 2674.00 B) Materials Rs. 12929.00 Scheme Total Rs, 15603.00 Rupees: Fifteen thousand six hundred and three only. ~ DE aelooie Technical Assistant Dastnct NREGA Cell. Cooch Behan.Mantel Basti Drum vate for Raising Mixed fruit PI: ick & Pa ntation (Mango, Lemor ) surrounding Border areas of School under MG Unit size: 2X (70 mt in length + 50 mt in width) = 240 mn Plant population: 92 nos (Mango 12 nos, Lemon 6 nos, Guava 11 nos, Jamun 8 nos, Drumstick 6 nos & Papaya 49 nos) Spacing: $ mt ele for Mango, 4 mtc /e for Lemon, Guava &Drumstick , 10 mt ele for Jamun. Papaya will be planted as filer plant in between Mango, Lemon, Guava, Jamun & Drumstick A) Wage Component Description ofitems Quantity & Rate | Mandays_ |_| Demarcation, cleaning of planting site & ni ; alignment of planting pits és a i a Digging of pits. 99 nos X fet 756 cf 4 | Gsize of each pit: 20x2Ax2N = Ben)" ae a Mixing of top soil with organic manure & filling | cei @ 100 pits’ 7 usk 6 6 _[ Planting including carriage of plants @ 100 plants Suk 5 / 7 [Application of manures (@ 100 plants/ 5 usk 5 [8 [Staking, weeding, mulching ete (@ 100 plants/ 7 usk 6 Tntercultural Operation as well as application oF 9 | insecticide & fungicide. ai O0 pleom) 1O a . a ro | Fetene plants wit amo in on FPS | 10 an wk > Ti] Manual ivigation as & when required(12 Umea) | @ 100 plants/5 uskhime 35 Total 107 “Total unskilled labours = 107 nos X Rs. 191/- per usk = Rs. 20,437/- B) Material Component SIN. Description oftems Rate ‘Amount Cost of Planting materials: fi 1) Mango 12:n0s @Rs. 35/: por plant [Lemon 6 nos @Rs 2 per plant | Tobe i Guava 11 nos @Rs.24/- per plant | _ procured Jamun 8 nos. @Rs.10/- per plant | from other Drumstick seedling 6 nos @Rs 10/- per plant | fund. Papaya 98 nos. (49 no pits X 2 seedlings | @ Rs. 10/- per plant per pit = 98 nos) Cost of organic manure a) Cost of cow dung manure: 675 kg @Rs.3/- per kg Rs.2025/- Pe i) For Mango, Lemon, Guava, Jamun & Drumstick: 10 kg X 43 nos = 430 ke Ps (Cow dung manure 10 kg, per pit) is ii) For Papaya: 5 kg X 49 nos = 245 ke ee (Cow dung manure 5 kg per pit) b)_ Cost of Vermi compost: I kg X 92 nos. @Rs. 6/- per kg, Rs, $52/- (Yermi compost | kg per pit) 3__| Cost of insecticide & fungicide ts RS. 150 ‘4 [Cost of bamboo for fencing = 23 nos @Rs.102/- perno. | Rs. 23467. Cost of nylon net for fencing 120 mt. (3.5 fe height X mt | RS 10807 $ | 425 A tength per plant) err rem © | Cost of nylon rope for fencing 0.5 kg @RS.120/-perkg | Rs. 60 7 | Display Board Ls Rs. 1000/- | Provision of Semiskilled labour = SR 23 wsk=4 nos. | @RH2BES- per | Rs. 146 ssk Total Rs, 8359 ‘Total (Wage + Material) s.20,431/- (097%) + Rs. 8359/2909) =Rs. 28,7961. . ole ynical ORE cick regen2 ‘ + 4 ’ | + | oe | : : 4 | 4 : 4 wore x $4 ic : fia 1Ls0dwod N IGS I WOO’. NaH Lm 3 2NIGTING 10, 0HIS | rae || =weosive WIT HOLT aon 2 bd 1¥0S uivag fT 2 ot ms BVHIG HOOD NI wag 9 Y3ENN AYVINDGD TOOHIS 3qISNI NOILVINYId Linyd Guim 11d 29¥BIvb yO L90dhkI aNY Lid AVOS 'NIVYd ‘Wandt-vi4 TIaM aan) Sind Nu
You might also like
SV Layout Estimation
PDF
No ratings yet
SV Layout Estimation
4 pages
Model Estimate Vermi Nadep COMPOST
PDF
100% (3)
Model Estimate Vermi Nadep COMPOST
5 pages
Model Estimate Rain Water Harvesting
PDF
100% (1)
Model Estimate Rain Water Harvesting
19 pages
Community Hall Repairing Estimate Sahasram 15th
PDF
No ratings yet
Community Hall Repairing Estimate Sahasram 15th
4 pages
Model Estimates
PDF
75% (8)
Model Estimates
115 pages
Anganwadi Estimate Anthwar
PDF
No ratings yet
Anganwadi Estimate Anthwar
12 pages
Estimate - Chain Link On Compound Wall
PDF
No ratings yet
Estimate - Chain Link On Compound Wall
1 page
With Fountain Estimate
PDF
No ratings yet
With Fountain Estimate
8 pages
Estimate For Boundary Wall Full
PDF
No ratings yet
Estimate For Boundary Wall Full
8 pages
Septic Tank Estimate
PDF
No ratings yet
Septic Tank Estimate
18 pages
Estimate-RCC Cremation Shed
PDF
100% (1)
Estimate-RCC Cremation Shed
6 pages
Estimate For Tree Plantation Work
PDF
No ratings yet
Estimate For Tree Plantation Work
1 page
Road Estimate Nrega
PDF
No ratings yet
Road Estimate Nrega
7 pages
WDE - Anganwadi Building - Pasthala
PDF
No ratings yet
WDE - Anganwadi Building - Pasthala
52 pages
Estimate For OFFICE BUILDING 3rd-NEW RATE Corrected
PDF
No ratings yet
Estimate For OFFICE BUILDING 3rd-NEW RATE Corrected
10 pages
Samudayik Bhawan
PDF
No ratings yet
Samudayik Bhawan
13 pages
Civil Works (Final)
PDF
No ratings yet
Civil Works (Final)
182 pages
Module 2 Septic Tank and Rectangular Manhole Problems
PDF
No ratings yet
Module 2 Septic Tank and Rectangular Manhole Problems
9 pages
ESTIMATE AMETHI. CANOPYxlsx
PDF
No ratings yet
ESTIMATE AMETHI. CANOPYxlsx
223 pages
Cost Estimation-Dogs Park
PDF
No ratings yet
Cost Estimation-Dogs Park
136 pages
Quantity Estimate Store Room Final
PDF
No ratings yet
Quantity Estimate Store Room Final
15 pages
Gram Panchayat: Estimate of Sinking of A New Tubewell at
PDF
100% (1)
Gram Panchayat: Estimate of Sinking of A New Tubewell at
8 pages
CC Drains New
PDF
No ratings yet
CC Drains New
29 pages
Model Estimate For Hume Pipe Culvert Dia - Hume Pipe
PDF
100% (1)
Model Estimate For Hume Pipe Culvert Dia - Hume Pipe
5 pages
Estimate of Box Culvert - at KM 24.890
PDF
No ratings yet
Estimate of Box Culvert - at KM 24.890
11 pages
Nala Bund Drawing & Estimate
PDF
No ratings yet
Nala Bund Drawing & Estimate
7 pages
NPL, Estimate of Boundary Wall
PDF
No ratings yet
NPL, Estimate of Boundary Wall
24 pages
Compound Wall Estimate
PDF
No ratings yet
Compound Wall Estimate
10 pages
Boundary Wall NIT 3-1
PDF
No ratings yet
Boundary Wall NIT 3-1
2 pages
Community Hall & Mosque T.S
PDF
No ratings yet
Community Hall & Mosque T.S
239 pages
Renovation Talab Khamariyamal
PDF
No ratings yet
Renovation Talab Khamariyamal
14 pages
Vol. 3 - BOQ
PDF
No ratings yet
Vol. 3 - BOQ
22 pages
Plantation of Trees and Fencing of Open Spaces.
PDF
No ratings yet
Plantation of Trees and Fencing of Open Spaces.
8 pages
Anganwaadi Model Building Estimate
PDF
No ratings yet
Anganwaadi Model Building Estimate
860 pages
Construction of RCC Ring Well Near Kendubasti Namghar
PDF
100% (1)
Construction of RCC Ring Well Near Kendubasti Namghar
14 pages
Dome Shed - Final
PDF
100% (1)
Dome Shed - Final
4 pages
Basic Schedule of Rates 2017
PDF
100% (2)
Basic Schedule of Rates 2017
103 pages
Amrit Sarover Scheme Detailed Estimate of Construction of Pond
PDF
100% (1)
Amrit Sarover Scheme Detailed Estimate of Construction of Pond
4 pages
Schedule of Rates For Almora Uttarakhand India
PDF
0% (2)
Schedule of Rates For Almora Uttarakhand India
184 pages
Compoundwall Model Estimate 2 1
PDF
No ratings yet
Compoundwall Model Estimate 2 1
271 pages
ESTIMATE NO Demo Stop Dam
PDF
50% (2)
ESTIMATE NO Demo Stop Dam
4 pages
Community Hall Estimation Report
PDF
No ratings yet
Community Hall Estimation Report
11 pages
Model Estimate For Hume Pipe Culvert Dia - 600 MM
PDF
No ratings yet
Model Estimate For Hume Pipe Culvert Dia - 600 MM
6 pages
Drain Estimate
PDF
No ratings yet
Drain Estimate
17 pages
Public Health Data 2010-11
PDF
No ratings yet
Public Health Data 2010-11
40 pages
Pink Toilet
PDF
No ratings yet
Pink Toilet
3 pages
Estimate Road Nuwakot 2077 078
PDF
No ratings yet
Estimate Road Nuwakot 2077 078
116 pages
Estimate 5 Final
PDF
No ratings yet
Estimate 5 Final
18 pages
BCD Sor
PDF
No ratings yet
BCD Sor
1,067 pages
BOQ and Rate For Boundary Wall
PDF
No ratings yet
BOQ and Rate For Boundary Wall
2 pages
Estimate For Construction of Boundary Wall of Graveyard at
PDF
No ratings yet
Estimate For Construction of Boundary Wall of Graveyard at
5 pages
Hume Pipe Culvert Estimate
PDF
100% (1)
Hume Pipe Culvert Estimate
3 pages
Rates Analysis
PDF
No ratings yet
Rates Analysis
867 pages
CMSC Toilet Estimate Rs. 3.0 Lakhs
PDF
100% (1)
CMSC Toilet Estimate Rs. 3.0 Lakhs
9 pages
House Construction Materials Rate in Ke... T Rate of Building Materials in Kerala
PDF
No ratings yet
House Construction Materials Rate in Ke... T Rate of Building Materials in Kerala
18 pages
1 Excavation: SR - No. Iteam Unit Labour Rate
PDF
No ratings yet
1 Excavation: SR - No. Iteam Unit Labour Rate
18 pages
Building Estimate Format
PDF
No ratings yet
Building Estimate Format
3 pages
Agriculture Cost Estimate
PDF
No ratings yet
Agriculture Cost Estimate
42 pages
Agriculture Cost Estimate
PDF
No ratings yet
Agriculture Cost Estimate
40 pages
Agriculture Cost Estimate
PDF
No ratings yet
Agriculture Cost Estimate
41 pages