PGCB
PGCB
13. Over-current and earth fault protection need to be provided for N/A
33kV side as well as 0.415kVSide of the earthing transformer.
`
14. Synchrocheck functions have to be activated for both 230k V and N/A as discussed with
132kV side CB of the Transformer. PGCB Design &
Protection Department.
15. No overall differential protection is provided for T02. It is (Out of scope) PGCB will
recommended to provided overall differential protection for the supply 1 No. differential
transformer covering the post CTs. The relay may supplied from the relay type 7UT86 of
store of PGCB as required; necessary design, installation, testing and SIEMENS. ENERGYPAC
commissioning works have to be done by the contractor. will do the installation
works for T-02
transformer.
`