0% found this document useful (0 votes)
965 views11 pages

RTCC Cable Schedule

This document provides a cable schedule for the RTCC panel located at the 33/11kV Bhairab Power Plant. It lists 20 cables connecting the RTCC panel to equipment such as the DCDB, 11kV incoming line, LVAC panel, a second RTCC panel, and the fan control box. The cables range from 2 to 14 cores and vary in length from 1712m to 1715m, carrying signals for DC supply, AC supply, and control functions between the different pieces of equipment in the power plant.

Uploaded by

arafin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
965 views11 pages

RTCC Cable Schedule

This document provides a cable schedule for the RTCC panel located at the 33/11kV Bhairab Power Plant. It lists 20 cables connecting the RTCC panel to equipment such as the DCDB, 11kV incoming line, LVAC panel, a second RTCC panel, and the fan control box. The cables range from 2 to 14 cores and vary in length from 1712m to 1715m, carrying signals for DC supply, AC supply, and control functions between the different pieces of equipment in the power plant.

Uploaded by

arafin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

DCDB CABLE SCHEDULE

NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT DCDB
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
3400 RTCC 1 X50D:1 3400-1/X50D:1 +DC 3400-1/+DC DC SUPPLY 1715
DCDB
2CX4SQMM PANEL 2 X50D:3 3400-2/X50D:3 -DC 3400-2/-DC DC SUPPLY 1715
11KV INC. LINE PT TO RTCC PANEL
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT AC PANEL CIRCUIT
FROM TO
CABLE NO. TERMINAL TERMINAL
EQUIPMENT Core No
NO.
FERRULE NO. EQUIPMENT
NO.
FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X 3200-1/X X50E:5 3200-1/X50E:5 1712
3200 11KV INC. 2 X 3200-2/X X50E:6 3200-2/X50E:6 1712
RTCC
4CX2.5SQMM LINE PT 3 X 3200-3/X X50E:7 3200-3/X50E:7 1712
4 X 3200-4/X X50E:8 3200-4/X50E:8 1712
LVAC CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT AC PANEL CIRCUIT
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X1:1 3300-1/X1:1 L1 3300-1/L1 AC Supply 1705
3300 Transformer 2 X1:3 3300-2/X1:3 L2 3300-2/L2 AC Supply 1705
LVAC
4CX10SQMM MK 3 X1:5 3300-3/X1:5 L3 3300-3/L3 AC Supply 1705
4 - - - - SPARE -

NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT AC PANEL CIRCUIT
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
3301 1 +H 3301-1/+H X50H:1 3301-1/X50H:1 AC Supply 1712
LVAC RTCC
2CX4SQMM 2 -N 3301-2/-N X50H:3 3301-2/X50H:3 AC Supply 1712
RTCC PANEL-1 TO RTCC PANEL-2 CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT RTCC PANEL-2
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X52:7 3500-1/X52:7 X52:23 3500-1/X52:23 Control 1713
2 X52:8 3500-2/X52:8 X52:24 3500-2/X52:24 Control 1713
3 X52:21 3500-3/X52:21 X52:26 3500-3/X52:26 Control 1713
3500 RTCC 4 X52:20 3500-4/X52:20 RTCC X52:25 3500-4/X52:25 Control 1713
8CX2.5SQMM PANEL-1 5 - - PANEL-2 - - SPARE -
6 - - - - SPARE -
7 - - - - SPARE -
8 - - - - SPARE -
RTCC PANEL TO FAN CONTROL BOX CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT FAN CONTROL BOX
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X52:36 3501-1/X52:36 X1:9 3501-1/X1:9 Control 1705
2 X52:37 3501-2/X52:37 X1:10 3501-2/X1:10 Control 1705
3 X52:51 3501-3/X52:51 X1:19 3501-3/X1:19 Control 1705
4 X52:52 3501-4/X52:52 X1:18 3501-4/X1:18 Control 1705
5 X52:31 3501-5/X52:31 X1:35 3501-5/X1:35 Control 1314
6 X52:32 3501-6/X52:32 X1:41 3501-6/X1:41 Control 1314
3501 7 X52:44 3501-7/X52:44 FAN CONTROL X1:36 3501-7/X1:36 Control 1314
RTCC PANEL
14CX2.5SQMM 8 X52:45 3501-8/X52:45 BOX X1:37 3501-8/X1:37 Control 1314
9 X52:46 3501-9/X52:46 X1:42 3501-9/X1:42 Control 1314
10 - - - - SPARE -
11 - - - - SPARE -
12 - - - - SPARE -
13 - - - - SPARE -
14 - - - - SPARE -
1 X53:4 3502-1/X53:4 X1:43 3502-1/X1:43 Control 1715
3502 2 X53:13 3502-2/X53:13 FAN CONTROL X1:44 3502-2/X1:44 Control 1715
RTCC PANEL
4CX2.5SQMM 3 X53:14 3502-3/X53:14 BOX X1:37 3502-3/X1:37 Control 1715
4 - - - - SPARE -
1 X51O:1 3503-1/X51O:1 X 3503-1/X Control 1712
3503 2 X51O:2 3503-2/X51O:2 FAN CONTROL X 3503-2/X Control 1712
RTCC PANEL
4CX2.5SQMM 3 - - BOX - - SPARE -
4 - - - - SPARE -
1 X51W:1 3504-1/X51W:1 X 3504-1/X Control 1712
3504 2 X51W:2 3504-2/X51W:2 FAN CONTROL X 3504-2/X Control 1712
RTCC PANEL
4CX2.5SQMM 3 - - BOX - - SPARE -
4 - - - - SPARE -
1 X51W:1 3505-1/X51W:1 X 3505-1/X Control 1712
3505 2 X51W:2 3505-2/X51W:2 FAN CONTROL X 3505-2/X Control 1712
RTCC PANEL
4CX2.5SQMM 3 - - BOX - - SPARE -
4 - - - - SPARE -
RTCC PANEL TO MOTOR DRIVE BOX CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT MOTOR DRIVE BOX
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 43-R:D 3506-1/43-R:D X1:12 3506-1/X1:12 Control 1711
MOTOR
3506 2 43-R:4 3506-2/43-R:4 X1:13 3506-2/X1:13 Control 1711
RTCC PANEL DRIVE
4CX2.5SQMM 3 - - - - SPARE -
BOX
4 - - - - SPARE -
1 X52:45 3507-1/X52:45 TB:X 3507-1/TB:X Control 1712
2 X52:46 3507-2/X52:46 TB:X 3507-2/TB:X Control 1712
3 X52:47 3507-3/X52:47 TB:X 3507-3/TB:X Control 1712
4 X52:1 3507-4/X52:1 X1:13 3507-4/X1:13 Control 1713
5 X52:6 3507-5/X52:6 X1:15 3507-5/X1:15 Control 1713
6 X52:8 3507-6/X52:8 X1:10 3507-6/X1:10 Control 1713
MOTOR
3507 RTCC 7 X52:19 3507-7/X52:19 X1:7 3507-7/X1:7 Control 1713
DRIVE
14CX2.5SQMM PANEL 8 X52:21 3507-8/X52:21 X1:11 3507-8/X1:11 Control 1713
BOX
9 X52:27 3507-9/X52:27 1 3507-9/'1' Control 1314
10 - - - - SPARE -
11 - - - - SPARE -
12 - - - - SPARE -
13 - - - - SPARE -
14 - - - - SPARE -
SCADA TO FAN CONTROL BOX
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT SCADA
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X54:2 3508-1/X54:2 X1:38 3508-1/X1:38 Control 1716
2 X54:8 3508-2/X54:8 X1:39 3508-2/X1:39 Control 1716
3 X54:9 3508-3/X54:9 X1:40 3508-3/X1:40 Control 1716
FAN
3508 4 X54:10 3508-4/X54:10 X1:46 3508-4/X1:46 Control 1716
SCADA CONTROL
8CX2.5SQMM 5 - - - - SPARE -
BOX
6 - - - - SPARE -
7 - - - - SPARE -
8 - - - - SPARE -
RTCC PANEL TO TAP CHANGER BOX CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT TAP CHANGER BOX
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X52:28 3509-1/X52:28 X1:17 3509-1/X1:17 Control 1714
2 X52:29 3509-2/X52:29 X1:19 3509-2/X1:19 Control 1714
3 X52:41 3509-3/X52:41 X1:18 3509-3/X1:18 Control 1714
3509 4 X52:42 3509-4/X52:42 TAP CHANGER X1:20 3509-4/X1:20 Control 1714
RTCC
8CX2.5SQMM 5 - - BOX - - SPARE -
6 - - - - SPARE -
7 - - - - SPARE -
8 - - - - SPARE -
11KV CRP TO RTCC PANEL
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT 11KV CRP
FROM TO
CABLE NO.
EQUIPMENT Core No TERMINAL NO. FERRULE NO. EQUIPMENT TERMINAL NO. FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X 3510-1/X X50E:1 3510-1/X50E:1 Control 1312
3510 2 X 3510-2/X X50E:3 3510-2/X50E:3 Control 1312
11KV CRP RTCC
4CX2.5SQMM 3 - - - - SPARE -
4 - - - - SPARE -
RTCC PANEL TO MOTOR DRIVE BOX-2 CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT MOTOR DRIVE BOX(2)
FROM TO
CABLE NO. TERMINAL TERMINAL
EQUIPMENT Core No
NO.
FERRULE NO. EQUIPMENT
NO.
FERRULE NO. DESCRIPTION Page LENGTH(M)
1 X52:40 3511-1/X52:40 1 3511-1/'1' Control 1714
MOTOR
3511 RTCC 2 - - - - SPARE -
DRIVE
4CX2.5SQMM PANEL 3 - - - - SPARE -
BOX(2)
4 - - - - SPARE -
RTCC PANEL TO FAN CONTROL BOX CABLE SCHEDULE
NAME OF BAY: RTCC PANEL LOCATION: 33/11KV BHAIRAB POWER PLANT DRIVE BOX-2
FROM TO
CABLE NO. TERMINAL TERMINAL
EQUIPMENT Core No
NO.
FERRULE NO. EQUIPMENT
NO.
FERRULE NO. DESCRIPTION Page LENGTH(M)
1 2 3512-1/'2' 2 3512-1/'2' Control 1714
2 3 3512-2/'3' 3 3512-2/'3' Control 1714
3 4 3512-3/'4' 4 3512-3/'4' Control 1714
4 5 3512-4/'5' 5 3512-4/'5' Control 1714
5 14 3512-5/'14' 14 3512-5/'14' Control 1714
6 15 3512-6/'15' 15 3512-6/'15' Control 1714
3512 7 16 3512-7/'16' 16 3512-7/'16' Control 1714
DRIVE BOX-1 DRIVE BOX-2
14CX2.5SQMM 8 - - - - SPARE -
9 - - - - SPARE -
10 - - - - SPARE -
11 - - - - SPARE -
12 - - - - SPARE -
13 - - - - SPARE -
14 - - - - SPARE -