Ocbc Bank-Kepong: Technical Proposal For Fixed Network Access

The document provides a technical proposal for providing fixed network access to OCBC Bank in Kepong, Kuala Lumpur. It includes photos documenting the proposed works, which include horizontal directional drilling to install new fiber optic cables from existing Maxis manholes to a new Maxis underground inspection pit, and then running fiber optic cables above ground from the pit to the OCBC server room. It also shows the proposed installation of a new Maxis optical distribution frame and equipment at the OCBC server rack.

Uploaded by

Loga HS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views14 pages

Ocbc Bank-Kepong: Technical Proposal For Fixed Network Access

The document provides a technical proposal for providing fixed network access to OCBC Bank in Kepong, Kuala Lumpur. It includes photos documenting the proposed works, which include horizontal directional drilling to install new fiber optic cables from existing Maxis manholes to a new Maxis underground inspection pit, and then running fiber optic cables above ground from the pit to the OCBC server room. It also shows the proposed installation of a new Maxis optical distribution frame and equipment at the OCBC server rack.

Uploaded by

Loga HS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Technical Proposal for Fixed Network Access

TECHNICAL PROPOSAL FOR FIXED NETWORK ACCESS INTO

OCBC BANK- KEPONG


60, Jalan Metro Prima, Metro Prima, 52100
Kuala Lumpur, Wilayah Persekutuan Kuala
Lumpur
Prepared by:

IVOCOM (M) SDN BHD

1
Technical Proposal for Fixed Network Access
TABLE OF CONTENTS

1. APPENDIX A – FIXED NETWORK

1.1 Proposed Maxis Civil/ OSP Fiber Works for OCBC Kepong– Photos

2
Technical Proposal for Fixed Network Access

1.1 Proposed Maxis Civil/ OSP Fiber Works – Photos

Proposed HDD 1-
Way Works

Existing Maxis
Manhole

Picture 1: : Existing Maxis Manhole at Jalan Kepong

Proposed HDD 1-
Way Works

Picture 2: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Kepong

3
Technical Proposal for Fixed Network Access

Proposed HDD 1-
Way Works

Picture 3: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Prima 5, Kepong

Proposed HDD 1-
Way Works

Picture 4: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Prima 5,Kepong

4
Technical Proposal for Fixed Network Access

Proposed HDD 1-
Way Works

Picture 5: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Prima 5, Kepong

Proposed HDD 1-
Way Works

Picture 6: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Prima 5, Kepong

5
Technical Proposal for Fixed Network Access

Proposed HDD 1-
Way Works

Picture 7: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Prima 5, Kepong

Picture 8: Proposed New HDD 1- Way works from Existing Maxis manhole to Proposed New
Maxis PIT along Jalan Prima 5, Kepong

6
Technical Proposal for Fixed Network Access

Proposed HDD 1-
Way Works

Proposed New
Maxis PIT

Picture 9: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC Server
Room at Level 1

Proposed New
Fiber Route Works

Picture 10: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

7
Technical Proposal for Fixed Network Access

Proposed New
Fiber Route Works

Picture 11: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

Proposed New
Fiber Route Works

Picture 12: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

8
Technical Proposal for Fixed Network Access

Proposed New
Fiber Route Works

Picture 13: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

Proposed New
Fiber Route Works

Picture 14: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

9
Technical Proposal for Fixed Network Access

Proposed New
Fiber Route Works

Picture 15: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

Proposed New
Fiber Route Works

Picture 16: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

10
Technical Proposal for Fixed Network Access

Proposed New
Fiber Route Works

Picture 17: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

Proposed New
Fiber Route Works

Picture 18: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

11
Technical Proposal for Fixed Network Access

Proposed New
Fiber Route Works

Picture 19: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

Proposed New
Fiber Route Works

Picture 20: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

12
Technical Proposal for Fixed Network Access

Proposed New
Fiber Route Works

Picture 21: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

Proposed New
Fiber Route Works

Picture 22: Proposed New OSP Fiber Cable Route from Proposed New Maxis PIT to OCBC
Server Room at Level 1

13
Technical Proposal for Fixed Network Access

Proposed New
Maxis ODF and
Maxis Equipment

Picture 23: Proposed Install New Maxis ODF and Maxis Equipment at OCBC Server Rack

Picture 22: OCBC server rack

14

You might also like