Power Plant
Power Plant
Presentation
By: Arhum Anjum
Trainee Engineer (E&I)
Contents
► ARL power plant.
► New power plant.
► Old/existing power plant.
► Generator.
► Working of alternator.
► Working of diesel engine.
► Single line diagram.
► Software and PLC used.
► Auxiliaries Systems of plant and engine.
► SaCos one.
► Generator control.
► CCP.
► Engine Start/Stop, load control and synchronization.
ARL Power Plant
96V
Working of Diesel Engine
SaCoS
Generator Control
Common control
Engine Start
► To start the engine, 30bar of compressed air is used to push the piston that
is at top most position. This starts the engine cycle and engine is started.
Engine Stop
Generator Auto - shutdown list
Alarm Description Setpoint
Engine Over Speed 832rpm
Main Bearing temp high 103°C
Lube oil pressure inlet low 1.7bar,(n<600rpm)
2.5bar,(n>600rpm)
Lube oil inlet temperature high 73°C
Lube oil pressure turbocharger low 0.9bar
Lube oil temperature turbocharger A & B outlet high 140°C
Oil-mist concentration high 2%
Splash – oil temperature mean value deviation +6k
HTCW pressure engine inlet high 1.0bar,(n<600rpm)
1.5bar,(n>600rpm)
HTCW temperature engine outlet high 98°C
Emergency stop air pressure low 10bar
Loss of signals of any of the sensors
Load- Synchronization
Load Synchronization
With WAPDA
Load Sharing for Balancing load
Load sharing in HMI
Load Priority Table
Feeder Load
Bungalow 2500KW
Increasing Priority
LPG/Boiler 1000KW
HBU-I,HBU-II & Preflash 1360KW
HCU/WPH 800KW
Reformer 1000KW
SS-1 2600KW
SS-2 2600KW
Thank you