PMO Implementation Dashboard

The PMO implementation status dashboard shows that the number of projects with PMO oversight has increased by 50 from the start to the current number of 200, representing a 33% increase. While the cost status is amber and schedule status is green, the overall status is complete. However, the scope and resources statuses are both not started. For the standard PMO functions, most aspects are shown in red, indicating they are behind schedule.

Uploaded by

Ismail Moolla
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
404 views

PMO Implementation Dashboard

The PMO implementation status dashboard shows that the number of projects with PMO oversight has increased by 50 from the start to the current number of 200, representing a 33% increase. While the cost status is amber and schedule status is green, the overall status is complete. However, the scope and resources statuses are both not started. For the standard PMO functions, most aspects are shown in red, indicating they are behind schedule.

Uploaded by

Ismail Moolla
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

<NAME> PMO Implementation Status Dashboard

Overall Cost Schedule Scope Resources


PMO
Implementation
Status

Projects with PMO Oversight Standard Function Implementation Status


0% 50%
No at Start 150 Scale
No Current 200 1. Objectives
Increase / Decrease 50 2. Vision
% Change 33.3333333333 3. Mission
4. Roles & Resp
Budget with PMO Oversight 5. Governance
6. Organisation
Budget at Start 0 7. Planning
Budget Current 0 8. Cost
Increase / Decrease 0 9. Benefit
% Change #DIV/0! 10. RAIDs
11. Reporting
Benefit with PMO Oversight 12. Quality Assurance
13. Change Control
Benefit at Start 0 14. Resource
Benefit Current 0 15. Communications
Increase / Decrease 0 16. Procurement
% Change #DIV/0! 17. Document Storage
Use the drop down to select status for each measure.

Overall Cost Schedule


PMO
Implementation
Status Complete Amber Green
Scope Resources

Not Started Not Started


No at Start 150
No Current 200
Increase / Decrease 50
% Change 33.33
Budget at Start 0
Budget Current 0
Increase / Decrease 0
% Change #DIV/0!
Benefit at Start
Benefit Current
Increase / Decrease 0
% Change #DIV/0!
Scale 100
1. Objectives 10 Red
2. Vision 20 Red
3. Mission 30 Red
4. Roles & Resp 40 Red
5. Governance 50 Red
6. Organisation 60 Red
7. Planning 70 Red
8. Cost 80 Red
9. Benefit 90 Red
10. RAIDs 100 Red
11. Reporting 10
12. Quality Assurance 20
13. Change Control 30
14. Resource 40
15. Communications 50
16. Procurement 60
17. Document Storage 70