Takt Time
OEE
EPEI
Capacity Analysis
Single Stack
OBC
www.fleming-consulting.com
leming
Consulting, LLC
Stacked OBC Standard Work In Process
Kanban
Click on this symbol
Pitch =
to return home
Average Cycle Time
FPY
Productivity
Inventory Turns
www.fleming-consulting.com
Takt Time Calculation =
F
Enter the following information: C
Available Work Time/Period 86400 Seconds
Notes:
Planned Downtime
Breaks 15 Minutes
Shift Meeting 5 Minutes
PM / 5S 5 Minutes
TBD Minutes
0.4 Hours Scheduled Uptime 7.6 Hours 455 25
Downtime Losses
Changeovers 60 Minutes
Breakdowns 12 Minutes
Lack of Components 0 Minutes
TBD Minutes
1.2 Hours Available Rate 84.2% 72
Performance Rate
Process Cycle Time 60 Seconds Missing In Action 53 Parts Actual Good Uptime
315
Total # Of Parts Produced 330 Performance Rate 86.2%
Quality Rate
Changeovers/Day
3.5
2.5
1.5
0.5
0
PA OH0 FA
Unload / Start Time Machine C/T Takt Time Planned C/T MEMCT
FA
/T Takt Time Planned C/T MEMCT
Notes:
F
C
1440 Minutes/Day
814 Minutes/Day
341 Minutes/Day
285 Minutes/Day
847 Units
21.8 /Day
Single Stack Chart =
F
Enter the following information: C
Work Element Description Time(sec) Station Description
Element 1 5
Element 2 5
Element 3 5
Element 4 5
Element 5 5
Element 6 5
Element 7 5
Element 8 5
Element 9 5
Element 10 5
Element 11 5
Element 12 5
Element 13 5
Element 14 5
Element 15 5
Element 16 5
Element 17 5
Element 18 5
Element 19 5
Element 20 5
Element 21 5
Element 22 5
Element 23 5
Element 24 5
Element 25 5
Notes:
Single Stack Chart
130
125
120
115 Element 25 Element 24
110
105 Element 23 Element 22
Time (Seconds)
100
Element 21 Element 20
95
90 Element 19 Element 18
85
80 Element 17 Element 16
75
Element 15 Element 14
70
65 Element 13 Element 12
60
55 Element 11 Element 10
50
Element 9 Element 8
45
40 Element 7 Element 6
35
30 Element 5 Element 4
25
Element 3 Element 2
20
15
Element 1
10
5
0
Operator Balance Chart
140 140
Time (Seconds)
130
120 120
110
100 100
90
80 80
70
60 60
50
40 40
30
20 20
10
0 0
Operator 1 Operator 2 Operator 3 Operator 4 Operator 5 Operator 6
Lowest Repeatable Cycle Average Cycle Takt Planned Cycle Time Variation
Minimum Operator Cycle
60 Element 9 60 Element 9
60 Element 9 60 Element 9
60 Element 9
55 55 55 55 55
Element 8 Element 8 Element 8 Element 8 Element 8
50 50 50 50 50
Element 7 Element 7 Element 7 Element 7 Element 7
45 45 45 45 45
Element 6 Element 6 Element 6 Element 6 Element 6
40 40 40 40 40
Element 5 Element 5 Element 5 Element 5 Element 5
35 35 35 35 35
Element 4 Element 4 Element 4 Element 4 Element 4
30 30 30 30 30
Element 3 Element 3 Element 3 Element 3 Element 3
25 25 25 25 25
Element 2 Element 2 Element 2 Element 2 Element 2
20 20 20 20 20
Element 1 Element 1 Element 1 Element 1 Element 1
15 15 15 15 15
10 Planned Cycle Time Planned Cycle Time 10 Planned Cycle Time Planned Cycle Time Planned Cycle Time
10 10 10
0 0 0 0 0
Operator #1 Operator #2 Operator #3 Operator #4 Operator #5
Note: Assure the Y-axis (Seconds) for each chart are scaled the same.
Notes:
100%
Notes:
Standard Work In Process Calculation =
F
Enter the following information: C
Takt Time 40.0 Seconds/Unit 3.0 Units of Inventory
Notes:
Tools 4 180 seconds or more 1 must leave work area and search
Fixtures 1 60 seconds or less 2 must leave immediate work area
Parts & materials 3 20 seconds or less 3 within work area / must search or choose
Supplies 2 7 seconds or less 4 within work station / one step away
Power Tools 2 2 seconds or less 5 within range of natural motion / strike zone
Tools
5