13 - Risk Analysis
13 - Risk Analysis
Material surface quality 3 3 9 Accept Final product quality Shot blast the wheel Observe surface quality be
0
Risk Analysis - Scoring Ex
1.0 Risk scoring
Impact
Very low Low Moderate High Very high
Very high Medium Medium High High High
Probability
Technique Description
Avoid Make changes on the project to avoid completely
Transfer Transfer threat & response to a third party
Mitigate Taking action to reduce the probability and/or impact of the risk
Accept Decision not to make changes on the project to avoid risk
Scoring Explanations
Impact
Scope Quality
Cannot achieve major program requirement / feature Very significant impact on overall functionality
Major slip in key requirements / features Significant impact on overall functionality
Moderate slip in key requirement / feature Some impact in key functional areas
Minor slip in requirement / feature Minor impact on overall functionality
Minimal or no impact Minor impact on secondary functions
Work Instruction-Risk a
1) During a 2) The next step, still in team, is 3) This section is an analysis of
group to make an evaluation of the the IMPACT of the risk on the
brainstorm, PROBABILITY that the risk project's progress. Impact need
one after the occurs during the project. to be assessed in order of
other, each of Probability needs to be magnitude between 1-10. Impact
the team assessed in order of magnitude with 10 being more likely to
members set between 1-10. Risks with 10 infuence the project process and
out a RISK being the most likely to occur 1 being the one with the least 4) The TOTAL rep
that could and 1 being the one with the impact. Refer to the legend 1.0- magnitude of this
arise during least likely to occur. Refer to the Risk scoring for details. 100. This will allow
the project. legend 1.0-Risk scoring for from highest to lo
This details. response on the h
brainstorming
will allow
participation of
the entire team
and ensure
that all RISKS
are
considered.