General Specifications: Model PM4S7770 Interface Package For GE Energy's System 1®
General Specifications: Model PM4S7770 Interface Package For GE Energy's System 1®
[Release 4]
n OVERVIEW
The Interface for GE Energy’s System 1 is a PRM optional package for connecting PRM with the System 1
Optimization and Diagnostics Software Platform. System 1 is a condition monitoring and event diagnostics
software platform for managing the plant machinery assets. It is used for monitoring and diagnosing the rotating or
reciprocating equipment and optimizing plant operations. After connecting System 1 and PRM through the interface
for System 1, the information about the assets monitored with System 1 can be integrated into PRM. The plant
operators can promptly acquire the information about the machinery asset in real time.
n SYSTEM CONFIGURATION
A system configuration is shown as follows:
PRM client
System 1 client
Ethernet
Field communications
server PRM server System 1 server
Interface for GE
Energy’s System 1
Bus 2
Vnet/IP
Bus 1
FCS
Bently Nevada
3300/3500
F01E.ai
The Interface for GE Energy’s System 1 can run on a computer in which the PRM server is installed.
A System 1 platform consists of System 1 Client and System 1 Server. System 1 Server contains the database of
the plant machinery assets. The data collected by the Bently Nevada™ 3300, 3500 or Trendmaster® Pro monitoring
system are stored in this database for plant condition monitoring and event diagnosis. System 1 Server and PRM
Server can be connected through Ethernet, thus, PRM can manage the health status of the plant equipment according
to the condition monitoring events and diagnostic events sent from System 1.
Moreover, when System 1 Client is installed in the computer in which PRM Client is installed, the detail plot display
of System 1 can be launched from the Device Navigator window or maintenance alarm of PRM with the System 1
Display Software.
Note: Data exchange between PRM and System 1 is carried out through the OPC interface. It is necessary to configure the PRM
Server and System 1 Server on a same network. If a firewall is placed between PRM Server and System 1 Server, the data
exchange between the two servers may not be properly carried out. As long as the System 1 OPC server is on the same
side of the firewall as the PRM server it will work.
Note: To launch System 1 Display Software, the System 1 Client should be installed in the computer in which PRM Client is
installed.
l Engineering Support
Plant Hierarchy of System 1 can be imported to PRM
System 1 hierarchy (Enterprise and Instrumental Hierarchy) and asset information can be imported to PRM. In
PRM, System 1 hierarchy (Enterprise and Instrument Hierarchy) and asset information can be imported to PRM. In
PRM, a tool for mapping System 1 hierarchy into PRM hierarchies is available. The System 1 hierarchy (Enterprise
and Instrument Hierarchy) and asset information for importing to PRM needs to be exported from System 1 using
a dedicated tool. MIMOSA Common Relational Information Schema ( CRIS ) V3.1 standard will be used for this
interface.
n OPERATION ENVIRONMENT
l Software Environment
The Interface for GE Energy’s System 1 can run in the computer in which PRM Server is installed.
The version of System 1 should be V6.5, 6.75, or 6.81. (*1) (*2)
System 1 Client should be installed in the same computer in which PRM Client is installed. System 1 Server cannot
be installed in the computer in which PRM packages (PRM Client, PRM Server) Field Communications Server are
installed.
Note: When PRM and System 1 are connected, a System 1 OPC A&E Data Exporter (the software licenses are required for each
connected destination) and the tool for exporting the System 1 system configuration, the Hierarchy Exporter, is needed. For
displaying the System 1 Client contents on PRM Client, the System 1 Display Software is required.
*1: When using Version 6.5 of System 1, System 1 Client cannot be installed on a computer where PRM is resided.
*2: For using V6.75 or 6.81 of System 1, the System 1 client cannot be installed on a computer where PRM Server is resided.
l Hardware Environment
This package runs on a computer where PRM server (PM4S7700) is installed.
Refer to the GS “Plant Resource Manager (R4)” (GS 30B05A10-01EN) for the PRM server operating environment.
All Rights Reserved. Copyright © 2018, Yokogawa Electric Corporation GS 30B05A22-01EN Apr. 12, 2018-00
<<Contents>> <<Index>> 3
n MODEL AND SUFFIX CODE
Interface Package for GE Energy’s System 1
Description
Model PM4S7770 Interface Package for GE Energy’s System 1
-V Software license
Suffix
1 Always 1
Codes
1 English version
n ORDERING INFORMATION
Specify model and suffix codes.
n TRADEMARK ACKNOWLEDGMENT
The names of corporations, organizations, products and logos herein are either registered trademarks or trademarks
of Yokogawa Electric Corporation and their respective holders.
All Rights Reserved. Copyright © 2018, Yokogawa Electric Corporation GS 30B05A22-01EN Nov. 14, 2019-00
Subject to change without notice.