Design Calculation of Bridge Form

This document provides the design calculation for a temporary working platform to be used for piling works during the construction of a bridge over the Bakkhali River in Cox's Bazar, Bangladesh. It outlines the scope of works, assumptions, codes and standards, analysis software, and calculations for loads including dead load, live load, wind load, seismic load, and current load on the steel pipe piles. The design calculations then provide details for sizing and designing the key structural elements of the platform including the transom beams, BT girder truss, girder beams on top of pipes, and steel pipe posts.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
296 views

Design Calculation of Bridge Form

This document provides the design calculation for a temporary working platform to be used for piling works during the construction of a bridge over the Bakkhali River in Cox's Bazar, Bangladesh. It outlines the scope of works, assumptions, codes and standards, analysis software, and calculations for loads including dead load, live load, wind load, seismic load, and current load on the steel pipe piles. The design calculations then provide details for sizing and designing the key structural elements of the platform including the transom beams, BT girder truss, girder beams on top of pipes, and steel pipe posts.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 36

DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR

EXECUTION OF PILING WORKS IN BAKKHALI RIVER FOR THE


CONSTRUCTION OF BRIDGE

Prepared By

Khandaker Khairul Alam PEng


Managing Director
Soil and Structure
FIEB - 13266
DMINB/CE - 0364
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Contents
1. INTRODUCTION: .............................................................................................................................. 3
2. SCOPE OF WORKS: .......................................................................................................................... 3
3. ASSAMPTION:.................................................................................................................................. 3
4. CODES, STANDARD AND REFERENCES: ........................................................................................... 3
5. ANALYSIS SOFWARE: ....................................................................................................................... 4
6. LOAD CALCULTION: ......................................................................................................................... 4
Dead Load ........................................................................................................................................... 4
Live LOAD: ........................................................................................................................................... 4
WIND LOAD: ........................................................................................................................................ 4
SEISMIC LOAD ..................................................................................................................................... 5
CURRENT LOAD: .................................................................................................................................. 6
7. DESIGN CALCULATION .................................................................................................................... 7
7.1. Design of Transom: ................................................................................................................. 7
A. End Girder Section: ................................................................................................................. 7
B. Mid Girder Section: ............................................................................................................... 13
7.2 Design of BT Girder Truss:..................................................................................................... 19
A. End Section ........................................................................................................................... 20
B. Mid-Section ........................................................................................................................... 21
7.3 Design of Girder Beam On Top of Pipe: ................................................................................ 22
7.4 Design of Steel Pipe Post: ..................................................................................................... 27
A. LOAD CALCULATION:............................................................................................................. 28
B. CALCULATION OF SPRING CONSTANT: ................................................................................. 29
C. STRUCTURAL 2D MODEL: ...................................................................................................... 30
D. SAFE LOAD BEARING CAPACITY OF THE PILE: ....................................................................... 35
8. CONCLUSION:................................................................................................................................ 36

Soil & Structure MAHL LGED


Page 2 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

1. INTRODUCTION:
The bridge over the Backkhali river consists of 595.0 m PC box girder at Kusturi Ghat under
upazila sadar, District Cox’s Bazar. The bridge will be constructed under supervision of Local
Government Engineering Department.

2. SCOPE OF WORKS:
The scope of the works is limited to design a temporary bailey bridge in the river on which
construction of cast in-situ box girder will be done.

3. ASSAMPTION:
Cast in-situ box girder shall be concreted in different sequences. So some concrete will be
matured in that time and load transfer methodology will be different. The sequences are
a. Bottom slab casting will be done first. In these stage the load of the green concrete and form
work shall be transferred to transom and BT truss.
b. Web of the box girder will be concreted in this stage. Load of the slab and green concrete
shall be transferred to the transom and BT trestle.
c. Top slab will be concreted in this stage. The web and the bottom slab will be partially
matured in this time. So the load the top slab partially carried by the composite of the first
and 2nd stages and partially will be carried by the BT truss from overhang part.

4. CODES, STANDARD AND REFERENCES:


Following codes and standard has been adopted to design the member of the platform
- BNBC – 2014 (Bangladesh National Building Code)
- ACI – 318
- AISC 360-16 (American Institute of Steel Construction)
- Foundation analysis and design by Joseph E. Bowles
- Pile Foundation design by Tom Linson
- Contract drawings from the client

Soil & Structure MAHL LGED


Page 3 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

5. ANALYSIS SOFWARE:
STAAD Pro 2006 SS6 has been used to analysis the beam, frame and the structures.

6. LOAD CALCULTION:
Dead Load

Dead loads are all the self-weight of the structural plate beams, girder, vertical steel pipes,
bracing angles.

Live LOAD:

- Weight of cast in-situ box girder.


- 2.5 kN/m2 load for formworks systems.
- Assume 2.5 kN/m2 live load will be working during construction period.

WIND LOAD:

Wind Load has been calculated according to BNBC -2014, Part-6, Chapter-2.

Location Cox’s Bazar


Basic wind speed = 80m/s
qz = 0.000613KzKztKdV2I
Kz = Velocity pressure coefficient = 1.05 for exposure Type B and height = 15m
Kzt = topographic factor = 1 for flat surface
Kd = wind directional factor = 0.85 for main wind frame structure
I = importance factor = 0.77

qz = 0.000613*1.09*1*0.85*0.77*(80)2 = 2.18 kN/m2


Cp = (0.8+0.5) = 1.3
G = 0.85
So wind pressure, qz = qzGCp = 2.18*0.85*1.3 = 2.80 kN/m2

Approximate Projected area = (3.5+1)*65 = 292.5 m2


Wind load = 292.5*2.8 = 827.5 kN

Soil & Structure MAHL LGED


Page 4 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

SEISMIC LOAD

Seismic load has been calculated according to BNBC -2014.

Seismic zone coefficient, Z = 0.28


The spectral acceleration for the design earthquake is given by the following equation:
2 𝑍𝐼
𝑆𝑎 = 𝐶
3𝑅 𝑆
Sa = Design spectral acceleration (in units of g), which shall not be less than 2/3*ZI*β
Z= Seismic zone coefficient = 0.28
I = Structural importance factor = 1.0
R = Response reduction factor = 6.0

So, Sa = (2/3)*(0.28*1/6)*Cs = 0.0311*Cs


Cs = typical shape of elastic response coefficient.
Period, T = Ct*(hn)m
For steel moment resisting frame
Ct = 0.0724, m = 0.8
Say height of structure (mid height of bridge), hn = 17.8 m above ground level.
T = 0.0724*(17.8)^0.8 = 0.72
For Soil Type = SC, S = 1.15, TB = 0.2; TC = 0.6; TD = 2.0 (Table – 2.5.4)
So TC < T < TD
Cs = 2.5*S*ƞ*(Tc/T)
Ƞ = damping correction factor = 1.0 for 5% damping.
So, Cs = 2.5*1.15*1*(0.6/0.72) = 2.40
Therefore, Sa = 0.0311*Cs = 0.0311*2.40 = 0.075
Base shear force shall be calculated according to following formula-
V = SaW = 0.075W
W = seismic weight of the structure
= Dead weight of platform+ Weight of Bridge
= 3.5*15*65+335*10.5*2+255*3*12 kN
= 18547 kN
So, base shear, V = 0.075*18547 = 1391 kN

Soil & Structure MAHL LGED


Page 5 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

CURRENT LOAD:

Velocity of water in river, v = 3.0m/s


So the pressure head, h = v2/(2g) = 0.46 m
Pressure on the steel pipe = hg = 0.46*1000*9.81 N/m2 = 4.51 kN/m2
So the load on steel pipe = 0.5*4.51 kN/m2 = 2.26 kN/m

Soil & Structure MAHL LGED


Page 6 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

7. DESIGN CALCULATION

7.1. Design of Transom:

3 4 5 6

750

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

BT-1

12000 12000 10500

12000 12000 10500

A. End Girder Section:

Case-01 : Concreting Bottom Slab

Spacing of the transom = 0.75 m

Self-weight of the transom = 2.8 kN/m

Weight of the checker plate = 0.75*0.01*78.5 = 0.59 kN/m

Weight of the bottom slab of box girder= 0.6*24*0.75 = 10.8 kN/m

Weight of the formworks above = 2.5*0.75 = 1.88 kN/m2

Working live load = 0.75*2.5 = 1.88 kN/m2

Soil & Structure MAHL LGED


Page 7 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

350

350
500

500

450
504

504
350

350
2

600 586
589

259
6

600

600
Fig: Section of Box Girder at End

Case-02: Concreting Web of Box Girder

In case-02 the concrete of bottom slab will be hardened which will carry the load of the green
concrete of the web. So green concrete load may be considered as a uniform load over slab.

So in these case total acting load = load of case -01 + green concrete load of case-02

Green concrete weight = 3*0.75*1.72*24 = 92.88 kN

Additional 25% for vibration = = 23.22 kN

Add 1 kN/m2 formworks = 0.75*1*3.5*2*3 = 15.75 kN

Total = 92.88+23.22+15.75 = 131.185 kN

This load will be distributed in 5.5m

So uniformly distributed load on transom = 131.185/5.5 = 23.98 kN/m

Case-03: Concreting Top Slab of Box Girder

In case-03, the concrete of web will be hardened. So web and bottom slab will act as a
composite rigid section which will carry the self-weight and the weight of the top slab.
1880
1120

Fig: Section Of Box Girder At End After Web Casting. Section Properties Of The Section
Has Been Calculated In AutoCAD As Given Below.

Soil & Structure MAHL LGED


Page 8 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Section properties of The Section After Casting Web. Extracted from AutoCAD

Moment of inertia, Ixx = 6606714716160 mm4

Section modulus, Zxx = Ixx/Ymax = 6606714716160 /1880 = 3.51x109 mm3

Yield strength of the concrete, f’c = 25 MPa

So cracked strength, fcr = 0.667√f’c = 3.34 Mpa

Cracked moment capacity of the section, Mcr = fcr Zxx = 11737.46 kNm

√𝑓𝑐′
Allowable strength in concrete, 𝑣𝑐 = 6
=0.83 MPa

So section shear capacity = 3000*600*3*0.83 = 4482 kN

Fig: Section of Box Girder at End

Soil & Structure MAHL LGED


Page 9 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Area of the section = 13672824 mm2

= 13.67 m2

Weight of the section = 13.67*24 = 328.08 kN/m

25% additional for construction load, vibration, etc = 82.02 kN/m

Weight of the section including top slab, W = 410.1 kN/m

For the 10.5 m span, Maximum moment, Ma = WL2/8 = 5651 kNm

Which is less than cracked moment, Mcr (11737.46 kNm).

Maximum shear force, Va = WL/2 = 2153 kN

Which is less than Vc (4482 kN)

So whole weight of the box girder can easily take the constructed part in case -2.

Finally, we can conclude that though there will be additional load of the top slab, Transom and
BT truss will be reluctant of those additional load carrying.

So Transom and BT Truss will be designed for the load of case-1 and case-2.

Fig: Transom Model from StaadPro

Soil & Structure MAHL LGED


Page 10 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Applied Load on Transom from StaadPro

Fig: Shear Force Diagram. Maximum Shear Force = 16.317 kN

Fig: Bending Moment Diagram. Maximum Bending Moment = 2.88 kNm

Soil & Structure MAHL LGED


Page 11 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Support Reaction. Maximum Reaction = 32.182 kN

Use I25B or equivalent section

Area of the section = 53.50 cm2

Depth of the section, D = 250.00 mm

Width of the flange, bf = 118.00 mm

Thickness of the flange, tf = 13.00 mm

Thickness of the web, tw = 10.00 mm

Moment of Inertia, I = 5278.00 cm4

Section Modulus, Z = 5278*10000/125 mm

= 422240 mm3

Yield strength of the beam, fy = 350 MPa

So moment capactity, Mc = 0.66 fyZ

= 0.66 * 350 * 422240

= 97537440 N-mm

= 97.54 kNm > 2.88 kNm (Safe)

Shear Capacity, Vc = 0.4dtwfy = 0.4*250*10*248 = 248 kN > 16.317 kN (Safe)

Soil & Structure MAHL LGED


Page 12 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

B. Mid Girder Section:

Case-01 : Concreting Bottom Slab

Spacing of the transom = 0.75 m

Self-weight of the transom = 2.8 kN/m

Weight of the checker plate = 0.75*0.01*78.5 = 0.59 kN/m

Weight of the bottom slab of box girder= 0.35*24*0.75 = 6.3 kN/m

Weight of the formworks above = 2.5*0.75 = 1.88 kN/m2

Working live load = 0.75*2.5


350 = 1.88 kN/m2

350
350

350
500

500
450

450
338
350
287

2650
2

339
1 1 1
350

2 DUMY 2 2
3 3 3
4 4 4
5 6 7 8 9 9 7 5 6 8 9 8 7 6 5

5500

Fig: Section of the Girder at Middle part.

Case-02: Concreting Web of Box Girder

In case-02 the concrete of bottom slab will be hardened which will carry the load of the green
concrete of the web. So green concrete load may be considered as a uniform load over slab.

So in these case total acting load = load of case -01 + green concrete load of case-02

Fig: Web of Grider at Left and Right Side which is maximum.

Soil & Structure MAHL LGED


Page 13 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Green concrete weight = 3*0.75*1.042*24 = 56.27 kN

Additional 25% for vibration = = 14.07 kN

Add 1 kN/m2 formworks = 1*0.75*3.5*2*3 = 15.75 kN

Total = 56.27+14.07+15.75 = 86.09 kN

This load will be distributed in 5.5m

So uniformly distributed load on transom = 86.09/5.5 = 15.65 kN/m

Case-03: Concreting Top Slab of Box Girder

In case-03, the concrete of web will be hardened. So web and bottom slab will act as a
composite rigid section which will carry the self-weight and the weight of the top slab.

1969
1027

Fig: Box girder Section After Casting Web. Section properties has been calculated in AutoCAD
as given Below.

Fig: Section properties of The Section After Casting Web. Extracted from AutoCAD

Moment of inertia, Ixx = 4430751212877 mm4

Section modulus, Zxx = Ixx/Ymax = 4430751212877 /1969 = 2.25x109 mm3

Soil & Structure MAHL LGED


Page 14 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Yield strength of the concrete, f’c = 25 MPa

So cracked strength, fcr = 0.667√f’c = 3.34 Mpa

Cracked moment capacity of the section, Mcr = fcr Zxx = 7515 kNm

√𝑓𝑐′
Allowable strength in concrete, 𝑣𝑐 = 6
=0.83 MPa

So section shear capacity = 3000*339*3*0.83 = 2532 kN

350

350
350

350
500

500
450

450
338
350
287

2650
2

339
1 1 1
350

2 DUMY 2 2
3 3 3
4 4 4
5 6 7 8 9 9 7 5 6 8 9 8 7 6 5

5500

Fig: Section of the Girder at Middle part.

Area of the section = 10189723 mm2

= 10.2 m2

Weight of the section = 10.2*24 = 244.8 kN/m

25% additional for construction load, vibration, etc = 61.2 kN/m

Weight of the section including top slab, W = 244.8+61.2 = 306 kN/m

For the 12.0 m span, Maximum moment, Ma = WL2/8 = 5508 kNm

Which is less than cracked moment, Mcr (7515 kNm).

Maximum shear force, Va = WL/2 = 1836 kN

Which is less than Vc (2532 kN)

So whole weight of the box girder can easily take the constructed part in case -2.

Finally, we can conclude that though there will be additional load of the top slab, Transom and
BT truss will be reluctant of those additional load carrying.

So Transom and BT Truss will be designed for the load of case-1 and case-2.

Soil & Structure MAHL LGED


Page 15 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Finite Element Model of Transom Model from StaadPRO

Fig: Applied Load in Transom

Soil & Structure MAHL LGED


Page 16 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Shear Force Diagram. Maximum Shear Force, V = 11.06 kN

Fig: Bending Moment Diagram. Maximum Bending Moment, M = 2.88 kNm

Soil & Structure MAHL LGED


Page 17 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Support Reaction. Maximum Reaction = 21.782 kN

Use I25B or equivalent section

Area of the section = 53.50 cm2

Depth of the section, D = 250.00 mm

Width of the flange, bf = 118.00 mm

Thickness of the flange, tf = 13.00 mm

Thickness of the web, tw = 10.00 mm

Moment of Inertia, I = 5278.00 cm4

Section Modulus, Z = 5278*10000/125 mm

= 422240 mm3

Yield strength of the beam, fy = 350 MPa

So moment capactity, Mc = 0.66 fyZ

= 0.66 * 350 * 422240

= 97537440 N-mm

= 97.54 kNm > 21.782 kNm (Safe)

Shear Capacity, Vc = 0.4dtwfy = 0.4*250*10*248 = 248 kN > 11.06 kN (Safe)

Soil & Structure MAHL LGED


Page 18 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

7.2 Design of BT Girder Truss:

1 2 3 4 5 6
400

BT-1

D
400

BT-1
2400
4000

BT-1
800 400400 800

BT-1

C BT-1

BT-1
800

BT-1
4000

800

BT-1
800 400 400 800

BT-1

B BT-1

BT-1
4000

2400

BT-1
400

A BT-1
400

10500 12000 12000 12000 10500

BT TRUSS LAYOUT PLAN

+14.265
1500

BR-01 BR-01 BR-01 BR-01 BR-01


BR BR BR BR BR BR BR BR
-02 -02 -02 -02 -02 -02 -02 -02 BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
-02 -02 -02 -02 -02 -02 -02 -02
BR BR BR BR -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 BR BR BR BR
BR-03

BR-03

BR-03

BR-03

BR-03
BR-03

BR BR BR BR BR BR BR BR BR BR BR BR BR BR BR
2000

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03
BR-01 BR-01 BR-01 BR-01 BR-01

10500 12000 12000 12000 10500


3500

C-101

C-101

C-101

C-101

C-101

C-101
BR-01 BR-01 BR-01 BR-01 BR-01
BR BR BR BR BR BR BR BR
HWL ±4.193m (DRY)
-02 -02 -02 -02 -02 -02 -02 -02 BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
BR
-02
-02 -02 -02 -02 -02 -02 -02 -02
BR BR BR BR -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 -02 BR BR BR BR
BR-03

BR-03

BR-03

BR-03

BR-03
BR-03

BR BR BR BR BR BR BR BR BR BR BR BR BR BR BR
2000

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03

BR-03
867

HWL ±3.326m (DRY)

BR-01 BR-01 BR-01 BR-01 BR-01


2826

LWL = +0.50m
500

±0.00m
1895

EGL = -1.895

Soil & Structure MAHL LGED


Page 19 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

A. End Section

Fig: Reaction at Transom. Maximum Reaction from transom = 32.182 kN

= 32.182 / 0.75 (spacing of transom)

= 42.91 kN/m

Weight of BT panel = 2.65 kN for 3.0m long panel

= 0.88 kN/m

Total load W = 42.91+0.88 kN = 43.75 kN/m

Spacing between vertical pipe support for end section, L = 10.5 m

So, Moment, Mactual = WL2/8 = 602 kNm

Capacity of the BT panel, Mc = 788.2 kNm > Mactual

So it is safe.

Maximum Shear, Vactual = WL/2 = 229.68 kN

Shear Capacity of the BT Panel, Vc = 245.2 kN > Vactual

So the panel is safe.

Soil & Structure MAHL LGED


Page 20 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

B. Mid-Section

Fig: Reaction at Transom. Maximum Reaction from transom = 21.782 kN

= 21.782 / 0.75 (spacing of transom)

= 29.04 kN/m

Weight of BT panel = 2.65 kN for 3.0m long panel

= 0.88 kN/m

Total load W = 29.04+0.88 kN = 29.92 kN/m

Spacing between vertical pipe support for end section, L = 12 m

So, Moment, Mactual = WL2/8 = 538 kNm

Capacity of the BT panel, Mc = 788.2 kNm > Mactual

So it is safe.

Maximum Shear, Vactual = WL/2 = 179.52 kN

Shear Capacity of the BT Panel, Vc = 245.2 kN > Vactual

So the panel is safe.

Soil & Structure MAHL LGED


Page 21 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

7.3 Design of Girder Beam On Top of Pipe:

1 2 3 4 5 6

00
01
02
D
4000

C
2-ISMB400

2-ISMB400

2-ISMB400

2-ISMB400

2-ISMB400

2-ISMB400
4000

B
4000

10500 12000 12000 12000 10500

GIRDER LAYOUT PLAN

Fig: Reaction of Transom Which Will act as Load for Girder for End Section

Fig: Reaction of Transom Which Will act as Load for Girder for Middle Part.

Soil & Structure MAHL LGED


Page 22 of 36
LOAD FROM BRLOADSelf Weight
FROM BR of BTSelf Weight of BT END SECTION ENDMID SECTION MID SECTION
SECTION
=(w1L1+w2L2)/2=(w1L1+w2L2)/2
=w(L1+L2)/2 =w(L1+L2)/2 = R/0.75 = R/0.75
= R/0.75 = R/0.75 END SECTION MID SECTION

Soil & Structure


141.59 kN 141.59 kN 131.66 kN 131.66 kN
9.93kN 9.93 kN 11.74 kN/m 11.67
11.74
kN/m
kN/m 11.67 kN/m 8.808 kN 8.754 kN

800
800
800
800
800
800
95.55 kN 95.55 kN 85.62 kN 85.62
9.93kNkN 9.93 kN 7.52 kN/m 7.69
7.52
kN/m
kN/m 7.69 kN/m 5.639 kN 5.768 kN

2400
2400
2400
2400
Fig:800Load /2400
2400
2400

4000
4000
4000
4000
4000
4000
4000

260.04 kN 260.04 kN 250.47 kN 250.47 kN


9.93kN 9.93 kN 24.28 kN/m 20.50
24.28
kN/m
kN/m 20.50 kN/m 18.212 kN 15.379 kN

800
800
800
800
800
800

326.78 kN 326.78 kN 316.85 kN 316.85 kN


9.93kN 9.93 kN 34.82 kN/m 22.34
34.82
kN/m
kN/m 22.34 kN/m 26.122 kN 17.209 kN
800

800
800
800
800
800
409.58 kN 409.58 kN 399.65 kN 399.65 kN
9.93kN 9.93 kN 42.90 kN/m 29.04
42.90
kN/m
kN/m 29.04 kN/m 32.182 kN 21.782 kN
800

800
800
800
800
800 800
800
401.48 kN 401.48 kN 391.55 kN 391.55 kN
9.93kN 9.93 kN 42.09 kN/m 28.43
42.09
kN/m
kN/m 28.43 kN/m 31.579 kN 21.328 kN

Meter =800 Reaction


402.38 kN 402.38 kN 392.45 kN 392.45 kN
9.93kN 9.93 kN 42.180
42.180 kN/m 28.50 kN/m
kN/m 28.50 kN/m 31.643 kN 21.377 kN
1600
4000

1600
1600
1600
1600
/ 1600
1600

4000
4000
4000
4000
4000
4000
401.48 kN 401.48 kN 391.55 kN 391.55 kN
9.93kN 9.93 kN 42.09 kN/m 28.43
42.09
kN/m
kN/m 28.43 kN/m 31.579 kN 21.328 kN
800

800
800
800
800
800
409.58 kN 409.58 kN 399.65 kN 399.65 kN
9.93kN 9.93 kN 42.90 kN/m 29.04
42.90
kN/m
kN/m 29.04 kN/m 32.182 kN 21.782 kN

MAHL
800

800
800
800
800
800
326.78 kN 326.78 kN 316.85 kN 316.85 kN
9.93kN 9.93 kN 34.82 kN/m 22.34
34.82
kN/m
kN/m 22.34 kN/m 26.122 kN 17.209 kN
Fig: Reaction From Transom above BT Truss
800

800
800
800
800
800
800

Fig: Load from BT truss including Self-Weight


18.212 kN 15.379 kN
260.04 kN 260.04 kN 250.47 kN 250.47 kN
9.93kN 9.93 kN 24.28 kN/m 20.50
24.28
kN/m
kN/m 20.50 kN/m

0.75m800as800transom
4000

4000
4000
4000
4000
4000
4000
2400

2400
2400
2400
2400
2400
2400
5.639 kN 5.768 kN

spacing
95.55 kN 95.55 kN 85.62 kN 85.62
9.93kNkN 9.93 kN 7.52 kN/m 7.69
7.52
kN/m
kN/m 7.69 kN/m
800

800
800
800
800
141.59 kN 141.59 kN 131.66 kN 131.66 kN
9.93kN 9.93 kN 800
11.74 kN/m 11.67 kN/m
11.74 kN/m 11.67 kN/m
8.808 kN 8.754 kN

=8000.75m
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

LGED
Page 23 of 36
4000 4000
4000
800 2400 800 800 800 1600 800 800 800 2400 800

DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

260.04 kN

409.58 kN

401.48 kN

402.38 kN

401.48 kN

409.58 kN

260.04 kN
326.78 kN

326.78 kN
141.59 kN

141.59 kN
95.55 kN

95.55 kN
4000 4000
4000
800 2400 800 800 800 1600 800 800 800 2400 800

Fig: Final Load on The BT Truss.

Fig: Load on The Girder Extracted from StaadPro.

Fig: Shear Force Diagram. Vmax = 1015 kN

Soil & Structure MAHL LGED


Page 24 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Fig: Bendimg Moment Diagram. Mmax = 527 kNm

Fig: Support Reaction. Rmax = 1620 kN

USE ISMB400 Steel Beam

Steel area, A = 78.5 cm2

Depth of the beam, D = 400.00mm

width of the flange, Bf = 140.00 mm

Thickness of the flange, tf = 16.00 mm

Thickness of the web, tw = 8.9 mm

Moment of Inertia of the beam, I = 20456.00 cm4

Section Modulus, Z = 1176 cm3

Shear area Ay = 400*8.90 mm2

= 3560 mm2

Shear capacity, V= 0.4 Ay * fy = 0.4*3560*248 N

Soil & Structure MAHL LGED


Page 25 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

= 353 kN

Moment Capacity, Mc = 0.66 fy Z = 0.66*248*1176*1000 Nmm

= 192.50 kN-m

Number of beam required from shear capacity = 1015/253 ≈ 3.0 no

Number of beam required from Moment capacity = 527/192 ≈ 3.0 Nos

So use 3.0 nos beam at the top of column as girder.

Soil & Structure MAHL LGED


Page 26 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

7.4 Design of Steel Pipe Post:

12500

350

350
1 1

500
1

2 2
2

2124
3 3
3

600 600

260
4 4

3500
4

3150
0
5 5
5

6 6
6

+14.265
7 7
8 9 9 7 8 9 8
5500

1100 800 800 1100

800 2400 800 800 800 1600 800 800 800 2400 800
1500

BR-01 BR-01 BR-01

BR BR BR
-02 -02 -02 -02 -02 -02
BR BR BR
2000

BR-01 BR-01 BR-01


14265

C-101

C-101

C-101

C-101
3500

BR-01 BR-01 BR-01

BR BR BR
-02 -02 -02 -02 -02 -02
HWL ±4.193m (DRY) BR BR BR
2000

HWL ±3.326m (DRY)

BR-01 BR-01 BR-01

LWL = +0.50m
5150

±0.00m

EGL = -1.895
15000

4000

4000 4000

SECTION ALONG 1 TO 2 AND 5 TO 6

Soil & Structure MAHL LGED


Page 27 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

A. LOAD CALCULATION:

Fig: load from BT truss to Girder

Load from BT truss to girder = 1620 kN at inner Pipe

Load from BT truss to girder = 226 kN at outer Pipe

Lateral Load from Seismic Load = 1391 kN

This load will be distributed on 24 nos of pipe

So lateral load on each pipe = 1291/24 = 58 kN

A 2D computer model has been developed in StaadPro with following member size-

a. Vertical MS pipe = 600mm dia with wall thickness = 12mm


b. Horizontal member and cross bracing with 2<100x100x8 mm MS angle

Following loads are applied on the structure-

a. Self-weight of the structure.


b. Load from the girder
c. Lateral load

Soil is modeled by spring constant with the value of modulus of lateral subgrade reaction.
Values are taken from the books “Foundation Analysis and Design 5th Edition by Joseph E.
Bowles” by interpolating the values-

Soil & Structure MAHL LGED


Page 28 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

B. CALCULATION OF SPRING CONSTANT:

Values of Lateral subgrade reaction

Reference: Foundation Analysis and Design (Joshep E. Bowles_5ed)

PILE CAPACITY FOR Diameter, D = 600mm


DEPTH LAYER SPT Soil Ksh Spring
(m) THICKNESS (N) Type (kN/m3) Constant
(m) (kN/m)

3 3 0 C 0 0

4.5 1.5 3 C 2000 1800

6 1.5 8 C 40000 36000

7.5 1.5 18 C 92000 82800

9 1.5 21 C 124000 111600

10.5 1.5 34 C 220000 198000

12 1.5 50 S 280000 252000

13.5 1.5 50 S 280000 252000

15 1.5 50 S 280000 252000

16.5 1.5 50 S 280000 252000

18 1.5 50 S 280000 252000

19.5 1.5 50 S 280000 252000

21 1.5 50 S 280000 252000

22.5 1.5 50 S 280000 252000

24 1.5 50 S 280000 252000

25.5 1.5 50 S 280000 252000

27 1.5 50 S 280000 252000

28.5 1.5 50 S 280000 252000

30 1.5 50 S 280000 252000

31.5 1.5 50 S 280000 252000

33 1.5 50 S 280000 252000

35 2 50 S 280000 336000

Soil & Structure MAHL LGED


Page 29 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

C. STRUCTURAL 2D MODEL:

Diagram: The structure

Diagram: Geometry of the structure

Soil & Structure MAHL LGED


Page 30 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Diagram: Member Properties

Diagram: Load from the Girder

Soil & Structure MAHL LGED


Page 31 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Diagram: Lateral Load (450 = 22.5 kN)

Soil & Structure MAHL LGED


Page 32 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

ANALYSIS OUTPUT AND DESIGN RESULT:

Diagram: Bending Moment

Diagram: Shear Forces

Soil & Structure MAHL LGED


Page 33 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

Diagram: Reaction for DL+LL

Diagram: Utilization of the member

All member passed

Soil & Structure MAHL LGED


Page 34 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

D. SAFE LOAD BEARING CAPACITY OF THE PILE:


Geotechnical capacity of steel pipe is given below in chart-

PILE CAPACITY FOR D= 600 mm


DEPTH LAYER CORRECT Soil Ks PHI Nq-1 ALPHA Cd As Pd SKIN CUM. SKIN END SAFE
(m) THICKNESS ED. Type (deg) (kN/m2) (m2) (kN/m2) FRICTION FRICTION BEARING CAPACITY
(ft) SPT Qsul (kN) Qsu (kN) Qbu (kN) Qa (kN)
(N)
3 3 0 C 0 0 0.5 0 5.655 14.18 0.00 0.00 0.00 0.00
4.5 1.5 3 C 0 0 0 0.5 21 2.827 35.44 29.69 29.69 53.44 33.25
6 1.5 8 C 0 0 0 0.5 56 2.827 49.61 79.17 108.86 142.50 100.54
4.5 -1.5 18 C 0 0 0 0.5 126 -2.827 49.61 0.00 108.86 320.63 171.80
6 1.5 21 C 0 0 0 0.5 147 2.827 49.61 207.82 316.67 374.07 276.30
7.5 1.5 34 C 0 0 0 0.5 238 2.827 63.79 336.47 653.14 605.64 503.51
9 1.5 50 C 0 0 0 0.5 350 2.827 77.96 494.80 811.48 890.64 680.85
10.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 794.07 3727.34 1808.57
12 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 935.00 3727.34 1864.94
13.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1075.93 3727.34 1921.31
15 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1216.86 3727.34 1977.68
16.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1357.80 3727.34 2034.06
18 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1357.80 3727.34 2034.06
19.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1498.73 3727.34 2090.43
21 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1639.66 3727.34 2146.80
22.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1780.59 3727.34 2203.17
24 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1780.59 3727.34 2203.17
25.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1921.52 3727.34 2259.55
27 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 1921.52 3727.34 2259.55
28.5 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 2062.45 3727.34 2315.92
30 1.5 50 S 1 40.5 155 0 0 2.827 85.05 140.93 794.07 3727.34 1808.57

Capacity has been calculated from the book of “Pile foundation design 5th edition by
Tomlinson”.

From the above chart 15.0m embedment of the pipe in the soil will give the necessary
capacity.

Maximum reaction = 1320 kN

Load bearing capacity of 600mm dia pipe = 1977 kN for 15.0m Depth

Soil & Structure MAHL LGED


Page 35 of 36
DESIGN CALCULATION OF TEMPORARY WORKING PLATFORM FOR EXECUTION OF PILING WORKS

8. CONCLUSION:
Component of temporary BT Bridge like transom, BT Panel, girder, bracing angle and steel
pipe capacity have been checked against all possible loads imposed on the structures and all
members are safe enough to carry that loads without failure. So the temporary BT Bridge is
safe for the construction of cast in-situ box girder.