NPT Atp Document r3
NPT Atp Document r3
_________________________________________________________________________________________
ECI–NPT-1200/1020/1050/1010
Station/Location: - ____________________________________________________
NE ID: - ____________________________________________________
NOTE: All readings to be recorded against each test in the document. Wherever it is NOT
APPLICABLE please mention N/A.
PAGE 1 OF 18
VODAFONE NPT Acceptance Testing Document.
_________________________________________________________________________________________
1 Commissioning Tests
Overview
This chapter describes general commissioning procedures for the NPT-1200/1050/1020 and
provides a basis for preparing tests in specific networks.
Test Equipment
The following test equipment is required for the commissioning procedures:
FC-to-LC adapters
Multimeter.
Suitable equipment is available from a wide range of manufacturers and therefore no specific
models are listed. You can use any equipment that meets applicable international standards and
has satisfactory measurement accuracy over the range of operating parameters and
environmental conditions that apply to the specific network. If necessary, contact ECI’s Field
Engineering Department for specific recommendations.
PAGE 2 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
1.2.5 All the power cables properly routed & terminated Yes No
with suitable lugs
1.2.6 All patch cords routed and terminated properly at Yes No
relevant ODF
1.2.7 All patch cords & CAT5/6 routed through PVC Yes No
channel
1.2.8 All patch cords/CAT5-6 cables are properly labeled Yes No
with printed stickers
1.2.8 Storage of patch cords properly done Yes No
Remarks:-
PAGE 3 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
2. Inventory Details:
2.1 Checking Cards and Modules Installed in Each Shelf
This check is performed to confirm that the required cards and modules have been installed in each
site, and to record their options, revisions, boot version, and serial numbers.
The following table provides a typical form for recording the cards and modules installed in a NPT
shelf.
Embedded
Card/Module type Slot Boot version Serial number
Version.
PAGE 4 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
At
AT XRAP/DCDB==NPT1200
xRAP/DCDB==NPT1010/1020/1050
MCB
Measured Voltage MCB Rating Measured Voltage
Rating
Power
10A
Supply A 32A/50A
Power 10A
32A/50A
Supply B
3.2 Specifications
PAGE 5 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
Perform these measurements using an OPM configured according to the wavelength at the
measurement port. For reliable measurement, do not connect the OPM directly to a port but use
a two-meter fiber. When measuring high optical power levels, use attenuators to ensure that the
power does not exceed the maximum OPM input level.
PAGE 6 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
Slot
Port SFP Wave Tx. Tx. Patch Error
numb Typ Length Power Power Receiver Rx ALS Cord Free
er e (dBm) (dBm) Sensitivity ( Check BER for
dBm)
Example By of for 3
LCT Module Insertion minutes
LR by Loss ( (OK/
Power OK / NOT
Meter NOT OK) OK )
PAGE 7 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
5. Maintenance Functions
5.1 Alarm Indications on Data Cards: for one port of each slot.
Link Fail.
5.1.1 (Electrical
port)
5.1.2 LOS (SFP)
Type
5.1.3
mismatch
□ OK □ Not OK
Acknowledge all the alarms and verify cleared alarms disappear from the Current Alarm Window,
all the active alarm are acknowledge but still on the Current Alarm Window
□ OK □ Not OK
PAGE 8 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
6. Equipment Protection:
UNIT Force Manual JOJI Reset Button
Switch Switch
CPTS/CPS Switching OK □ OK □
A>B (Force Switch) Not OK□ Not OK □
CPTS/CPS Switching OK □
A->B (Manual Switch) Not OK□
CPTS/CPS Switching OK □
A->B (JOJI CPTS/CPS A) Not OK □
CPTS/CPS Switching OK □ OK □
B->A(Force Switch) Not OK□ Not OK □
CPTS/CPS Switching OK □
B->A (Manual Switch) Not OK□
CPTS/CPS Switching OK □
B->A (JOJI CPTS/CPS B) Not OK □
During CPTS/CPS switching as above check the manageability after switching completion
Result:
Manageability: □ YES □ NO
7. E1 Testing:
Take a Terminal Loop on the port and test the E1 on E1 BER meter.
E1 Tested (OK / E1 Tested (OK / E1 Tested (OK /
NOT OK) NOT OK) NOT OK)
1 22 43
2 23 44
3 24 45
4 25 46
5 26 47
6 27 48
7 28 49
8 29 50
9 30 51
10 31 52
11 32 53
12 33 54
13 34 55
14 35 56
15 36 57
16 37 58
17 38 59
18 39 60
PAGE 9 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
19 40 61
20 41 62
21 42 63
PAGE 10 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
PAGE 11 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
PAGE 12 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
PAGE 13 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
PAGE 14 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
PAGE 15 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
PAGE 16 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
XX_YYYY_SSSSS_TTT_Z_N_VMMMJJJ
XX - State
YYYY - City / Town
SSSSS - City Location
TTT - Site Type
Z - Node Type
N - Subrack Location/BG MEDIA
V - Vendor
MMM - Model Name
JJJ - Node No
PAGE 17 OF 18
VODAFONE NPT Acceptance Testing Document.
__________________________________________________________________________________________
Verified
Verified by ECI Remark
Sl.No. Verifications Points by NOC
NE NMS Name as per plan
NE ID as per plan
No Duplicate NE ID
Site Name in system
NE
location/sitename
NE Time
NE Version
NE Consistancy in EMS
__________________________________________________________________________________________
No alarms present
Masking/Non reporting of
Alarms
alarms on the connected port as
per the profile.
PAGE 19 OF 18