Chapter 15 PPE (Part 1)
Learning Objectives
Elements of Cost
1. Purchase price, including non-refundable purchase
taxes, after deducting trade discounts and rebates.
2. Costs directly attributable to bringing the asset to the
location and condition necessary for it to be capable of
operating in the manner intended by the management.
3. Present value of decommissioning and restoration
costs to the extent that they are recognized as obligation
Cessation of capitalizing costs to PPE
• Recognition of costs in the carrying amount of an item of
PPE ceases when the item is in the location and
condition necessary for it to be capable of operating in
the manner intended by management.
Measurement of Cost
Example:
Case: An old structure is demolished to make way for the construction of a new
building.
Any proceeds from sale of salvaged materials from the demolition are
deducted from the demolition cost that is capitalized to the new
building.
Acquisition through exchange
a. Fair value of asset Given up Plus cash Paid/ minus cash received
c. Carrying amount of asset Given up Plus cash Paid/ minus cash received