Turbine Trip Protection: Description Set Valve SL NO Alarm Valve Time Delay

This document lists 20 turbine trip protection parameters for a power plant, including emergency trips, temperature thresholds, vibration limits, flow rates, and other operating parameters. Trips are initiated if the set value is reached within the alarm delay time. Parameters include steam temperatures, lubricating oil pressure, casing temperatures, vibration levels, flow rates, and water levels. Exceeding the set values of these critical operating parameters could damage equipment, so automatic trips are initiated to shut down the turbine safely.

Uploaded by

Shambhu Mehta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Turbine Trip Protection: Description Set Valve SL NO Alarm Valve Time Delay

This document lists 20 turbine trip protection parameters for a power plant, including emergency trips, temperature thresholds, vibration limits, flow rates, and other operating parameters. Trips are initiated if the set value is reached within the alarm delay time. Parameters include steam temperatures, lubricating oil pressure, casing temperatures, vibration levels, flow rates, and water levels. Exceeding the set values of these critical operating parameters could damage equipment, so automatic trips are initiated to shut down the turbine safely.

Uploaded by

Shambhu Mehta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TURBINE TRIP PROTECTION

SL ALARM TIME
DESCRIPTION SET VALVE
NO VALVE DELAY
1 Emergency Push Button Trip from UCP and OWS.
2 Fire Protection CH-1 and CH-2 and MBLD 1&2.
3 Condenser Presurre high. 2/3 0.4 kg/cm2 0.2 kg/cm2
4 Lube oil pressur very low. 2/3 1.2 kg/cm2
5 HP Exhaust stem tempreature Very high. 2/3 500 C
6 Axial shift very high. 2/3 1 mm(+-) 0.5 mm
7 HP casing top bottom differential temp .very high 2/3 & >120MW 100 C 90 C
8 IP casing front & rear top bottom differential tempreature
very high 2/3 & >120MW 45 C 30 C
9 Cold gas temp. after H2 cooler very high. 2/3 60 C 55 C
10 Hot Air temp. after exciter very high. 2/3 80 C 75 C
11 Liquid level in main leads. Very high. 2/3
12 Primay water temp. After cooler very high. 2/3 60 C 55 C
13 Turbine bearing metal tempreature very high. 130 C 100 C
14 Main steam temp . Very low . 2/3 460 C 500 C
15 Turbine shaft vibration very high. 320 micron 500 ms
16 Over Speed. 3300 rpm
17 Stator water winding outlet flow very low. 2/3 64 m3/hr 72 m3/hr 60s
18 Main bushing RYB flow very low. 2/3 2 m3/hr 2.15 m3/hr 60s
19 Boiler trip to Turbine Trip. 2/3
20 Generator trip to Turbine trip. 2/3
21 MOT level very low . 1050 mm