DPR

The document provides details of a proposed road project from Dondlavagu to Balapanur in Simhadripuram block of YSR Kadapa district in Andhra Pradesh. The total estimated cost of the project is Rs. 468.74 lakhs. The proposed road length is 6.98 km and falls under category C. The project involves flexible pavement, rigid pavement, CD works, protective works and miscellaneous items.

Uploaded by

Rajagopal Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
226 views296 pages

DPR

The document provides details of a proposed road project from Dondlavagu to Balapanur in Simhadripuram block of YSR Kadapa district in Andhra Pradesh. The total estimated cost of the project is Rs. 468.74 lakhs. The proposed road length is 6.98 km and falls under category C. The project involves flexible pavement, rigid pavement, CD works, protective works and miscellaneous items.

Uploaded by

Rajagopal Reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 296

Detailed Project Report

Name of the Work: Providing BT to the road from


Krishnamgaripalli to Ahobilapuram
of Pulivendula (M) in YSR Kadapa
District

Estimate Cost : Rs. 580.00 Lakhs

Grant: PMGSY

Name of the Mandal: PULIVENDULA

Name of the Sub Division: PULIVENDULA

Name of the Division: KADAPA

శధర శరర
9440557273
PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )
(Ministry of Rural Development ,Govt,of India)

Block : Simhadripuram District:


Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Ka
District
S.No. Description Format No.
1 PROFORMA B
2 CHECK SLIP FOR P.I.U. & S.T.A. C
3 FORMAT F1
4 FORMAT F2A
5 FORMAT F2B
6 FORMAT F4
7 FORMAT F4A
8 FORMAT F9A
9 FORMAT F9B
10 SUMMARY OF 3 DAY COUNT
11 SPECIFICATION REPORT
12 GENERAL ABSTRACT PART-A F5
13 PART-B [MAINTENANCE] F5
14 DETAILED CUM ABSTRACT ESTIMATE F6
15 DETAILED CUM ABSTRACT SUB ESTIMATES F7
16 SEIGNIORAGE CHARGES CALCULATION SHEET
17 AVERAGE LEAD CHART
18 QUARRY CHART
19 LEAD STATEMENT
20 RATE ANALYSIS [ DATA SHEET ] F8
21 EARTH WORK QUANTITY CALCULATION SHEET
22 DESIGN PAVEMENT THICKNESS
23 SOIL TEST REPORT
24 TYPICAL CROSS SECTION
25 LONGITUDINAL SECTION
26 KEY MAP
27 STRIP MAP
28 MAPS
29 CC PAVEMENT DESIGN
30 2.00 MTs/ 3.00 MTs. Span Slab Culvert Hydraulic Calcualtions
31 1000mm dia RCC Pipe cuvlert Hydraulic calculations
32 CBR
33
34
35
36
37
GRAM SADAK YOJANA ( P M G S Y )
ural Development ,Govt,of India)

Kadapa
namgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa
District
Page No.
PRADHAN MANTRY GRAM SADAK YOJANA (PMGSY)
Package summarry Proforma : B

PACKAGE No. State : Andhra pradesh District : YSR Kad

Type of Proposed cost of No of CD cost of CD


Sl. Name of the Road
Name of the Block Proposal length pavement works Works
No.
From To N/U KM Rs Nos Rs
1

1 Simhadripuram Dondlavagu Balapanur U 6.980 377.28 16 91.46

Superintending Engineer Executive Engineer DY.Executive Engineer


PR Circle Kadapa PIU Division Kadapa PIU SubDivision
Mydukur
District : YSR Kadapa

Total
Estimated Average cost
cost per Km
Rs Rs

468.74 67.15

Asst Executive Engineer


PIU SubDivision
Mydukur
6

PRADHAN MANTRY GRAMA SADAK YOJANA (PMGSY)


CHECK LIST FOR P.I.U. & S.T.A
(For Indlvidual Road Works)
To be filled by PIU :
1 Location State District Block
Chavvaripalli Andhra pradesh YSR Kadapa Simhadripuram
2 Package No.
3 Name of the Road Dondlavagu to Balapanur
4 Total Length (Km) 6.98 Kms In Built up area:Km In open Area:

5 Category of upgradation proposal A B C

If it is category 'C' road than indiacte


Year of sanction under PMGSY Year of completion

Yes No
Whether road deteriorated due non maintenance

6 Estimate Cost (Rs.) 468.74 Lakhs


Average Cost : 67.15 Lakhs
Item Total cost in Cost per Km in Lak
Rs.
Flexible Pavement 347.94 50.87
Rigid Pavement 29.34 209.56
others(CD works, Protective works & Misc items) 91.46 13.10
Total 468.74 273.53
7. Is the road a part of DRRP
a) If Yes , Through Route/ MRL No. T- or
b) Names of benefitted Growth points
Name of Habitation Population

Dondlavagu 1005
Balapanur 2444
Nakkalapalli 255
Total population 3704
Total weight
c) Utility value = Total weight/ Length of road
d) Does the Proposed Road lead up to the growth centre /hub or the road is
being made partially? Yes

e)Whether the proposed road leads to MDR SH NH

f) Average PCI of the road to which proposed T or MRL will be connected


7

g) Average PCI value of proposed road


h) If PCI of MDR / SH / NH is 3 or below , whether the State's undertaking for Yes
simultaneouly upgrading it from State fund is avaible

i) Age of the proposed road

j) Cummalative maintenance expenditure in last three years( in lacs)


8. a) Whether the Proposed Road has the desired carriage way
width,Roadway width and Road Land Width (RLW ) YES / NO
b) Indicate the actual widths of the following for the proposed road In the Built Up Area (m)

i) Carriageway -
ii) Roadway 5.00
iii) Road Land Width 7.50

INDEX MAP ( Not to scale ) Attached


0/0 Enroute Habitations Name/ Chainage

0/0 Dondlavagu 6/980


Dondlavagu R&B

R&B Road
RG Road-

Road

8 CROSS SECTION DETAILS


a) Cross Section of the existing road showing different component layers
Item T

b) Cross Section of the proposed road showing differenct component layers


(should be as per Actual Provisions of DPR)
Shoulder Carriage way Shoulder

1.5m 3.75 1.5m


8

slope 1:2
G.L

Item T

GSB

WMM

WMM

BT with SDBC
9

9 Base Year Traffic Volume


Month & Year of Traffic Volume
Motorised Traffic

Light commercial
Trucks Agricultrual Tractors/ Trailers Buses
vehcicles

Motorised
Days
Cars, two wheelers
Jeeps, L UL L UL OL L UL OL L UL
Vans,
Three
wheelers

Day1 5 15 8 10 5 2 0 17 15 0 0 0

Day2 5 24 16 10 5 2 0 16 16 0 0 0

Day3 5 32 14 10 5 3 0 15 14 0 0 0

Total 15 71 38 30 15 7 0 48 45 0 0 0

Avg. 5 24 13 10 5 2 0 16 15 0 0 0
a ADT in the year of Traffic Count= 148

Growth Rate adopted(%)= 6% Base Year Traffic AADT(T)=

Design Life= 10 Years

Number of Harvesting Seasons= 2

No. of Days in each Harvesting Season(t)= 75


Value of (n) assumed= 2 Cumulative ESAL= 170,353
Traffic Category= T-4
b Traffic Details in case degisn is done as per IRC 37-2001 /IRC 37 :2012

A= Intitial traffic in the year of completion of construction in terms of the number of commericial
vehicles per day
D= Lane distribution factor 1
F= Vehicle damage factor
n= Design life in years 10
r= growth rate adopted % 6%

N= The cumulative number of standard axles to be catered for the design in terms of msa
CVPD 151

10 Sub-grade CBR
Chainage 0/4-0/6 1/2-1/4 2/4-2/6 3/2-3/4 4/4-4/5 5/5-5/7 6/2-6/4

Design CBR (%) 3.80 3.90 3.80 3.90 3.90 3.8 3.90

11 Cost Details

A. Pavement components
10

Thick
Description of the Layer ness Qty. Cost (Rs
(mm)

Earth Work- in Filling (embankment) 47911.72 17


Subgrade(if provided separately) 150 mm 4209.00 42
Shoulders ( if not considered in the Earth work)
Selected Earth shoulders 150 mm 3965.63 10
Soil + Aggregate Mix
Clearing and grubbing 45120.00 0
WBM - Gr.II 75 mm
WBM - Gr.III 75 mm
WMM 150mm 3484.69 56
Bituminous Layers
Prime coat 23231.25 10
Tack coat 23231.25 2
SDBC 580.77 45
Seal Coat
M.P.M/BBM
Surface Dressing
Boulder removal 0.00 0
Total cost of flexible pavement 347
Cement Concrete Road
IRCSP 62:2013 IRC 58
Design done with

GSB
WBM
Dense lean concrete
Quantity of Concrete Pavement
Pavement Quality Concrete(M30) 555.00 29

B). CD Works :
Location - Chainage ( Similar Type of CD's may be grouped together) Type of CD & their Nos Total Length of Culv

i Existing CD ( requiring repair) NIL

ii New proposed CD ( including complete replacement of existing CDs)

1000mm dia Single vent Single Row Pipe culverts - 14 Nos


1V x 6.00 Mts Slab Culvert Slab Culvert-1No
5 Rows of 1000mm Dia Vented Causeway Vented Causeway-1No

Total Cost of CD works in lacs

C. Protection works
Chainage
11

From To Length( m)

Retaining wall (Protection Wall)


Breast wall
Toe wall
Gabbion
Pitching for slopes
Road dam
Total cost of protection works
D. Pucca Side Drains (if Provided) Chainage Length(
From To m)

Total cost of side drains works


E. Road Logo, other Road Furniture including Road safety signs
Numbe
r
Number of Boards
5th KM Stone 0
Ordinery KM Stone 8
H.M Stone (200M) Stone 28
Information Sign board 2
direction and place identifications of semi-reflective sign boards 3
semi-reflective cautionery, mandatory and informatory boards 40
Road Margins
Speed breakers
Moulded Shanks
Total cost of road furniture
F. Any other Provisions (Please Specify)
Total Cost of the Project (Rs)
J) Five Year Routine Maintenance
Year Cost in lakhs K
I Year 0.07 6
II Year 0.33 6
III Year 0.33 6
IV Year 0.60 6
V Year 0.67 6
Total Mtc. Cost 2.00

Maintenance after renewal coat

I 6.98
II 6.98
III 6.98
IV 6.98
V 6.98
Total Maintenance Cost

13 Whether the road has geometric as per rural roads manual (RRM) / Latest circulars of
NRRDA
12

14 Whether CD Works / Protetion Works Provided as per RRM / Latest circulars of NRRDA
/ Respective Codes

15.Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase
SSR 2018-19

14 Sources and the lead distance of Materials are as under:

Material Source Lead Distance Material Source


EARTH AT SITE 0 CEMENT AT SITE
SELECTED
Local 10.00 EMULSION Chennai
EARTH
AGGREGATE Muddanur 10.00 BITUMEN Chennai
SAND Kondapuram 5.00 STEEL AT SITE

Certified that information Provided is true.

Prepared by Checked by Scrutinized by

Supdt.Engineer Executive Engineer Dy.Exe.Engineer Asst. Exe. Engin


PR Kadapa PIU Division Kadapa PR PIU Sub Division PR PIU Sub Divi
Mydukur Muddanur
13

Counter Signature of Co-Ordinator STA:


To be filled by State Technical Agency
Name of the STA:
Name of
Road :

17 Is the Proposed Road entered on the OMMS under PMGSY II :


(Data entries to be verified by STA before Clicking the Propopsal)
18 Have you satisfied yourself that the proposed road is a part of DRRP
19 Are you satisfied with the following
Engineering Surveys (L section, X section on A3 size paper must be verified)
Soil/ Material Investigation ( CBR, Density, LL, PI, Gradation to be verified)
Whether Traffic Surveys / count has been done by third party
Hydraulic Studies.
( Catchment for structures with more than 2 Vents to be verified from topo sheet. Location and requirement of all CD
structures to be verified from L section )
20 In case , Traffic is projected beyond T 7 Category and road designed using IRC 37 are you satisfied with the
reason given by PIU

21 In case, sub grade CBR is less than 5; has Soil Stabilisation etc. been proposed

( If not , specific Reasons given by PIU)

22 Is the design of the following elements as per Rural Roads Manul / Circulars of NRRDA:

Alignment & Geometrics


Location and type of CD works and Side drains
Integration for Cross and longitudinal Drainage
Protection Works
23 Is the design of flexible Pavement as per IRC SP: 72- 2015 and design of Rigid Pavement as per IRC SP:62- 2004 .

Is the design of flexible Pavement as per IRC 37 2001 and design of Rigid Pavement as per IRC SP:58- 1998.

24 Does the proposal have provisions for


PMGSY Logo Sign Boards and Information Board
Km/Hm Stones
Guard Stones (where necessary )
Traffic Sign Boards (as necessary)

25 Secific Remarks, if any, by STA


( Specific remarks of STA about the overall project are necessary on each DPR)

Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR pro
Engineers . The Proposal after final Correction is entered on the OMMS.The Propasal may be considered
14
Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR pro
Engineers . The Proposal after final Correction is entered on the OMMS.The Propasal may be considered

Technical Scrutiny at STA done by:

Signature Co-ordinator STA:

Name Signature

Date Name

Date
15

SADAK YOJANA (PMGSY) PROFORMA-C


R P.I.U. & S.T.A
Road Works)
by PIU :
Block
Simhadripuram

KM

Year of completion

Cost per Km in Lakhs

50.87
209.56
13.10
273.53

L 0 6 0
Overall
Weightage

No

NH
16

No

YES / NO
In the Built Up Area (m) In the Open Area
(m)
- -
5.00 6.00
7.50 10.00

Thickness

mponent layers

Proposed SDBC 25mm thick


" WMM 75 mm
"WMM 75 mm
17

Granular sub base 150mm

slope 1:2
G.L

Thickness

150

75

75

25
18

Non Motorised Traffic

Animal Drawn
Buses

Cycle Rickshaws
Vehicles

Total

Cycles

Num Tyred
OL SWC

0 30 0 30 0 137

0 29 0 29 0 152

0 27 0 28 0 153

0 86 0 87 0 442

0 29 0 29 0 148

184.49 Nos.

170,353

10
6%

151

A. Clearing and Grubbing


19

Cost (Rs). Lakhs Cost/Km(Rs)

177.82 25.476
42.69 6.116

10.73 1.537

0.89 0.128

56.99 8.164

10.84 1.553
2.44 0.350
45.54 6.524
0.000

0.00 0.000
347.94

0
0

0
29.34 209.555

Total Length of Culvert Cost in Rs.( in lacs)

59.19
11.63
20.64

91.46
20

Cost in Rs (in lakhs) Average


cost / m

0.00
0.00 0.00
0.00 0.00
Average
Cost in Rs
cost / m

Cost in Rs Average
cost / km

0.00
14688.00
15226.00
18761.00
6155.00
62728.00
1001052.00
22548.00
455672.00
1596830.00 2.288
Err:509
Err:509 Err:509

KM Cost /Km
6.98 0.465
6.98 2.327
6.98 2.327
6.98 4.188
6.98 4.653
13.96

6667.00 46536.00
33333.00 232664.00
33333.00 232664.00
60000.00 418800.00
66667.00 465336.00
1396000.00

YES
21

YES

Vetted at
NRRDA Year
Yes No
√ ~ 2018-19

Source Lead Distance


AT SITE 0.00

Chennai 325.00

Chennai 325.00
AT SITE 0.00

Scrutinized by

Asst. Exe. Engineer


PR PIU Sub Division
Muddanur
22

chnical Agency

Yes / NO to be filled by STA in


own handwriting

ork are based on the data and SSR provided by PIU


MMS.The Propasal may be considered for clearance.
23
PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )
(Ministry of Rural Development ,Govt,of India)
Annexure 7.3
(See Para 7.4)

Block : Simhadripuram District:

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kad

[1] State: Andhra Pradesh Phase:

[2] Name of the Members of the STA involved in the Technical scrutiny

[3] Whether Pre-DPR meeting was held with SRRDA and DPIUs

[4] Summary of the Project Proposals scrutinized indicating district wise road wise detailes of length and c
includes the No. of packages and total value

[5] Whether schedule for scrutiny was fixed in advance ( give detailes) and difficulty in adhering to schedule

[6] Actual scrutiny process and time taken for scrutiny ( Please indicate the dates)

[7] Interaction of the Engineers fo the Executing Agencies with the STAs

[8] Major defixiencies observed during scrutiny with details

[9] Reliability of data obtained through investigations and used in the design/estimation

[10] Compliance of the provisions / instructions given in the guidelines / circulars / operations manula / IRC
prepareation of DPRs including Environmental / RR / Road safety aspects etc.,

[11] Levels of repsonse from the Senior Engineers of the Executing Agencies for the suggestions

[12] If DPRs outourced, Perceived level of competence of outsourced consultants and suggestions

[13] Overall comments and impression of the STAs. If any on the process of the preparation of DPRs
scrutiny
Name of th
TRI GRAM SADAK YOJANA ( P M G S Y )
of Rural Development ,Govt,of India)

YSR Kadapa

namgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Year: 2018-19

d indicating district wise road wise detailes of length and cost. The summary

vance ( give detailes) and difficulty in adhering to schedule

rutiny ( Please indicate the dates)

Agencies with the STAs

ith details

ons and used in the design/estimation

iven in the guidelines / circulars / operations manula / IRC codes etc., in the
al / RR / Road safety aspects etc.,

s of the Executing Agencies for the suggestions

ence of outsourced consultants and suggestions

TAs. If any on the process of the preparation of DPRs and their technical

Signature and
Name of the Co ordinator STA
PRADHAN MANTRI GRAM SADAK YOJANA
(Ministry of Rural Development, Govt.of India)
FORMAT - F1
SUMMARY SHEET
ANNEXURE-7
DISTRICT : YSR Kadapa Block : Simhadripuram Package No :

Unconnected Habitations
Name of the Block Total No.of Habitations
>1000 500-1000 250-500 <250
1 2 3 4 5 6

Simhadripuram 3 2 0 1 0

No.of New Villages


Estimated Cost
Connected
No.of New
Total Length of
Type of Work No.of Roads CD Pavement CD Structure
Road(KM) Total Total SC/ST
Structures from Format F- from Format
(5+6) Villages Villages
2A F-2B

1 2 3 4 5 6 7 8 9
Upgradation 1 6.98 16 469.79 50.21 520.00 3

Associated through Route

New Connectivity
other upgradation
Total 1 6.98 16 469.79 50.21 520.00 3.00

Superintending Engineer Executive Engineer DY.Executive Engineer Asst Executive Engineer


PR Circle Kadapa PIU Division Kadapa PIU SubDivision PIU SubDivision
Mydukur Mydukur
FORMAT - F1.

ANNEXURE-7.A
PRADHAN MANTRI GRAM SADAK YO
( Ministry of Rural Development, Govt. of

ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVIT


District YSR Kadapa Package

New construction (N) /


Name of Habitations
Associated Through Route
connected/ Benefitted by road
(A) / Upgradation (U)

Facility
Road Existing
S.No.

accessed
Name of Block Length Surface
Use
(Km) Type Clearing
A/B/C/D
Details and Earthwork
Grubbing
From To N A U

1 2 3 4 5A 5B 5C 6 7 8 9 10 11

Thickness
1 Simhadripuram Dondlavagu Balapanur N D 6.98 Earthen Rising
(mm)

Cost ( Rs.) 0.89 177.82


Superintending Engineer Executive Engineer
PR Circle Kadapa PIU Division Kadapa
ANTRI GRAM SADAK YOJANA
ural Development, Govt. of India )
FORMAT - F2A
OR RURAL CONNECTIVITY ( PAVEMENTS LAYER )
Package No.

Details of Thickness & cost for pavement layers

Surfacing (any one)

Other
unforese Total cost
WBM Gr.III
WBM Gr.II

B.O.E.
Sub-Grade en of

WMM
Sub Base Edging
preparatio CC Road items/ Pavement(
GSB Gr.III (shoulde
n GSB Gr.I Prime Tack Seal Road sum of 10
rs) PC
coat Coat coat furniture to 22)
& BM

12 13 14 15 15A 16 17 18 19 20 21 22 23

150 0 0 150 25

0.00 42.69 56.99 10.73 29.34 10.84 2.44 45.54 92.51 469.79
DY.Executive Engineer Asst Executive Engineer
PIU SubDivision PIU SubDivision
Mydukur Mydukur
PRADHAN MANTRI GRAM SADAK YOJANA

( Ministry of Rural Development, Govt. of India )

ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY ( PAVEMENTS LAYER )

DISTRICT : YSR Kadapa Package No.

Existing CD Structure by type Details of Proposed CD Structure by type


New
constr
Road Hume
S.No uction Box/Arch Minor Hume pipe Box/Arch Protection Total cost of
Name of the Road length pipe Details
. / culverts Bridges culvert culvert works proposed
in KM Culvert
Upgrad CD
ation Structure
No. Dia No. Length No. Length No. Dia No. Length No. Length

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 Dondlavagu N 6.980 - 0 - - - 16 1.00 50.21

to
Balapanur

16

Superintending Engineer Executive Engineer DY.Executive Engineer Asst Exe


PR Circle Kadapa PIU Division Kadapa PIU SubDivision PIU S
Mydukur
ANTRI GRAM SADAK YOJANA
FORMAT - F2B
ural Development, Govt. of India )

OR RURAL CONNECTIVITY ( PAVEMENTS LAYER )

Total Cost of Total Cost


Pavement from of the road
Format - 2 A (18 + 19 )

19 20

469.79 520.00

Asst Executive Engineer


PIU SubDivision
Mydukur
PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )
(Ministry of Rural Development ,Govt,of India)

DETAILS OF EXISTING ROADS FOR UPGRADATION

Block : Simhadripuram
District:

Road Road Facilites Trafffic per day Existing Road Details


Length connecting accessed
(Km) to * (use
A/B/C/D)** Total Total Truck/ Land Road Embankment WBM Layer
Sl. Motorised Tractor width width . (Formation)
Name of the Road
No. (m) (m) Height Width Width Thickness
(m) (m) (m) (mm)

1 2 3 4 5 6 7 8 9 10 11 12 13

1 Dondlavagu 6.980 D 81 7 10.00 5.00 0.300 5.00

to .

Balapanur

Superintending Engineer Executive Engineer DY.Executive Engineer


PR Circle Kadapa PIU Division Kadapa PIU SubDivision
Mydukur
FORMAT - F4

YSR Kadapa

ad Details

Bituminous Layer

Type*** Width Thickness


(m) (mm)

14 15 16

Asst Executive Engineer


PIU SubDivision
Mydukur
PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )
(Ministry of Rural Development ,Govt,of India)

DETAILS OF EXISTING ROADS FOR NEW CONNECTIVITY

Block : Simhadripuram
District:

Sl.N Package No. Primary net work Associated PCI Age Whether proposed Other non Whether includes
o. through for Upgradation confirmance in package Y/N
Route (ATR) subsidary to
No. Habitation served (with the ATR
population)

1 2 3 4 5 6 7 8 9 10
1 PMGSY 3 3704 Yes
Dondlavagu 1005
Balapanur 2444
Nakkalapalli 255

Superintending Engineer Executive Engineer DY.Executive Engineer Asst Executive E


PR Circle Kadapa PIU Division Kadapa PIU SubDivision
Mydukur
FORMAT - F4A

YSR Kadapa

Habitation served with


Population

11
3704

Asst Executive Engineer


PIU SubDivision
Mydukur
PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )
(Ministry of Rural Development ,Govt,of India)

DETAILS OF EXISTING ROADS FOR NEW CONNECTIVITY


FORMAT - F9A
Block : Simhadripuram
District: YSR Kadapa

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

[1] (a) Certified that the land width for the roads is availabe and that no additional land is required

(b) Certified that the land width for the roads is likely tobe available as certified by the Panchyats

[2] (a) Certified that no forest land is involved along the entire road way
[OR]
(b) Certified that the case for permission under Forest conservation Act has been moved to the
Forest Department on ( Date )

[3] Certified that the DPR has been checked at site by

Superintending Engineer Executive Engineer DY.Executive Engineer Asst Executive Engineer


PR Circle Kadapa PIU Division Kadapa PIU SubDivision PIU SubDivision
Mydukur Mydukur
ve Engineer
PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )
(Ministry of Rural Development ,Govt,of India)

LIST OF DPRS VERIFIED ON GROUND


FORMAT - F9B
Block : Simhadripuram
District: YSR Kadapa

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

S.No. DPRs seen on ground by DPR Nos. % of total number


1 A.E.E 1 1

2 Dy.E.E.

3 E.E.

4 S.E.

Head of PIU

Executive Engineer
PIU Division Kadapa
Table 5.1 Average Daily Traffic at {Insert location} (both ways) {The table will be repeated for the number of
locations surveyed. This must include counts taken on the similar road.}

Sl. No. Type of Vehicle Day-1 Day-2 Day-3


1 Car, Jeep, Van 5 5 5
2 Auto Rickshaw 18 15 8
3 Scooters/Motorbikes 15 24 32
4 Bus / Minibus 0 0 0
5 Trucks 7 7 8
6 Tractors with trailer 32 32 29
7 Tractor without trailer
8 Cycles 30 29 27
9 Cycle Rickshaw / Hand Cart 0 0 0
10 Horse cart / Bullock Cart 30 29 28
11 Pedestrian

Total commercial vehicle per day (cvpd) 137 141 137

Total motorised vehicle per day 77 83 82

Total non-motorised vehicle per day 60 58 55


location} (both ways) {The table will be repeated for the number of
counts taken on the similar road.}

Average
5
14
24
0
7
31
0
29
0
29
0

138

81

58
Table 5.2 Average Annual Daily Traffic at {Insert location} (both ways) {This table will be repeated for each homogeneous
Sl. No. Type of Vehicle ADT AADT

1 Car, Jeep, Van 5 6

2 Auto Rickshaw 14 17

3 Scooters/Motorbikes 24 30

4 Bus / Minibus 0 0

5 Trucks 7 9

6 Tractors with trailers 31 39

7 Tractors without trailers 0 0

8 Cycles 29 36

9 Cycle Rickshaw / Hand Cart 0 0

10 Horse cart / Bullock Cart 29 36

11 Pedestrian 0 0

Total commercial vehicle per day (cvpd) 138 172

Total motorised vehicle per day 81 101

Total non-motorised vehicle per day 58 72


th ways) {This table will be repeated for each homogeneous section of the road.}
Growth Rate

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06
SUMMARY OF 3 - DAY COUNT

Name of the Road :- Providing BT to the road from Krishnamgaripalli to Ahobilapura

Location of the raod :- Km


Taluk :- PULIVENDULA
District :- YSR Kadapa
State :- Andhra Pradesh

Day Day-1 Day-2

Animal Drawn Vehicles 30 29

Cycles 30 29

Motorised Two wheelers 15 24

Laden 5 5
Trucks
Unladen 2 2

Laden 0 0
Buses
Unladen 0 0

Laden 17 16
Agricultural
Tractors / Trailers
Unladen 15 16

Medium Laden 8 16
commercial
vehicles
Unladen 10 10

Cars, Jeeps,
Vans, Three 5 5
wheelers

Total traffic (T) Lean Season 148


No. of Harvesting Season (s) 2

Duration of single Harvesting season (t) 75

Average Annual Daily Traffic AADT = T +


148 +

148 +

148 +

AADT = 184.49

Before opening of the road to traffic AADT = AADT X (1.06)2

184.49

207.30

ESAL applications per day (Taking the VDF values in consideration)

Type HCV Laden HCV Unladen MCV Laden

No. of Vehicles 5 2 29

Proportion of
projected AADT / 1.401 1.401 1.401
ADT

No. of Vehicles
Based on daily 7 3 41
count

VDF per Vehicle 2.86 0.31 0.34

VDF
20.03 0.87 13.81
Conslidated

ESAL / DAY

4811 (7 x 2.86 + 3 x 0.31 + 41x


Cumulative ESAL Applications over 10 years @ 6% Growth rate

4811 35.41

ESAL 170353
Pavement Thickness Design
Design data

Cumulative ESAL applications for 10 years = 170353


Average rain fall = 720
Soaked CBR of Selected Earth = 5.60%
Design

Design pavement thickness from IRC SP 72 - 2014 =


Provisions made for crust thickness of 300 mm is as below
GSB =150 mm
Base course : WMM = 150mm

Superintending Engineer Executive Engineer Dy.Exe.Engineer


PR Circle Kadapa PIU Division Kadapa PR PIU Sub Division
Mydukur
MMARY OF 3 - DAY COUNT

om Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Day-3 Total Average

28 87 29

27 86 29

32 71 24

5 15 5

3 7 2

0 0 0

0 0 0

15 48 16

14 45 15

14 38 13

10 30 10

5 15 5

Average Daily Traffic (ADT) = 148


S x nT x 0.6 x t

365
2 X 148 X 0.6 X 75
365

13320
365

36.49

ADT X (1.06)2

X 1.06 X 1.06 = 207.30

eration)

MCV Unladen

25

1.401

35

0.02

0.70

35.41

(7 x 2.86 + 3 x 0.31 + 41x 0.34 + 35 x 0.02)


170353 170353.0890811

Traffic category T-4

Nos / day
mm / annum

300 mm

Asst. Exe. Engineer


PR PIU Sub Division PR PIU Sub Division
Mydukur
FIELD DATA SHEET FOR TRAFFIC CENSUS ( BOTH DIRECTIONS)
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Location of the Road:

District: YSR Kadapa

State: ANAHDRA PRADESH


Day-1
Vehicles Class
Cars, Jeeps, Vans, Motorised Light commercial Trucks Agricultrual Buses Cycle Cycle Animal Drawn
Three wheelers two vehcicles Tractors/ Trailers Rickshaws Vehicles
Hour wheelers
Laden Unladen Laden Unladen Laden Unladen

From 6AM Hrs 1 5 3 2 1 1 5 4 0 8 0 9

To 9AM Hrs

From 9AM Hrs 2 4 1 2 2 0 3 3 0 7 0 7

To 12NOON Hrs

From 12NOON Hrs 1 3 2 4 1 1 5 3 0 8 0 6

To 3PM Hrs

From 3PM Hrs 1 3 2 2 1 0 4 5 0 7 0 8

To 6PM Hrs

Day Total 5 15 8 10 5 2 17 15 0 30 0 30

Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle ( IIII IIII II )

Superintending Engineer Executive Engineer Dy.Exe.Engineer Asst. Exe. Engineer


PR Circle Kadapa PIU Division Kadapa PR PIU Sub Division PR PIU Sub Division
Mydukur Mydukur
T FOR TRAFFIC CENSUS ( BOTH DIRECTIONS)
am of Pulivendula (M) in YSR Kadapa District

Remarks
Season: Post
Harvest/ Monsoon,
Weather

Asst. Exe. Engineer


PR PIU Sub Division
FIELD DATA SHEET FOR TRAFFIC CENSUS ( BOTH DIRECTIONS)

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Location of the Road:

District: YSR Kadapa

State: ANAHDRA PRADESH


Day-2
Vehicles Class
Cars, Jeeps, Vans, Motorised Light commercial Trucks Agricultrual Buses Cycle Cycle Animal Drawn
Three wheelers two vehcicles Tractors/ Trailers Rickshaws Vehicles
Hour wheelers
Laden Unladen Laden Unladen Laden Unladen

From 6AM Hrs 2 8 5 3 2 1 4 4 0 8 0 8

To 9AM Hrs

From 9AM Hrs 1 9 3 2 1 0 3 4 0 8 0 7

To 12NOON Hrs

From 12NOON Hrs 1 3 3 3 1 1 5 3 0 6 0 6

To 3PM Hrs

From 3PM Hrs 1 4 5 2 1 0 4 5 0 7 0 8

To 6PM Hrs

Dry Total 5 24 16 10 5 2 16 16 0 29 0 29

Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle ( IIII IIII II )

Superintending Engineer Executive Engineer Dy.Exe.Engineer Asst. Exe. Engineer


PR Circle Kadapa PIU Division Kadapa PR PIU Sub Division PR PIU Sub Division
Mydukur Mydukur
T FOR TRAFFIC CENSUS ( BOTH DIRECTIONS)

am of Pulivendula (M) in YSR Kadapa District

Remarks
Season: Post
Harvest/ Monsoon,
Weather

Asst. Exe. Engineer


PR PIU Sub Division
FIELD DATA SHEET FOR TRAFFIC CENSUS ( BOTH DIRECTIONS)

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Location of the Road:

District: YSR Kadapa

State: ANAHDRA PRADESH


Day-3
Vehicles Class
Cars, Jeeps, Vans, Motorised Light commercial Trucks Agricultrual Buses Cycle Cycle Animal Drawn
Three wheelers two vehcicles Tractors/ Trailers Rickshaws Vehicles
Hour wheelers
Laden Unladen Laden Unladen Laden Unladen

From 6AM Hrs 1 8 5 3 1 1 6 4 0 8 0 7

To 9AM Hrs

From 9AM Hrs 2 9 4 2 2 1 3 5 0 6 0 8

To 12NOON Hrs

From 12NOON Hrs 1 8 3 3 1 1 2 2 0 5 0 6

To 3PM Hrs

From 3PM Hrs 1 7 2 2 1 0 4 3 0 8 0 7

To 6PM Hrs

Day Total 5 32 14 10 5 3 15 14 0 27 0 28

Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle ( IIII IIII II )

Superintending Engineer Executive Engineer Dy.Exe.Engineer Asst. Exe. Engineer


PR Circle Kadapa PIU Division Kadapa PR PIU Sub Division PR PIU Sub Division
Mydukur Mydukur
T FOR TRAFFIC CENSUS ( BOTH DIRECTIONS)

Remarks
Season: Post
Harvest/ Monsoon,
Weather

Asst. Exe. Engineer


PR PIU Sub Division
FORMAT -F5

PRADHAN MANTRI GRAM SADAK YOJANA ( P M G S Y )


(Ministry of Rural Development ,Govt,of India)

PART-B (MAINTENANCE)

Block : Simhadripuram
District:
Sl. Effective Length in
Description Rate / KM
No. KM
1 2 3 4
Maintence cost for the defective Liability
1
Period for BT roads

I Year 6.98 6667.00

II Year 6.98 33333.00

III Year 6.98 33333.00

IV Year 6.98 60000.00

V Year 6.98 66667.00

TOTAL

Supdt.Engineer Executive Engineer Dy.Exe.Engineer


PR Circle Kadapa PIU Division Kadapa PR PIU Sub Division
Mydukur
FORMAT -F5

MANTRI GRAM SADAK YOJANA ( P M G S Y )


istry of Rural Development ,Govt,of India)

PART-B (MAINTENANCE)
PMGSY

YSR Kadapa

Amount

46536.00

232664.00

232664.00

418800.00

465336.00

1396000.00

Asst. Exe. Engineer


PR PIU Sub Division
Mydukur
GOVERNMENT OF ANDHRAPRADESH

PANCHAYAT RAJ ENGINEERING DEPARTMENT

DETAILED ESTIMATE

Name of work: Providing BT road from Krishnamgaripalli to


Ahobilapuram of Pulivendula (M) in YSR Kadapa District

TOTAL LENGTH OF THE ROAD : 7.050 KM

PROPOSED LENGTH : 7.050 KM

ESTIMATED COST : 580.00 Lakhs

NAME OF MANDAL : PULIVENDULA

NAME OF THE CONSTITUENCY : PULIVENDULA

NAME OF THE SUBDIVISION : PULIVENDULA

NAME OF THE DIVISION : KADAPA

NAME OF THE CIRCLE : KADAPA


palli to
strict
INSPECTION REPORT OF THE SUPERINTENDING ENGINEER, P.R.CIRCLE, KADAPA.
PRESENT: SRI B.Subba Reddy, M.TECH.,

Name of the Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pu


: (M)
work in YSR Kadapa District

Date of : 13-08-2018
Inspection

Officers Present : Sri B.Subba Reddy, Executive Engineer, PRI,Jammalamadugu

Sri D.Sudhakar Reddy, PIU Sub Division, Mydukur


Sri.M.R.Deepak Reddy , Assistant Exe Engineer, PIU Sub Division, Mydukur
@@@

The work " Providing BT to the Road from Kadapa-Kurnool Road @ Bhumayapalli to Santhinagaram via
Muthalurupadu,Krishnampalli in Khajipet (M) in YSR Kadapa District",which was administratively sanctioned for Rs
under Panchayat Raj Assets Grant vide Go.Rt.No 952 ,dt:27.07.2018 of PR&RD (Progs.II) Dept.It is Single connective
villages Bhumayapalli,Muthalurupadu,Moolavaripalli and Krishnampalli .The total lengthof the road is 5.300 km .Th
road surface is km 0/0-3/650 Badly damaged BT Surface with PCI value 1 & in Km 3/650-5/300 earthen surface ., In
road along the above staff and instructed to prepare detailed estimate with the following items which are necessar
conditions.

1 As there is stream ,for crossing it is instructed to provide 1Vx2.00Mt Slab culvert in Km 0/2-0/4

As there are stream ,for crossing it is instructed to provide 1000mm Dia Pipe culvert in Km 0/4-0/6
2 2/0,3/8-4/0 (3No).
As there are field channels ,for crossing it is instructed to provide 600mm Dia Pipe culvert in Km 2/
3 3/2,3/6-3/8,3/8-4/0 (4Nos).

4 As there is existing damaged culvert in Km 0/8-1/0,it is instructed to provide repairs to the existing

It is instructed to Provide of CC drain in Muthalurupadu HW ,Muthalurupadu Main village and Muthalurup


5 Madigawada.
6 It is instructed to Provide of Guide posts along the Irrigation canal.
It is instructed to rise embankement up to 300mm thick with carted earth in km 4/350-5/300 and Widen th
7 carted earth in Km 0/0-4/350.
It is instructed to provide GSB to a compacted thickness of 150 mm in KM 4/350-5/300 and to a compacte
8 100 mm in KM 2/700-2/850 , 3/650 -4/350.

It is instructed to provide WMM to a compacted thickness of 100 mm in KM 0/0-0/300,0/600-1/800,2/850


9 compacted thickness of 75 mm in KM 2/700-2/850,3/650 -4/350 and to a compacted thickness of 150 mm
- 5/300 .

It is instructed to Provide Prime coat, Tack coat, SDBC 25 mm thick in to a compacted thickness of 25 mm in
10 0/300,0/600-1/800,2/850-3/650, 4/350 - 5/300.
It is instructed to provide CC Pavement of M30 Grade to a compacted thickness of 170 mm in KM 0/300-0/
11 2/220,2/700-2/850 and 3/650-4/350 .
12
It is instructed to provide Selected earth shoulders of 1.125 Mtr width & 150 mm compacted thick in KM 0/
The Executive Engineer , PIU Division ,Kadapa and Deputy Executive Engineer, PIU S
Mydukur are instructed to prepare the detailed estimate duly providing the above provisions.

SUPERINTNEDING ENGINEE
P.R.CIRCLE, KADAPA.
Y.S.R.DISTRICT.
To
The Executive Engineer, PIU division, Kadapa,
Copy to the Dy.Executive Engineer, PIU subdivision, Mydukur.
Copy submitted to the Chief Engineer , PR , Vijayawada for favour of information.
ENDING ENGINEER, P.R.CIRCLE, KADAPA.
bba Reddy, M.TECH.,

d from Krishnamgaripalli to Ahobilapuram of Pulivendula

eer, PRI,Jammalamadugu

xe Engineer, PIU Sub Division, Mydukur

ool Road @ Bhumayapalli to Santhinagaram via


strict",which was administratively sanctioned for Rs.300.00 Lakhs
2018 of PR&RD (Progs.II) Dept.It is Single connectivety to the
nampalli .The total lengthof the road is 5.300 km .The existing
CI value 1 & in Km 3/650-5/300 earthen surface ., Inspected the
stimate with the following items which are necessary as per field

ovide 1Vx2.00Mt Slab culvert in Km 0/2-0/4

provide 1000mm Dia Pipe culvert in Km 0/4-0/6,1/8-

ted to provide 600mm Dia Pipe culvert in Km 2/6-2/8,3/0-

it is instructed to provide repairs to the existing culvert.

u HW ,Muthalurupadu Main village and Muthalurupadu

ation canal.
with carted earth in km 4/350-5/300 and Widen the road with

s of 150 mm in KM 4/350-5/300 and to a compacted thickness of

ess of 100 mm in KM 0/0-0/300,0/600-1/800,2/850-3/650 , to a


50 -4/350 and to a compacted thickness of 150 mm in KM 4/350

5 mm thick in to a compacted thickness of 25 mm in KM 0/0-

o a compacted thickness of 170 mm in KM 0/300-0/600,1/800-

125 Mtr width & 150 mm compacted thick in KM 0/0-5/300 .


,Kadapa and Deputy Executive Engineer, PIU Sub Division ,
uly providing the above provisions.

SUPERINTNEDING ENGINEER,
P.R.CIRCLE, KADAPA.
Y.S.R.DISTRICT.

favour of information.
KEY MAP
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Ahobilapuram @ PRP Road


7/100

6/400 Pulivendula Ring road Crossing

6/000 Existing Slab Culvert

3/800 BT road Crossing

3/200 Existing Slab Culvert

0/820 Proposed Vendted Causeway

0/740

0/0
Krishnamgaripalli
SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER, DY.EXE.ENGINEER, ASST. EXE ENGINEER,
PANCHAYATIRAJ, KADAPA PIU DIVISION, KADAPA PRI SUB DIV Pulivendula PRI SUB DIV Pulivendula
dapa District
EXE ENGINEER,
UB DIV Pulivendula
STRIP MAP
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of
Pulivendula (M) in YSR Kadapa District

MUTHALURUPADU-SANTHINAGARAM
5/300

Proposed GSB :150mm ,WMM:150mm& BT 25 mm thick

Proposed 1000mm Dia PC 4/350


Proposed 600mm Dia PC Proposed GSB :100mm ,WMM:75mm& CC 170 mm thick
Proposed 600mm Dia PC
3/650
Proposed 600mm Dia PC Proposed WMM:100mm & BT 25 mm thick

2/850
Proposed 600mm Dia PC

Proposed GSB :100mm ,WMM:75mm& CC 170 mm thick

2.700

Existing CC road

2.200

Proposed 1000mm Dia PC

Proposed CC: 170 mm thick in Muthalurupadu village

1.800

Proposed WMM:100mm & BT 25 mm thick

0.600
Proposed 1000mm Dia PC

Proposed CC: 170 mm thick in Bhumayapalli village


Proposed 1V X 2.00mm SC
0/300
Proposed WMM :100mm & BT 25 mm thick

0/0

KADAPA-KURNOOL ROAD

DY.EXE.ENGINEER, ASST. EXE ENGINEER,


PRI SUB DIV Pulivendula PRI SUB DIV Pulivendula

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATIRAJ, KADAPA PIU DIVISION, KADAPA
SPECIFICATION REPORT
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Estimate Cost : Rs. 580.00 lakhs

This road connecting Dondlavagu, Balapanur & Nakkalapalli villages . This road is Multi connectivety to this
villages .The total length of the road is 6.980 km .The existing road surface is km 0/0-6/980 earthen surface ., It is proposed to
strengthen the road up to BT standards to with stand future traffic.

Provisions of Estimate:
1 Providing clearing and grubbing road land at km 0/0-7/050

2 Providing rising of embankment with carted earth in KM 0/0-7/050

3 Providing GSB to a compacted thickness of 150 mm in KM 0/0-7/050

4 Providing Wet Mix to a compacted thickness of 150 mm in KM 0/820-7/050

5 Providing Prime coat, Tack coat, SDBC 25 mm thick in to a compacted thickness of25 mm in KM 0/820-7/050

6 Providing Selected earth shoulders of 1.875 Mtr width & 150 mm compacted thick in KM 0/0-7/050

7 Construction of 1V X 6m span RCC slab culvert - 1 No.s in 2/880-2/890 KM


8 Construction of 5 Rows 1000 mm dia Vented Causeway in KM 0/740-0/820

9 Construction of CC road from 0/000-0/740 3.75Mts widthe and 200mm Thick

Construction of 1000 mm dia pipe culvert in Km 0/000, 0/620, 1/115, 1/360, 1/507, 1/900, 3/300, 3/380, 3/500, 3/840,
9 4/030, 4/320, 4/465, 4/630, 4/800, 4/940, 6/350, 6/385, 6/730, 6/820, 7/043 -Total 21 Nos

10 Provision for GST,Seignarage,QC,Price exclanatoin,DPR,Unforceen charges


The Detailed Estimate is prepared as per SSR for the year 2019-20 and as per APDSS

DEPUTY EXE ENGINEER ASST.Exe. ENGINEER


PRI SD PULIVENDULA PRI SD PULIVENDULA

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATI RAJ, KADAPA PR DIVISION Jammalamadugu
Pulivendula (M) in YSR Kadapa District

This road is Multi connectivety to this


80 earthen surface ., It is proposed to

ess of25 mm in KM 0/820-7/050

d thick in KM 0/0-7/050

, 1/507, 1/900, 3/300, 3/380, 3/500, 3/840,


43 -Total 21 Nos

per APDSS

ASST.Exe. ENGINEER
PRI SD PULIVENDULA

EXECUTIVE ENGINEER,
PR DIVISION Jammalamadugu
GENERAL ABSTRACT
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of
Pulivendula (M) in YSR Kadapa District

172.00 Estimate amount: Rs: 580.00


S.No. Description km/ No.
1 Road Portion
2 Road furniture
3 CD works

Construction of 1000 mm dia pipe culvert in Km 0/000,


0/620, 1/115, 1/360, 1/507, 1/900, 3/300, 3/380, 3/500,
a 21 281848
3/840, 4/030, 4/320, 4/465, 4/630, 4/800, 4/940, 6/350,
6/385, 6/730, 6/820, 7/043 -Total 21 Nos

b Construction of 1V X 6m span RCC slab culvert - 1 No.s in 1 1163251


2/880-2/890 KM

Construction of 5 Rows 1000 mm dia Vented Causeway in KM


c 1 2064186
0/740-0/820

Total

4 Add GST @ 12 %

5 Provision for QC charges @ 0.5%

6 Provision for NAC charges @ 0.1%

7 Provision for DPR Charges 7.05 15000

8 Provison for Seigniorage Charges

9 Unforeseen items

DEPUTY EXE ENGINEER ASST. EXE ENGINE


PRI SD PULIVENDULA PRI SD PULIVENDU

SUPERINTENDING ENGINEER EXECUTIVE ENGINE


PR, KADAPA PR DIVISION Jammalam
o Ahobilapuram of

Lakhs
Amount
37727678
1596830

5918808

1163251

2064186

48470753

5816490

242354

48471

105750

2574408

741774

58000000

ASST. EXE ENGINEER


PRI SD PULIVENDULA

EXECUTIVE ENGINEER
PR DIVISION Jammalamadugu
COST ESTIMATE FOR ROAD CONSTRUCTION

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M


Kadapa District
S.No Description No Measurments Quantity Rate / per
L B D
1 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and stacking of serviceable material to
be used or auctioned, upto a lead of 1000 m including removal and disposal of top
organic soil not exceeding 150 mm in thickness as per Technical Specification Clause
201 MORD . including contractors profit & Over head charges but excluding ,
Seigonarage charges & GST

KM 0/0- 7/050
1 X 2 7050.00 2.00 28200.00

28200.00
deduct Voids 40%
-11280.00

45120.00 1.98
sqm
2 Construction of embankment with Selected earth obtained from borrow pits with all
lifts, transporting to site, spreading, grading to required slope and compacting with
vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead
upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors
profit & Over head charges but excluding , Seigonarage charges & GST

As per Levels Sheet


47911.72

47911.72 371.14
Cum
3 Construction of granular sub-base by providing well graded material(Table 400.1)
with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI
Value less than 6 spreading in uniform layers with Tractor grader on prepared
surface, mixing by mix in place method with rotavator at OMC, and compacting with
Vibratory Roller to achieve the desired density, complete as per Technical
Specification Clause 401 MORD .including contractors profit & Over head charges but
excluding , Seigonarage charges & GST

KM 0/0-7/050 1 X 1 7050.00 4.00 0.15 4230.00


Deduct for existing canal in km
3/200 to 3/205 1 X 1 5.00 4.00 0.15 -3.00

Deduct for existing canal in


km5/975-5/985 1 X 1 10.00 4.00 0.15 -6.00

Page 86 of 296
S.No Description No Measurments Quantity Rate / per
L B D
Deduct for BT ROAD CROSSING
in km 6/360-6/380 1 X 1 20.00 4.00 0.15 -12.00

4209.00 1014.31
cum
4 Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in
uniform layers in sub-base/base course on a well prepared sub-base and compacting
with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to
achieve the desired density including lighting, barricading and maintenance of
diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406
MORD/ MORTH,including overhead charges & Contractor profit, But excluding GST

KM 0/820-7/050 1 X 1 6230.00 3.75 0.150 3504.38


Deduct for existing canal in km
3/200 to 3/205 1 X 1 5.00 3.75 0.150 -2.81

Deduct for existing canal in


km5/975-5/985 1 X 1 10.00 3.75 0.150 -5.63
Deduct for BT ROAD CROSSING
in km 6/360-6/380 1 X 1 20.00 3.75 0.15 -11.25

3484.69 1635.31
cum
5 Providing and applying Prime coat with bitumen emulsion (SS-1) on prepared surface
of granular base including cleaning of road surface and spraying primer at the rate of
0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
MORD (for use on Wet mix macadam & WBM) ,including overhead charges &
Contractors profit etc., Complete but Excluding GST for Prime Coat

KM 0/820-7/050 1 X 1 6230.00 3.75 23362.50


Deduct for existing canal in km
3/200 to 3/205 1 X 1 5.00 3.75 -18.75

Deduct for existing canal in


km5/975-5/985 1 X 1 10.00 3.75 -37.50
Deduct for BT ROAD CROSSING
in km 6/360-6/380 1 X 1 20.00 3.75 -75.00

23231.25 46.66
sqm

Page 87 of 296
S.No Description No Measurments Quantity Rate / per
L B D
6 Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as per Technical Specification
Clause 503 MORD,including overhead charges & Contractors profit etc., Complete
but Excluding GST for Tack Coat

KM 0/820-7/050 1 X 1 6230.00 3.75 23362.50


Deduct for existing canal in km
3/200 to 3/205 1 X 1 5.00 3.75 -18.75

Deduct for existing canal in


km5/975-5/985 1 X 1 10.00 3.75 -37.50
Deduct for BT ROAD CROSSING
in km 6/360-6/380 1 X 1 20.00 3.75 -75.00

23231.25 10.51
sqm
7 Providing and laying Semi dense bitumious concrete with 40-60 TPH batch type HMP
producing a average output of 37.5 tonnes per hour using chrushed aggreates of
specified grading,premixed wetbituminous binder &4.5 to 5 percent of mix and
filter,tranporting the hot mix to work site,layingwith a hydrostatic paver finisher with
sensor control to the required grade,level and alighment,rolling with smooth
wheeled, vibratiry and tandem rollers to achieve the desirod compaction as per
MORT Specification clause NO,508, Complete in all respects , including overhead
charges & Contractors profits but execluding GST,seignarage charges

KM 0/820-7/050 1 X 1 6230.00 3.75 0.025 584.06


Deduct for existing canal in km
3/200 to 3/205 1 X 1 5.00 3.75 0.025 -0.47

Deduct for existing canal in


km5/975-5/985 1 X 1 10.00 3.75 0.025 -0.94
Deduct for BT ROAD CROSSING
in km 6/360-6/380 1 X 1 20.00 3.75 0.025 -1.88

580.77 7840.70
Cum
8 Construction of Improved sub-grade/Shoulders by providing selected earth having
MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and
spreading in uniform layers with tractor grader on prepared surface and compacted
at OMC with vibratory roller 80-100 kN to achieve the desired density complete as
per IRC Technical Specification Clause 303 MORD by using machinery including all
overheads and contractor's profit but excluding GST and Seigniorage charges.

KM 0/0- 7/050 1 X 2 7050 1.875 0.15 3965.63

Page 88 of 296
S.No Description No Measurments Quantity Rate / per
L B D
3965.63 270.59
cum

Page 89 of 296
S.No Description No Measurments Quantity Rate / per
L B D
9 Construction of un-reinforced, dowel jointed at expansion and construction joint
only, plain cement concrete pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix
design, laid in approved fixed side formwork (steel channel, laying and fixing of 125
mictron thick polythene film, wedges, steel plates including levelling the formwork as
per drawing), spreading the concrete with sholvels, rakes, compacted using needle,
scareed and plate vibrators and finished in continuous operation including provision
of contraction and expansion, construction joints, applying debonding strips, primer,
sealant, dowel bars, near approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14- days, curing compound
(where specified) and water finishing to lines and grade as per drawing and Technical
Specification Clause 1501 MORD.including overhead charges & Contractors profit but
excluding GST and seinorage

Km 0/000-0/740 1 X 1 740.00 3.75 0.20 555.00


555.00 5286.08
cum
Total

DEPUTY EXE ENGINEER ASST. EXE ENGINEER


PRI SD PULIVENDULA PRI SD PULIVENDULA

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATI RAJ, KADAPA PR DIVISION Jammalamadugu

Page 90 of 296
ATE FOR ROAD CONSTRUCTION

Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR


Kadapa District
Amount

89338

17781956

Page 91 of 296
Amount

4269231

5698548

1083970

Page 92 of 296
Amount

244160

4553643

Page 93 of 296
Amount

1073058

Page 94 of 296
Amount

2933774

37727678

Page 95 of 296
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa Distric

Sub Work : Construction of 1Vx2.00 Mts Slab Culvert in km 0/2-0/4


S.N Description of items Number L B D Unit Qty Rate

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and
1 disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including overhead charges & Contractors profit
but excluding GST.

For Raft 1 x 1 4.60 9.10 2.00 83.72


For wings 1 x 4 3.00 1.60 1.50 28.80
Cu.m 112.52 94.90

Providing concrete for plain concrete M 10 grade in open foundations


using 40 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
2 for 14 days complete as per drawings and technical specifications Clause
802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit but excluding GST.

For Raft 1 x 1 4.60 9.10 0.30 12.56


For wings 1 x 4 3.00 1.60 0.30 5.76
Cu.m 18.32 3423.80

Plain cement concrete M 15 grade using 40,20 & 10mm metal


mechanically mixed in Foundation complete as per drawings and
3 technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding GST.

for abutments
1 st step 1x 2 8.70 1.700 0.40 11.83
2 nd step 1x 2 8.30 1.500 0.40 9.96
3 rd step 1x 2 7.90 1.300 0.40 8.22
For Wing walls
1 st step 1x 4 2.00 1.600 0.40 5.12
2 nd step 1x 4 2.00 1.400 0.40 4.48
3 rd step 1x 4 2.00 1.200 0.40 3.84
Cu.m 43.45 3784.50
Plain cement concrete M 15 grade using 40,20 & 10mm metal
mechanically mixed in substructure complete as per drawings and
4 technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding GST.

for abutments
Body Wall (1.0+0.7)/2 1x 2 7.50 0.850 1.00 12.75
For Wing walls
Body Wall (0.90+0.40)/2 1x 4 2.00 0.650 1.40 7.28
Cu.m 20.03 4002.90

Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in substructure as per
5 drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.

Bed blocks 1x 2 7.50 0.70 0.20 2.10


Dirt walls 1x 2 7.50 0.40 0.24 1.44
Cu.m 3.54 5435.70

Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
6 drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding GST upto 5m height.

for deck slab 1x 1 7.50 2.60 0.24 Cu.m 4.68


for parapets 1x 2 3.60 0.30 0.600 Cu.m 1.30
Cu.m 5.98 5914.00

Providing and laying cement concrete wearing course M 30 (Design Mix)


grade using 20 & 10mm metal mechanically mixed excluding
7 reinforcement complete as per drawing and technical specifications
Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding cost of steel and VAT.

for wearing course 1x 1 7.50 3.40 0.075 Cu.m 1.91 5180.90


Providing weep holes in brick masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall with 110 mm dia PVC pipe
extending through the full width of the structures with slope of 1(V):20(H)
8 towards drawing face complete as per drawing

2 x 4 1.00 No 8.00 841.90


Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost
9 and conveyance and all labour charges etc., complete

2 x 1 7.50 0.24 Sqm 3.60 1114.90


Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in
substructure complete as per drawings and technical specification Clauses
1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars
10 below 36 mm dia including over laps and wastage,

For Bed blocks & Dirt wall MT 0.39 54329.40

Supplying, fitting, and placing HYSD bar reinforcement in superstructure


complete as per drawing and technical specifications Clauses 1002, 1010
11 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over
laps and wastage, where they are not welded ,including overhead charges
& Contractors profit but excluding VAT.

for Deck slab & Parapets MT 0.61 55766.10


TOTAL:

DEPUTY EXE ENGINEER ASST.EXE. ENGINEER


PIU,SUB DIVISION, MYDUKUR PIU,SUB DIVISION, MYDUKUR

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


P.R.CIRCLE , KADAPA PIU DIVISION , KADAPA
KS

M) in YSR Kadapa District

Amount

10678

62724

164437
80178

19242

35342

9896

6735

4014
21188

34017
448451

T.EXE. ENGINEER
DIVISION, MYDUKUR

CUTIVE ENGINEER
DIVISION , KADAPA
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in Y

Construction of 2-00 m Span - Slab Culvert

V.C.C. -M30- 75mm thick for wearin

V.R.C.C. M25 for Slab -240mm thick

V.C.C. M 15

340

Parapet
40
24

20 70

2.00
144

100

G.L. 10 100 20
130
40 0
40 150 20
150 40 20
170
190
30
620
620

460

Note: All dimensions without units are in Cms. CROSS SECTION C.C. -M10

Superintending Engineer, Executive Engineer , Dy. Exe. Engineer,


PR Circle : YSR Dist. PIU.,Division, P.I.U. Sub-Division ,
KADAPA Kadapa. Mydukur
(M) in YSR Kadapa District

mm thick for wearing coat

Slab -240mm thick

70

130
150

170
225
gineer, Asst. Exe Engineer,
vision , P.I.U. Sub Division,
Mydukur
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of
Pulivendula (M) in YSR Kadapa District
Construction of 2-00 m Span - Slab Culvert

20
20
20

40

16
0
50
2
0
0

WINGS PLAN OF 2.00 M SPAN SLAB CULVERT

Dy. Exe. Engineer, Asst. Exe. Engineer,


P.I.U. Sub-Division , P.I.U. Sub Division,
Mydukur Mydukur
Sub Estimate
Name of work: Providing BT to the road from Nemmaladinne to Vellala via Rajupalem (M) in YSR Kadapa
District

Name of the sub Work : Construction of 1m span RCC slab culvert (5 Nos) at km 0/3, 2/6, 3/2, 3/220, 4/2
Measurments
S.No Description No Quantity Rate Amount
L B D
1 Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a
lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304
MORTH ,including overhead charges & Contractors profit but excluding VAT and
seigniorage charges - For Foundations

For Abutments 1 x 2 8.40 4.00 1.40 94.08


For Wing walls 1 x 4 2.00 1.80 1.40 20.16
Total Quantity 114.24 94.90 10841
Cum
2 Providing concrete for plain concrete M 10 grade in open foundations using 40
mm nominal size Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14 days complete
as per drawings and technical specifications Clause 802, 803, 1202 & 1203

Levelling course

For Abutments 1 x 2 8.40 2.00 0.20 6.72

For Wing walls 1 x 4 2.00 1.80 0.20 2.88


Total Quantity 9.60 3423.80 32868
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically
mixed in foundation complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH ,including overhead charges & Contractors profit but excluding VAT and
seigniorage charges below GL

Footings
For Abutments
1 st step 1 x 2 8.10 1.70 0.30 8.26
2 nd step 1 x 2 7.80 1.50 0.30 7.02
3 rd step 1 x 2 7.50 1.30 0.30 5.85
Wing walls '1st footing 1 x 4 2.45 1.325 0.90 11.69
(1.5+1.15)/2 32.82 3784.50 124202
Cum

Page 107 of 296


Measurments
S.No Description No Quantity Rate Amount
L B D
4 Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically
mixed in foundation complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH ,including overhead charges & Contractors profit but excluding VAT and
seigniorage charges - above GL

Abutments
Abutments 1 x 2 7.50 0.85 1.00 12.75
(1.0+0.7)/2 = 0.85
Wing walls 1 x 4 2.45 0.700 1.00 6.86

(1.0+0.4)/2 = 0.70

Total Quantity 19.61 4002.90 78497


Cum
5 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal
mechanically mixed in substructure complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500,
1700 & 2200 MORTH ,including overhead charges & Contractors profit but
excluding VAT and seigniorage charges (upto 5m height)

Bed blocks
Bed blocks 1 x 2 7.50 0.70 0.20 2.10
Dirt walls 1 x 2 7.50 0.40 0.21 1.26
3.36 5435.70 18264

Cum
6 Providing and laying reinforced cement concrete M25 grade (Design Mix) using
20 & 10mm metal mechanically mixed in superstructure as per drawing and
technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500,
1600 & 1700 MORTH ,including overhead charges & Contractors profit but
excluding VAT and seigniorage chargesupto 5m height. - For Super Structure
(Deck slab)

Deck slab 1 x 1 1.60 7.50 0.21 2.52


2.52 5914.00 14903
Cum
7 Providing and laying cement concrete wearing course M 30 (Design Mix) grade
using 20 & 10mm metal mechanically mixed excluding reinforcement complete
as per drawing and technical specifications Clauses 800 and 1206.3 MORD and
2702 MORTH ,including overhead charges & Contractors profit but excluding
VAT and seigniorage charges -

Over Deck slab 1 x 3 1.60 7.50 0.075 2.70


2.70 5180.90 13988
Cum

Page 108 of 296


Measurments
S.No Description No Quantity Rate Amount
L B D
8 Providing weep holes in brick masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending
through the full width of the structures with slope of 1(V):20(H) towards
drawing face complete as per drawing

3 x 7 1.00 21.00
21.00 841.90 17680
Rmt
9 Cost, supply and fixing of Bituminous Mastic pad 12.7 mm including cost and
conveyance and all labour charges etc., complete

3 x 1 7.50 0.21 4.73


4.73 541.20 2560
Sqm
10 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure
complete as per drawings and technical specification Clauses 1002, 1005, 1010
& 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage,

For Bed blocks 0.36


0.36 54329.40 19559
MT
11 Supplying, fitting, and placing HYSD bar reinforcement in superstructure
complete as per drawing and technical specifications Clauses 1002, 1010 and
1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and
wastage, where they are not welding

For Deck slab 0.400


0.400 55766.10 22306
MT
Total 355669

Sub estimate is technically approved for Rs.3,54,140/- (Rupees Three lakhsfifty four thousand one hundered and
forty only)

O/c
So4 PA SE, PR, KDP

Page 109 of 296


COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M


in YSR Kadapa District

Construction of 600mm pipe culvert at km 2/6-2/8,3/0-3/2,3/6-3/8,3/8-4/0 (4Nos)

Sl.No. Description of items Number L B D Unit Quantity Rate (Rs.)

1 2 3 4 5 6 7 8 9
1 Earthwork excavation for foundation of structures upto 3 m
depth as per drawing and technical specification Clause
1104 including setting out,Construction of shoring and
bracing,removal of stumps and other deleterious matter
,dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per MORD
specification 300 & 1100

For head walls 1 x 2 4.30 1.40 1.20 Cu.m 14.45

for Pipe portion 1 x 1 6.20 1.40 1.05 Cu.m 9.11

Cu.m 23.56 94.90


2 PCC M10 (1:3:6 nominal mix) in levelling course below
open foundation of Head walls as per drawings & Technical
Specification 802,803,1202 & 1203 and MORDClause 1109

For head walls 1 x 2 4.30 1.40 0.20 Cu.m 2.41

for Pipe portion 1 x 1 6.20 1.40 0.20 Cu.m 1.74

1 cum 4.14 3423.80


3 Plain cement concrete M15(1:2.5:5 nominal mix) for Sub
structure of head walls complete excluding plastering as
per drawing and technical specification Clauses
802,804,805,806,1202 and 1204

Alround pipe 1x 1 6.20 1.200 0.95 Cu.m 7.07

Deduct for Pipe portion 0.8 x 1 -6.20 0.75 0.75 Cu.m -2.79

wing walls
1.00 x 2 4.00 0.80 2.00 Cu.m 12.80
(1.2+0.40)/2
parapet 1.00 x 2 4.00 0.30 0.30 Cu.m 0.72

Deduct for Pipe portion 0.80 x 2 -0.80 0.75 0.75 Cu.m -0.72

1 cum 17.08 3784.50


4 Providing and Laying 600 mm reinforced cement concrete
Pipe NP3 for culverts on first class bedding of granular
material in single row including fixing collor with cement
mortor 1:2 but excluding excavation,protection
works,backfilling,concrete and masonry works in head
walls and parapets clause 1106

3 2.5 1 RM 7.50 3427.40

Total

GRAND TOTAL 4.00 Nos

c DEPUTY EXE ENGINEER ASST.EXE. ENGINEER


PIU,SUB DIVISION, MYDUKUR PIU,SUB DIVISION, MYDUKUR

SUPERINTENDING
EXECUTIVE ENGINEER
ENGINEER

P.R.CIRCLE , KADAPA PIU DIVISION , KADAPA


R CONSTRUCTION OF CROSS DRAINAGE WORKS

from Krishnamgaripalli to Ahobilapuram of Pulivendula (M)

rt at km 2/6-2/8,3/0-3/2,3/6-3/8,3/8-4/0 (4Nos)

Amount
(Rs.)
10

2236

14175

64639
25706

106756

427023

ASST.EXE. ENGINEER
PIU,SUB DIVISION, MYDUKUR

EXECUTIVE ENGINEER

PIU DIVISION , KADAPA


SUB ESTIMATE FOR ROAD FURNITURE
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kada
District
Measurement
S.No Description Quantity Rate
No L B D
1 2 3 4 5 6 7 8
1 Reinforced cement concrete M15 grade kilometre stone/local stone of standard
design as per IRC:8 fixing in position including painting and printing, etc as per
drawing and Technical Specification Clause 1703 MORD / 804 MORTH excluding GST
& seinorage charges

Ordinary KM Stone 1 8.00 1836.00 / No.

200M Stone 1 28.00 543.80 / No.

2 Providing & fixing of typical PMGSY informatory sign board as per MORD
secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate
duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate
will be welded with MS angle iron frame of lower most plate and flate iron frame of
middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly
embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below
ground level. The top most diamond plate will be welded to middle plate by
47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both
sides. Lettering and paining of superior quality in required shede and colour. All
sections of framed posts and sheet tube will be painted with primer and two coats of
epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD excluding
GST & seineorage charges

1 2.00 9380.30 / No.


3 Providing and erecting direction and place identifications of semi reflective sign
boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly
stove enameled paint in white colour in front and grey colour on back with red
reflective border of 70 mm width and required message, letters, figures with
reflective engineering grade tape as per MORD specifications of required shade and
colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050
mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back
firmly fixed to the ground by means of properly designed foundation with M15 grade
cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per
drawings and Technical Specification Clause 1701 MORD excluding GST & seinorage
charges up to 0.9 sqm size board

1 3.00 2051.80 / No.


4 Providing and fixing of semi-reflective cautionery, mandatory and informatory
boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in
white colour in front and grey colour on back with red reflective boarder of 65mm
width and required letters and figures with reflective engineering grade tape as per
clause 1701.3.9 of MORD for rural roads specification of required shade and colour
supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly
strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by
means of properly designed foundations with M-15 grade CC 450x450x600 mm ,
600mm below ground level as per approved drawings and technical specification
Clause 1701.2.2 of MORD excluding GST& seineorage with 600X 600 mm size MS
sheet

1 40.00 1568.20 / No.


5 Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick
including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of
surface applied glass beads for providing centerline marking 300 cms length and
10cm width with a gap of 450 cms including cost and convenyace of all materials
equipment machinary and labour with all leads and lifts loading and unloading
charges necessary for sucessful completion of work as directed by the Engineer-in-
Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause
803 of MOST specification for roads and bridge works and also confirming to IRC 35
-1997

For road marking with


thermoplastic compund
on both sides. 2 7100 0.1 1420.00 702.00 /Sqm

At Speed breakers both


sides(zebra lines with
length of 3.00 x0.50m
width 4 nos ) 4 3 0.5 6.00 702.00 /Sqm

6 Construction of speed breaker with flexible pavement with an minimum width of


3.00 with an parabolic hump of 100 mm at centre at school zones etc complete.

For speed breaker


(rectangular portion) 4 3.75 2.50 0.075 2.81
WMM
At Speed breakers
triangular portion WMM 8 3.75 1.25 0.04 1.50

4.31 1635.31 /Cum


For speed breaker
(rectangular portion)
prime coat+tack coat 4 3.75 2.50 37.50

At Speed breakers
triangular portion prime
coat+tack coat 8 3.75 1.25 37.50

75.00 57.17 /Sqm


For speed breaker
(rectangular portion)
SDBC 25 mm thick layer 4 3.75 2.50 0.025 0.94

At Speed breakers
triangular portion SDBC
25 mm thick layer 8 3.75 1.25 0.01 0.49

1.43 7840.70 /Cum


7 Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of
polycarbonate and ABS moulded body and reflective panels with micro prismatic
lens capable of providing total internal reflection of the light entering the lens face
and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H
and complying to Specifications of Category A of MORTH Circular No.
RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not
exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm
on each side and the slope to the base shall be 35 +/- 5 degree. The strength of
detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2
mm and height not less than 30+/- 2 mm) from the body is to be a minimum value
of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go
inside, without nails and using epoxy resin based adhesive as per manufacturer’s
recommendation and complete as directed by the Engineer-in-Charge incl Over head
charges & Contractors profit but excl.GST.

At Speed breakers both


4 2x4 32.00
sides
Along the road edges @ 1x2 705 1410
Curves
1442.00 316.00 1 No
Total

DY. EXECUTIVE ENGINEER, ASSISTANT EXE ENGINEER,


PRI SD PULIVENDULA PRI SD PULIVENDULA

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATI RAJ, KADAPA PR DIVISION Jammalamadugu
RE
Pulivendula (M) in YSR Kadapa

Amount

14688

15226

18761

6155

62728
996840

4212

7048

4288

11212
455672
1596830

ANT EXE ENGINEER,


SD PULIVENDULA

CUTIVE ENGINEER,
SION Jammalamadugu
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YS
Kadapa District

Construction of 1V X 6m span RCC slab culvert - 1 No.s in 2/880-2/890 KM


S.N Description of items Number L B D Unit Qty Rate

1 2 3 4 5 6 7 8 9

1 Earthwork in excavation for structures as per drawing and technical specifications


Clause 305.1 including setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding GST.

For abutments including 1 x 1 9.10 9.80 2.40 Cu.m 214.03


vent portion
For wing walls 1 x 4 3.80 2.70 2.70 Cu.m 110.81

Cu.m 324.84 94.90

2 Filling in foundation trenches for Pipe bedding with Sand as per drawing and
technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead
charges & Contractors profit but excluding GST and seigniorage charges.

For abutments including 1 x 1 9.10 9.80 0.30 Cu.m 26.75


vent portion
For wing walls 1 x 4 3.80 2.70 0.30 Cu.m 12.31

Cu.m 39.06 520.90

3 Providing concrete for plain concrete M 10 grade in open foundations using 40


mm nominal size Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14 days complete as per
drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but
excluding GST.

For abutments including 1 x 1 9.10 9.80 0.30 Cu.m 26.75


vent portion
For wing walls 1 x 4 3.80 2.70 0.30 Cu.m 12.31

Cu.m 39.07 3423.80

4 Providing concrete for plain concrete M 15 grade in open foundations using


40,20 & 10mm nominal size Graded hard stone aggregate, mechanically mixed,
placed in foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges &
Contractors profit but excluding GST.

For abutments including 1 x 1 8.90 2.00 1.80 32.04


vent portion
above bed level 1 x 1 7.80 1.15 1.80 16.15

For wing walls 1 x 4 3.80 2.00 1.80 54.72


above bed level 1 x 4 4.50 0.54 0.78 7.51

Cu.m 102.91 3784.50

5 Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in Substructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding GST upto 5m height.

Bed bocks over 1x 2 7.50 0.70 0.30 3.15


abutments
Dirt wall 1x 2 7.50 0.30 0.59 2.67

Cu.m 5.82 5435.70

5 Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding GST upto 5m height.

for deck slab 1x 1 7.50 6.80 0.48 24.48

Parapets 1x 2 7.50 0.30 0.60 2.70

Cu.m 27.18 5914.00

6 Providing and laying cement concrete wearing course M 30 (Design Mix)


grade using 20 & 10mm metal mechanically mixed excluding
reinforcement complete as per drawing and technical specifications
Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding cost of steel and GST.

for wearing course 1x 1 7.50 7.50 0.075 Cu.m 4.22 5180.90

7 Providing weep holes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall with 100
mm dia AC pipe extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face complete as per
drawing

4x 2 9.00 No 72.00 841.90

8 Cost, supply and fixing of Bituminous Mastic pad 25.4 mm


including cost and conveyance and all labour charges etc.,
complete

2 x 1 7.50 0.48 7.20


Sqm 7.20 1114.90
9 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in
substructure complete as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200
MORTH for Bars below 36 mm dia including over laps and
wastage,where they are not welded ,including overhead charges &
Contractors profit but excluding GST
For Bed blocks & Dirtwall
0.50
MT 0.50 54329
8 Supplying, fitting, and placing HYSD bar reinforcement in
superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36
mm dia including over laps and wastage, where they are not welded
,including overhead charges & Contractors profit but excluding GST.

for deck slab & Parapets MT 5.00 55766.10

TOTAL:

DY.EXECUTIVE ENGINEER ASST EXE ENGINEER

PRI SD PULIVENDULA PRI SD PULIVENDULA

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER

PANCHAYATI RAJ, KADAPA PR DIVISION Jammalamadugu


CONSTRUCTION OF CROSS DRAINAGE WORKS
m Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR
Kadapa District

span RCC slab culvert - 1 No.s in 2/880-2/890 KM


Amount

10

30827

20346

133754
389463

31615

160743

21863

60617

8027
27165

278831

1163251
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YS
Kadapa District

Construction of 2V X 6m span RCC slab culvert - 1 No.s in 5/8-6/0 KM


S.N Description of items Number L B D Unit Qty Rate

1 2 3 4 5 6 7 8 9

1 Earthwork in excavation for structures as per drawing and technical specifications


Clause 305.1 including setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding GST.

For Raft 1 x 1 8.20 9.10 1.50 Cu.m 111.93

For wings 1 x 4 8.00 2.10 1.50 Cu.m 100.80

Cu.m 212.73 94.90

2 Providing concrete for plain concrete M 10 grade in open foundations using 40


mm nominal size Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14 days complete as per
drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but
excluding GST.

For Raft 1 x 1 8.20 9.10 0.10 7.46

For wings 1 x 4 10.00 2.10 0.10 8.40

Cu.m 15.86 3423.80

3 Providing concrete for plain concrete M 15 grade in open foundations using


40,20 & 10mm nominal size Graded hard stone aggregate, mechanically mixed,
placed in foundation and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications Clause 802, 803, 1202 &
1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges &
Contractors profit but excluding GST.

For Raft 1 x 1 8.20 9.10 0.20 14.92

For wings 1 x 4 10.00 2.10 0.20 16.80

Cu.m 31.72 3784.50

3 Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically
mixed in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH ,including overhead charges & Contractors profit but excluding GST.

for abutments 1x 2 8.70 2.000 0.40 13.92

1x 2 8.30 1.800 0.40 11.95

1x 2 7.90 1.600 0.40 10.11

(1.3+0.7)/2 1x 2 7.50 1.000 1.70 25.50


For wings 1x 4 10.00 1.900 0.40 30.40

1x 4 10.00 1.700 0.40 27.20

1x 4 10.00 1.500 0.40 24.00

(0.40+1.2)/2 1x 4 10.00 0.800 2.40 76.80

Cu.m 219.88 4002.90

4 Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in Substructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.

Bed bocks over 1x 2 7.50 0.70 0.20 2.10


abutments
Dirt wall 1x 2 7.50 0.30 0.48 2.16

Cu.m 4.26 5435.70

5 Providing and laying reinforced cement concrete M25 grade (Design Mix)
using 20 & 10mm metal mechanically mixed in superstructure as per
drawing and technical specifications Clauses 800, 1205.4 and 1205.5
MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges
& Contractors profit but excluding VAT upto 5m height.

for deck slab 1x 1 7.50 6.80 0.48 24.48

Parapets 1x 2 7.40 0.30 0.60 2.66

Cu.m 27.14 5914.00

6 Providing and laying cement concrete wearing course M 30 (Design Mix)


grade using 20 & 10mm metal mechanically mixed excluding
reinforcement complete as per drawing and technical specifications
Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding cost of steel and VAT.

for wearing course 1x 1 7.40 7.50 0.075 Cu.m 4.16 5180.90

7 Providing weep holes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall with 100
mm dia AC pipe extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face complete as per
drawing

4x 2 9.00 No 72.00 841.90

8 Cost, supply and fixing of Bituminous Mastic pad 25.4 mm


including cost and conveyance and all labour charges etc.,
complete

2 x 1 7.50 0.48 7.20


Sqm 7.20 1114.90
9 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in
substructure complete as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200
MORTH for Bars below 36 mm dia including over laps and
wastage,where they are not welded ,including overhead charges &
Contractors profit but excluding GST

For Bed blocks & Dirtwall


0.50
MT 0.50 54329
8 Supplying, fitting, and placing HYSD bar reinforcement in
superstructure complete as per drawing and technical specifications
Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36
mm dia including over laps and wastage, where they are not welded
,including overhead charges & Contractors profit but excluding GST.

for deck slab & Parapets MT 3.00 55766.10

TOTAL:

DY.EXECUTIVE ENGINEER ASST EXE ENGINEER

PIU SUB DIVISION, MYDUKUR PIU SUB DIVISION, MYDUKUR

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER

PANCHAYATI RAJ, KADAPA PIU, KADAPA


CONSTRUCTION OF CROSS DRAINAGE WORKS
m Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR
Kadapa District

6m span RCC slab culvert - 1 No.s in 5/8-6/0 KM


Amount

10

20188

54308

120044
880158

23156

160530

21553

60617

8027
27165

167298

1543044
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula


YSR Kadapa District

Construction of 5 Rows 1000 mm dia Vented Causeway in KM 0/740-0/820


Sl.N Description of Number L B D Unit Quantity Rate
o. items (Rs.)
1 2 3 4 5 6 7 8 9

1 Earthwork excavation for foundation of structures upto 3 m


depth as per drawing and technical specification Clause
1104 including setting out,Construction of shoring and
bracing,removal of stumps and other deleterious matter
,dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per MORD
specification 300 & 1100

For Bodywalls 2 x 1 Cu.m 46.08


(Horizantal portion
U/S&D/s 8.00 1.60 1.80
2 x 2 Cu.m 201.60
For Bodywalls (Sloped
(1.9+1.
portion U/S&D/s
16.00 6)/2 1.80
2 x 1 Cu.m 32.15
for Crosswalls 4.70 1.90 1.80
for Pipe portion 1 x 1 Cu.m 11.28
8.00 4.70 0.30
Cu.m 291.11 94.90

2 PCC M10 (1:3:6 nominal mix) in levelling course below


open foundation of Head walls as per drawings & Technical
Specification 802,803,1202 & 1203 and MORDClause 1109

For Bodywalls 2 x 1 8 1.6 0.3 1 cum 7.68


(Horizantal portion
U/S&D/s
For Bodywalls (Sloped 2 x 2 16 (1.9+1. 0.3 1 cum 33.60
portion U/S&D/s 6)/2

for Crosswalls 2 x 1 4.7 1.9 0.3 1 cum 5.36

for Pipe portion 1 x 1 8 4.7 0.15 1 cum 5.64

Causeway 2 x 1 16.00 6.70 0.10 1 cum 21.44

for apron toe wall U/S 1 x 1 40.00 0.60 0.15 Cu.m 3.60

for apron toe wall D/S 1 x 1 40.00 0.60 0.15 Cu.m 3.60

for apron U/S 1 x 1 40.00 2.40 0.15 Cu.m 14.40

for apron D/S 1 x 1 40.00 2.40 0.15 Cu.m 14.40

1 cum 109.72 3423.80


1 2 3 4 5 6 7 8 9

3 Plain cement concrete M15(1:2.5:5 nominal mix) for Sub


structure of head walls complete excluding plastering as
per drawing and technical specification Clauses
802,804,805,806,1202 and 1204

For Bodywalls 2 x 1 8.00 0.80 2.20 1cum 28.16


(Horizantal portion
U/S&D/s (1.2+0.4)/2
Deduct for Pipe 5*0. x 1 -1.20 1.20 0.60 1 cum -3.46
portion (0.8+0.4)/2 8

For Bodywalls (Sloped 2 x 2 16.00 0.88 (3+2.2 1 cum 145.60


portion U/S&D/s )/2

for Crosswalls 2 x 1 (5.1+ (1.5+0. 3.00 1 cum 33.63


6.7)/2 4)/2

For encasing pipes 1 x 1 8.00 (5.9+6. 1.00 1 cum 50.40


7)/2
deduct pipe portion 5*0. x 1 -1.20 1.20 (5.9+6 1 cum -36.29
8 .7)/2
for apron toe wall U/S 1 x 1 40.00 0.40 0.60 Cu.m 9.60

for apron toe wall D/S 1 x 1 40.00 0.40 0.60 Cu.m 9.60

237.24 3784.50

Plain cement concrete M 20 grade (Design mix) using


40,20 & 10mm metal (HBG) mechanically mixed in
foundations complete as per drawings and technical
specification Clauses 802, 804, 805, 806, 807, 1202 and
1204 MORD and 1500, 1700 & 2200 MORTH ,including
contractors profit & Over head charges, GST and
Seigneorage etc., complete-

for apron U/S 1 x 1 40.00 3.00 0.10 Cu.m 12.00


for apron D/S 1 x 1 40.00 3.00 0.10 Cu.m 12.00
24.00 4739.10
5 Providing and Laying 1000mm reinforced cement concrete
Pipe NP3 for culverts on first class bedding of granular
material in single row including fixing collor with cement
mortor 1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in head walls and
parapets clause 1106

5 x 3 2.5 1 RM 37.50 8326.70


1 2 3 4 5 6 7 8 9

Construction of un-reinforced, dowel jointed at expansion


and construction joint only, plain cement concrete
pavement, thickness as per design, over a prepared sub
base, with 43 grade cement or any other type as per
Clause 1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of
not less than 0.2 cum capacity and appropeiate weigh
batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125
For Causeway
mictron portion 1 film,xwedges,
thick polythene 1 40 7.5 including
steel plates 0.2 1cum 60.00 5286.08
levelling the formwork as per drawing), spreading the
concrete withof
Construction sholvels,
RCC guiderakes, compacted
posts of 250 mm using
dia needle,
M
scareed
20 gradeand plate vibrators
cast-in-situ with 20andmmfinished
nominalinsize
continuous
operation including
aggregate provision
(HBG), true to line of contraction
and and expansion,
grade, tolerance
construction
of vertical RCCjoints,
postsapplying debonding
not to exceed strips,
1 in 500 as primer,
per
sealant, dowel
drawing bars, near
and Technical approaches
Specification to bridge
Clause / culvert
1608.2
and construction
including joints,
contractors admixtures
profit as approved,
& Over head charges, curing of
concrete
GST slabs for 14- etc.,
and Seigneorage days,complete
curing compound (where
specified) and water finishing to lines and grade as per
drawing and Technical Specification Clause 1501
MORD.including overhead charges & Contractors profit but
excluding GST and seinorage
1 x 2 20 1No 40.00 497.80

TOTAL:

GRAND TOTAL 1 Nos

c DEPUTY EXE ENGINEER ASST.EXE. ENGINEER


PRI SD PULIVENDULA PRI SD PULIVENDULA

SUPERINTENDING
EXECUTIVE ENGINEER
ENGINEER

P.R.CIRCLE , KADAPA PR DIVISION Jammalamadugu


OR CONSTRUCTION OF CROSS DRAINAGE WORKS

d from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in

dia Vented Causeway in KM 0/740-0/820


Amount
(Rs.)
10

27626

375659
10

897835

113738

312251
10

317165

19912

2064186

2064186

ASST.EXE. ENGINEER
PRI SD PULIVENDULA

EXECUTIVE ENGINEER

PR DIVISION Jammalamadugu
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendu


in YSR Kadapa District

Construction of 1000 mm dia pipe culvert in Km 0/000, 0/620, 1/115, 1/360, 1/507, 1/900, 3
3/380, 3/500, 3/840, 4/030, 4/320, 4/465, 4/630, 4/800, 4/940, 6/350, 6/385, 6/730, 6/820, 7
-Total 21 Nos
Sl.N Description of Number L B D Unit Quantity Rate
o. items (Rs.)
1 2 3 4 5 6 7 8 9

1 Earthwork excavation for foundation of structures upto 3 m


depth as per drawing and technical specification Clause
1104 including setting out,Construction of shoring and
bracing,removal of stumps and other deleterious matter
,dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per MORD
specification 300 & 1100

for Wing walls 1 x 2 10.50 1.50 1.70 Cu.m 53.55

for Pipe portion 1 x 1 6.20 2.10 1.55 Cu.m 20.18

Cu.m 73.73 94.90

2 PCC M10 (1:3:6 nominal mix) in levelling course below


open foundation of Head walls as per drawings & Technical
Specification 802,803,1202 & 1203 and MORDClause 1109

For head walls 1 x 2 10.50 1.50 0.20 1 cum 6.30

for Pipe portion 1 x 1 6.20 2.10 0.20 1 cum 2.60

1 cum 8.90 3423.80

3 Plain cement concrete M15(1:2.5:5 nominal mix) for Sub


structure of head walls complete excluding plastering as
per drawing and technical specification Clauses
802,804,805,806,1202 and 1204

Alround pipe 1 x 1 6.20 1.80 1.35 1cum 15.07

Deduct for Pipe 0.8 x 1 -6.20 1.15 1.15 1 cum -6.56


portion

wing 1 x 2 10.00 0.80 2.40 1 cum 38.40


walls(1.2+0.40)/2
deduct pipe portion 0.8 x 2 -0.80 1.15 1.15 1 cum -1.69

for parapet 1 2 10.00 0.30 0.30 1 cum 1.80

47.02 3784.50
1 2 3 4 5 6 7 8 9

4 Providing and Laying 1000mm reinforced cement concrete


Pipe NP3 for culverts on first class bedding of granular
material in single row including fixing collor with cement
mortor 1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in head walls and
parapets clause 1106

1 x 3 2.5 1 RM 7.50 8326.70

5 Construction of RCC guide posts of 250 mm dia M 20 grade


cast-in-situ with 20 mm nominal size aggregate (HBG), true
to line and grade, tolerance of vertical RCC posts not to
exceed 1 in 500 as per drawing and Technical Specification
Clause 1608.2 including contractors profit & Over head
charges, GST and Seigneorage etc., complete

1 x 2 4 No's 8.00 497.80

TOTAL:

GRAND TOTAL 21 Nos

c DEPUTY EXE ENGINEER ASST.EXE. ENGINEER


PRI SD PULIVENDULA PRI SD PULIVENDULA

SUPERINTENDING
EXECUTIVE ENGINEER
ENGINEER

P.R.CIRCLE , KADAPA PR DIVISION Jammalamadugu


OR CONSTRUCTION OF CROSS DRAINAGE WORKS

ad from Krishnamgaripalli to Ahobilapuram of Pulivendula (M)

e culvert in Km 0/000, 0/620, 1/115, 1/360, 1/507, 1/900, 3/300,


, 4/465, 4/630, 4/800, 4/940, 6/350, 6/385, 6/730, 6/820, 7/043

Amount
(Rs.)
10

6997

30472

177947
10

62450

3982

281848

281848

ASST.EXE. ENGINEER
PRI SD PULIVENDULA

EXECUTIVE ENGINEER

PR DIVISION Jammalamadugu
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M
in YSR Kadapa District

Design of 1V X 6.00M Slab Culverts


Km
a Average Catchment area of local Stream : 90.00
364217.4
0.3642
b Maximum Discharge Q = C(M) ¾ using Dickens formula
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.

Therefore Q = 11 x 0.3642 ^3/4 5.157

c Assumed velocity of flow is (V) = 1.00

d Ventage area required = Q/V = 5.157 5.157


1.000

e Hence provide 1 vents of 6 m Span RCC Slab culverts

f Area Provided = 1 No xX6.0 M x 1.00 M = 6.00

Hence the ventage area provided is greater than the requirement.


Hence safe.
Provide 1 Vent of 2.0M Span RCC Slab Culvert

Executive Engineer Dy.Exe.Engineer Asst. Exe Engineer,


P.R.I.,Division,JAMMALAMADUGU PRI SD PRI SD
Pulivendula Pulivendula

Superintending Engineer,
PR Circle : YSR Kadapa
m of Pulivendula (M)

Acres
Sqm
Sq.Km.

Cumecs.

Mtrs/Sec.

Sqm.

Sqm.

Exe Engineer,
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in Y

Construction of 6-00 m Span - Slab Culvert

V.C.C. -M30- 75mm thick for wearin

V.R.C.C. M25 for Slab -480mm thick

V.C.C. M 15

740

Parapet
40
48

20 70

6.00
238

170

G.L. 10 130 20
160
45 0
45 180 20
165 45 20
200
190
30
620
620

910

Note: All dimensions without units are in Cms. CROSS SECTION C.C. -M10

Superintending Engineer, Executive Engineer , Dy. Exe. Engineer,


PR Circle : YSR Dist. PR Division Jammalamadugu PRI SD Pulivendula
KADAPA
(M) in YSR Kadapa District

mm thick for wearing coat

Slab -480mm thick

70

160
180

200
225
gineer, Asst. Exe Engineer,
endula PRI SD Pulivendula
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivend
in YSR Kadapa District
Construction of 6-00 m Span - Slab Culvert

Parapet

600
91
0

75
0

Parapet

70
PLAN OF 6.00 M SPAN SLAB CULVERT 160

180
200
910
910

Superintending EngineerExecutive Engineer , Dy. Exe. Engineer, Asst. Exe. Engineer,


PR Circle : YSR Dist. PR DIVISION< JMD PRI SD Pulivendula PRI SD Pulivendula
KADAPA
Pulivendula (M)
83
0
75

79
0

870
gineer,
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of
Pulivendula (M) in YSR Kadapa District
Construction of 6-00 m Span - Slab Culvert

20
20
20

40

18
0
80
1
0
0
0
WINGS PLAN OF 6.00 M SPAN SLAB CULVERT

Dy. Exe. Engineer, Asst. Exe. Engineer,


P.I.U. Sub-Division , P.I.U. Sub Division,
Mydukur Mydukur
COST ESTIMATE FOR CONSTRUCTION OF PROTECTION WALL
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR
Kadapa District

Construction of Protection Wall in Km 2/635-2/650

Sl.No. Description of L B D Unit Quantity Rate (Rs.)


items
Number
1 2 3 4 5 6 7 8
1 Earthwork excavation for foundation of structures upto 3 m
depth as per drawing and technical specification Clause 1104
including setting out,Construction of shoring and
bracing,removal of stumps and other deleterious matter
,dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per MORD specification 300 &
1100

for Protection
Wall
1 x 1 15.00 1.30 1.00 Cu.m 19.50
Cu.m 19.50 94.90
2 PCC M10 (1:3:6 nominal mix) in levelling course below open
foundation of Head walls as per drawings & Technical
Specification 802,803,1202 & 1203 and MORDClause 1109

for Protection
Wall

1x 2 15.00 1.30 0.15 1 cum 5.85


1 cum 5.85 3423.80
3 Plain cement concrete M15(1:2.5:5 nominal mix) for Sub
structure of head walls complete excluding plastering as per
drawing and technical specification Clauses
802,804,805,806,1202 and 1204
for Protection
Wall
(1.00+0.30)/
1x 2 15.00 2 2.10 1cum 40.95
40.95 3784.50
TOTAL

DY. EXE. ENGINEER ASST.EXE. ENGINEER


PIU,SUB DIVISION, MYDUKUR PIU,SUB DIVISION, MYDUKUR

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


P.R.CIRCLE , KADAPA PIU DIVISION , KADAPA
ivendula (M) in YSR

Amount
(Rs.)
9

1851

20029

154975
176855

E. ENGINEER
ISION, MYDUKUR

VE ENGINEER
SION , KADAPA
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M)
in YSR Kadapa District

Sub Work : Repairs to Existing culverts in km 0/8-1/0


S.N Description of items Number L B D Unit Qty Rate
1 Dismantling of cement concrete pavement by mechanical
means using pneumatic tools, breaking to pieces not
exceeding 0.02 cum in volume and stock piling at
designated locations and disposal of dismantled materials
up to a lead of 1000 metres, stacking serviceable and
unserviceable materials separately

In Km 0/8-1/0 1 x 2 5.30 0.45 1.00 4.77


Cu.m 4.77 738.00
2 Plain cement concrete M15(1:2.5:5 nominal mix) for Sub
structure of head walls complete excluding plastering as per
drawing and technical specification Clauses
802,804,805,806,1202 and 1204

In Km 0/8-1/0 1x 2 5.30 0.45 1.000 Cu.m 4.77

4.77 3784.50

TOTAL:

c DEPUTY EXE ENGINEER ASST.EXE. ENGINEER


PIU,SUB DIVISION, MYDUKUR PIU,SUB DIVISION, MYDUKUR

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER

P.R.CIRCLE , KADAPA PIU DIVISION , KADAPA


ORKS
of Pulivendula (M)

Amount

3520

18052

21572

E. ENGINEER
ISION, MYDUKUR

VE ENGINEER

ION , KADAPA
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M)
YSR Kadapa District

Sub Work : Providing Guide posts along the irrigation canal


S.N Description of items Number L B D Unit Qty Rate
1 Construction of RCC guide posts of 250 mm dia M 20 grade
cast-in-situ with 20 mm nominal size aggregate (HBG), true to
line and grade, tolerance of vertical RCC posts not to exceed 1
in 500 as per drawing and Technical Specification Clause
1608.2 including contractors profit & Over head charges, GST
and Seigneorage etc., complete

In Km 4/350 - 5/300 1 x 1 317 317.00


No 317.00 497.80
TOTAL:

c DEPUTY EXE ENGINEER ASST.EXE. ENGINEER


PIU,SUB DIVISION, MYDUKUR PIU,SUB DIVISION, MYDUKUR

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER

P.R.CIRCLE , KADAPA PIU DIVISION , KADAPA


RKS
Pulivendula (M) in

Amount

157803
157803

E. ENGINEER
ISION, MYDUKUR

VE ENGINEER

ION , KADAPA
Seigniorage Charges
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Ka
District
S No Description of Work Quantity Unit Description of Total Quantity Seignorage
(Finished item ) Material of Material Charges / Cum
Collected
1 2 3 4 5 6 7
Construction of 1000 mm dia pipe culvert in Nos 21
Km 0/000, 0/620, 1/115, 1/360, 1/507, 1/900,
3/300, 3/380, 3/500, 3/840, 4/030, 4/320,
4/465, 4/630, 4/800, 4/940, 6/350, 6/385,
6/730, 6/820, 7/043 -Total 21 Nos

1 E/W for CD work 52.31 Cum Earth 1098.51 30.00


2 M10 PCC (1:3:6) 6.38 Cum Metal 120.58 75.00
Sand 60.29 50.00
3 M15 PCC 30.94 Cum Metal 519.79 75.00
Sand 311.88 50.00
Construction of 1V X 6m span RCC slab culvert Nos 1
- 1 No.s in 2/880-2/890 KM

1 E/W for CD work 324.84 Cum Earth 324.84 30.00


2 M10 PCC (1:3:6) 39.07 Cum Metal 35.16 75.00
Sand 17.58 50.00
3 M15 PCC 102.91 Cum Metal 82.33 75.00
Sand 39.52 50.00
4 M25 Grade 33.00 Cum Metal 29.70 75.00
Sand 14.85 50.00
5 Wearing course M30 Grade 4.22 Cum Metal 3.80 75.00

Sand 1.90 50.00


Construction of 5 Rows 1000 mm dia Vented Nos 1
Causeway in KM 0/740-0/820

1 E/W for CD work 291.11 Cum Earth 291.11 30.00


2 M10 PCC (1:3:6) 109.72 Cum Metal 98.75 75.00
Sand 49.37 50.00
3 M15 PCC 237.24 Cum Metal 189.79 75.00
Sand 91.10 50.00
4 M20 Grade 24.00 Cum Metal 21.60 75.00
Sand 10.80 50.00
5 M30 Grade 60.00 Cum Metal 54.00 75.00
Sand 27.00 50.00
Road Portion
1 Earth Work 47911.72 Cum Earth 47911.72 30.00
2 GSB Gr.3 4209.00 Cum Metal 5050.80 75.00
3 Shoulders 3965.63 cum Earth 3965.63 30.00
4 WMM 3484.69 cum Metal 4634.64 75.00

Page 159 of 296


5 SDBC 580.77 cum Metal 848.82 75.00
5 M30 Grade 555.00 Cum Metal 499.50 75.00
Sand 249.75 50.00

Road Furniture
1 HM stones 28 No Earth 38.92 30.00
Metal 35.392 75.00
Sand 21.2352 50.00
2 Ordinary Km stone 8 No Earth 22.16 30.00
Metal 24.128 75.00
Sand 14.4768 50.00

3 Information Board 2 No Earth 0.504 30.00


Metal 0.4032 75.00
Sand 0.24192 50.00
4 Cautionary Sign Board 40 No Earth 5.04 30.00
Metal 4.032 75.00
Sand 2.4192 50.00
5 Place identification and 3 No Earth 0.378 30.00
direction board
Metal 0.3024 75.00
Sand 0.18144 50.00

DY. EXECUTIVE ENGINEER, ASSISTANT EXE ENGINEER,


PRI SD Pulivendula PRI SD Pulivendula

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATI RAJ, KADAPA PR Division Jammalamadugu

Page 160 of 296


Seigniorage Charges
Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa
District
Seignorage
Charges Amount

32955.30
9043.50
3014.50
38984.25
15594.00

9745.20
2637.00
879.00
6174.75
1975.92
2227.50
742.50
285.00

95.00

8733.30
7406.25
2468.50
14234.25
4554.96
1620.00
540.00
4050.00
1350.00

1437351.60
378810.00
118968.90
347598.00

Page 161 of 296


63661.50
37462.50
12487.50

1167.60
2654.40
1061.76
664.80
1809.60
723.84

15.12
30.24
12.10
151.20
302.40
120.96
11.34

22.68
9.07
2574407.79
2574408.00

Page 162 of 296


AVERAGE LEAD CHART

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of


Pulivendula (M) in YSR Kadapa District

HBG Machine Sand at


HBG Metal at
Chainage Crushed metal at KUMMARAMPA
RAYALAPURAM
RAYALAPURAM LLI

CT 0.50 0.50 1.50

MR 9.50 9.50 37.50

WM 0.00 0.00 0.00

10.00 10.00 39.00

Average 10.00 10.00 39.00

1 HBG Machine Crushed metal at Rayalapuram

2 Sand at kummarampalli

3 HBG Metal at Rayalapuram

Here by certify that

1 The distance noted here is correct

2 The quarries provided are nearest

3 The material can be easily quarried

EXECUTIVE ENGINEER DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PR Division Jammalamadugu PRI SD Pulivendula PRI SD Pulivendula

SUPERINTENDING ENGINEER
PANCHAYATIRAJ CIRCLE , KADAPA
LEAD CHART (2019-20)

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Machine Loading and Deduct for


Conveyance Deduct 13.165% over Net Lead Blasting
Sl No. Description in Material Name of the Quarry Lead in Km Initial Heads and contract Crushing Unloading
charges profit on LEAD Charges Charges stacking
Charges Charges

1 2 3 4 5 6 7 8 9 10 11 12
FOR ROAD WORKS
1 Selected Earth Local 10.00 55.00 131.80 15.79 116.01 0.00 0.00
2 60-63mm HBG metal Rayalapuram 10.00 399.05 131.80 15.79 116.01 70.00 0.00
IRC, MORTH & MORD
3 50 -55mm HBG Metal Rayalapuram 10.00 434.30 131.80 15.79 116.01 70.00 0.00
IRC, MORTH & MORD
4 40-45mm HBG M/c Metal Rayalapuram 10.00 560.00 131.80 15.79 116.01 70.00 140.00
IRC, MORTH & MORD
5 40-45mm HBG hand broken Metal Rayalapuram 10.00 560.00 131.80 15.79 116.01 70.00 0.00
IRC, MORTH & MORD
6 25-27mm M/c HBG Metal Rayalapuram 10.00 899.05 131.80 15.79 116.01 70.00 224.76
IRC, MORTH & MORD
7 19 - 22mm HBG M/c metal Rayalapuram 10.00 937.15 131.80 15.79 116.01 70.00 234.29
IRC, MORTH & MORD

8 19 - 22mm HBG Hand broken Rayalapuram 10.00 937.15 131.80 15.79 116.01 70.00 0.00
metal
IRC, MORTH & MORD

9 12-14 mm HBG M/c Metal Rayalapuram 10.00 742.85 131.80 15.79 116.01 70.00 185.71
IRC, MORTH & MORD

10 9.5-11.2 mm HBG M/c Metal Rayalapuram 10.00 624.75 131.80 15.79 116.01 70.00 156.19
IRC, MORTH & MORD

Page 164 of 296


11 5-7 mm HBG M/c Metal Rayalapuram 10.00 480.00 131.80 15.79 116.01 70.00 120.00
IRC, MORTH & MORD

12 2.36 - 5 mmHBG M/c Metal Rayalapuram 10.00 293.35 131.80 15.79 116.01 70.00 73.34
IRC, MORTH & MORD
13 BT Emulsion SS 1 (Chennai) dt. Chennai 325.00 45970.00 1072.50
01.12.2018
14 BT Emulsion RS (Chennai) dt. Chennai 325.00 27510.00 1072.50
01.12.2018
15 BT (60/70 grade) (CHENNAI) dt. Chennai 325.00 35050.00 1072.50
01.12.2018
FOR CD WORKS
16 Sand for filling Local 5.00 375.00 75.30 9.02 66.28 0.00 0.00 0.00
17 Sand for Concrete Kummarampalli 39.00 510.00 442.40 53.01 389.39 0.00 0.00
18 Sand for mortar/ plastering Kummarampalli 39.00 510.00 442.40 53.01 389.39 0.00 0.00
19 40 mmHBG M/c Metal-SS5 Rayalapuram 10.00 608.00 131.80 15.79 116.01 70.00 152.00
20 20 mm HBG M/c Metal-SS5 Rayalapuram 10.00 1016.00 131.80 15.79 116.01 70.00 254.00
21 12 mm HBG M/c Metal-SS5 Rayalapuram 10.00 808.00 131.80 15.79 116.01 70.00 202.00
22 10 mm HBG M/c Metal-SS5 Rayalapuram 10.00 680.00 131.80 15.79 116.01 70.00 170.00
23 2.36 mm Below HBG chips (crusher Rayalapuram 10.00 333.00 131.80 15.79 116.01 0.00 0.00
stone dust)
24 1000mm Dia NP3 Class Allagadda 134.00 5227.00 1719.28 Price 32.98
variation=
25 1000mm Dia Collar Allagadda 134.00 961.00 44.40
26 900mm Dia NP3 Class Allagadda 134.00 4284.00 1678.71 Price 25.43
variation=
27 900mm Dia Collar Allagadda 134.00 770.00 32.98
28 600mm Dia NP3 Class Allagadda 134.00 2068.00 788.80 Price 6.50
variation=
29 600mm Dia Collar Allagadda 134.00 385.00 25.43

Page 165 of 296


30 Gravel Local 10.00 113.00 131.80 15.79 116.01 0.00 0.00

Page 166 of 296


31 Filter Media Rayalapuram 10.00 332.00 131.80 15.79 116.01 70.00 83.00
32 Rough stone 300 mm thick Rayalapuram 10.00 156.00 131.80 15.79 116.01 0.00 0.00 120.60
(Revetment) OTG
33 Bond stone 20x20x30 to 45mm (1 Rayalapuram 10.00 3173.33 131.80 15.79 116.01 0.00 0.00 120.60
cum rate)
34 Cement (Jan 2018) 3900.00
35 HYSD Steel Fe 415 (JULY 2018) 42000.00

36 6mm MS rods (JULY 2018) 43000.00


37 Mild/ Structure Steel (JULY 2018) 42000.00

Lead as per lead statement submitted by SE


1) Certified that the HBD metal obtained by Blasting
2) Certified that the Metal below 25 mm Mechine crushing allowed.

3) Certified that the work lies within (a) Municipal limits (or) (b) Agency limits & up to 16 km from all weather road (Yes/ No). no % allowed =

4) Certified that the leads are true and nearer to the site to the best of my Knowledge.
5) Water is to be procured from private source (Y/N) Y

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER, DY. EXECUTIVE ENGINEER ASSISTANT EXE ENGINEER
PANCHAYATI RAJ, KADAPA PR Division Jammalamadugu PRI SD Pulivendula PRI SD Pulivendula

Page 167 of 296


D CHART (2019-20)

Pulivendula (M) in YSR Kadapa District

Total Amount

13

171.01
585.06

620.31

886.01

746.01

1309.82

1357.45

1123.16

1114.57

966.95

Page 168 of 296


786.01

552.70

47042.50

28582.50

36122.50

441.28
899.39
899.39
946.01
1456.01
1196.01
1036.01
449.01

6979.26

1005.40
5988.14

802.98
2863.30

410.43

Page 169 of 296


229.01

Page 170 of 296


601.01
392.61

3409.94

3900.00
42000.00

43000.00
42000.00

% allowed =

ASSISTANT EXE ENGINEER


PRI SD Pulivendula

Page 171 of 296


DATA (ROAD WORK) - SSR 2019-20
Add Municipal/ Agency Allowance 0%
Over heads & Contractor's profit 12.50%
Water (Y/N) Y 77.00 Rate per kL

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa D
S. Index Description of item Unit Qty Rate
No. Code
1 Clearing and Grubbing Road Land
RBR-STCL- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and t
2 girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materia
stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disp
top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . in
contractors profit & Over head charges but excluding , Seigonarage charges & GST

By Machanical Means
In area of non Throny Jungle (Light Jungle)
Unit =10 Sqm
Out put = 1 Hectare
a) Labour
Mate day
Mazdoor (un-skilled) day 4.16 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Dozer D-50 with attachment or suitable machinery for hour 10.00 1546.80
removal of trees & stumps
Tractor with trolley 3t hour 1.00 413.60
Total
c) Over heads & Contractor's profit 12.500%
Rate for hectare
Rate per 1 Sqm = (a+b+c)/10000

2 RBR-EECD- Construction of Embankment with Selected earth Obtained from Borrow pits by Machinery
4
Construction of embankment with Selected earth obtained from borrow pits with all lifts, transporting to sit
spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement o
Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD includin
contractors profit & Over head charges but excluding , Seigonarage charges & GST

Unit = cum
Taking output = 100 cum
a) Labour
Mazdoor (Unskilled) day 1.04 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per Cum 1.67 2791.60
hour
Tipper 5.5cum with 10T capacity hour 4.50 950.30
Dozer D50 for spreading @ 200 cum per hour hour 0.50 1,546.80

172 / 296
Tractor with Grader @ 25 cum per hour hour 4.00 423.60
Water tanker 6 KL capacity hour 2.00 655.20
Vibratory roller 80-100 KN capacity @ 100 cum per hour hour 1.00 2736.20
c) Material
Selected earth cum 100.00 171.01
Water kl 12.00 0.00
Add seignorage charges Cum 100.00 0.00
Basic rate of formation of road with borrow soils per Cum

d) Over heads & Contractor's profit 12.500%


Rate per 100 cums
Rate per cum
3 RBR-SBBS- Granular Sub-base with Well Graded Material (Table 400.1)
1-A (iii)
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material
M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tra
grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with
Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD
.including contractors profit & Over head charges but excluding , Seigonarage charges & GST

For Grading III Material (CBR Value minimum 20)


Unit = cum
Taking output = 300 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 2.40 420.00
Mazdoor (Unskilled) day 8.00 420.00
Add Municipal/ Agency Allowance 0% 4368.00
b) Machinery
Tractor with grader @ 25 cum hour 12.00 423.60
Three wheel 80-100 kN static roller @ 10 cum per hour hour 30.00

OR
Vibratory roller 80-100 kN hour 6.00 2736.20
Tractor with Rotavator 25 cum per hour hour 12.00 423.60
Water tanker 6 kl capacity hour 3.00 655.20
c) Material
Well graded/ Close Graded granular sub-base material as
per Table 400.1
9.5 mm to 4.75 mm @ 66per cent(metal) 237.60 768.55
2.36 mm below @ 34 per cent (stone dust) 122.40 449.01
Water kl 18.00 0.00
Total
Over heads & Contractor's profit 12.500%
Cost for 300cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/300

173 / 296
4 RBR-EECD- Selected Earth Shoulders
15
Construction of Improved sub-grade/Shoulders by providing selected earth having MDD not less than 1.8
with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor gra
prepared surface and compacted at OMC with vibratory roller 80-100 kN to achieve the desired density co
as per IRC Technical Specification Clause 303 MORD by using machinery including all overheads and contr
profit but excluding GST and Seigniorage charges.

Taking out put = 100 cum


a) Labour
Mazdoor (Skilled) day 0.00 420.00
Mazdoor (Un-Skilled) day 1.04 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Tractor with grader @ 25 cum per hour hour 4.00 423.60
Vibratory roller 80-100 kN hour 1.00 2736.20
Dozer D-50 for spreading @ 200 m3 / hour hour 0.50 1546.80
Water tanker 6 kl capacity hour 2.00 655.20

c) Material
Selected earth cum 100.00 171.01
Water Kl 30.00 0.00
Basic rate of Selected earth shoulders for 100 cum
a) Basic rate of Selected earth shoulders cum
c) Over heads & Contractor's profit 12.500%

Rate per cum


5 RBR-SBBS- Wet Mix Macadam
11
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification in
premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by ti
site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with s
wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including l
barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification
406 MORD/ MORTH,including overhead charges & Contractor profit, But excluding GST & Seignorage

By Mechanical Means with 1 km lead


By Machanical Means
A Rural Works
Taking out put = 100 cum
a) Labour
Dresser (skilled) for alignment day 8.00 420.00
Mazdoor (Skilled) day 2.40 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Front end loader 1 cum capacity hour 4.00 1594.70
Wet mix plant (Pug Mill) hour 4.00 1679.70
Tipper or dumper (10 t) Capacity hour 5.00 950.30
Tractor with grader @ 25 cum capacity hour 4.00 423.60
Vibratory Roller 80-100 KN @60cum per hour hour 1.67 2736.20
Water tanker 6kl capacity hour 1.33 655.20
c) Material
174 / 296
Coarse aggregate 45 to 22.4 mm using M/C metal @ 30% cum 39.90 1184.43
(Average of 40-45 mm, 25-27 mm & 19-22 mm metal)

Aggregates 22.4 mm to 2.36 mm using M/C metal @ 40% cum 53.20 955.54
(Average of 19-22mm, 12-14mm, 9.5-11.20 mm, 5-7mm &
2.36-5 mm metal)

Fine aggregate/crushed stone dust 2.36 mm to 75 mm cum 39.90 449.01


micron @ 30%
Water kl 8.00 0.00
Basic rate of WMM for 100Cum
Basic rate of WMM per Cum
e) Over heads & Contractor's profit 12.500%
Rate per cum

6 RBR- Prime Coat


BASC-1 - I Low porosity
a
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base in
cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means
Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead cha
Contractors profit etc., Complete but Excluding GST and seigniorage charges for Prime Coat

Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 381.80
Air compressor 210 cfm hour 1.400 556.50
Bitumen emulsion pressure distributor @ 1750 sqm/hour hour 1.000 875.60
Water tanker 6 kl capacity 1 trip per hour hour 0.500 655.20
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm t 1.480 47042.50
Water kl 3.000 0.00

Over heads & Contractor's profit 12.500%


Cost of 1750 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1750
7 RBR- TACK COAT
BASC-2 ii
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of
0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom
Technical Specification Clause 503 MORD,including overhead charges & Contractors profit etc., Comple
Excluding GST and seigniorage charges for Tack Coat

Unit = sqm
Taking output = 1750 sqm
a) Labour

175 / 296
Mate day -
Mazdoor (Unskilled) day 1.040 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400 381.80
Air compressor 210 cfm hour 1.400 556.50
Emulsion pressure distributor @1750 sqm per hour hour 1.000 875.60

c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480 28582.50
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
(e) Over heads & Contractor's profit 12.500%
Rate per Sqm

8 Semi-Dense Bituminous Concrete-25mm Thick


Providing and laying Semi-Dense Bituminous Concrete with 40-60 TPH batch type by hot mix plant produ
average output of 37.5 tonnes per hour using crushed aggregates of specified grading premixed with bitu
binder @ 4.5 to 5% of mix and filler,transporting the hot mix to work site,laying with ahydrostatic paver fi
with sensor control to the required grade ,level and alignment,rolling with smooth wheeled,vibratory and t
rollers to achieve the desired compaction as per MORTH specfication clause No.508 complete
respects,including overhead charges & contractors profit but exculding VAT & seignorage charges.

Unit = Cum
Taking output = 195 cum (450 tonnes.)
a) Labour
Mate day
day 12.00 420.00
Mazdoor working with HMP, Mechanical broom,
paver,roller,asphalt cutter and assistance for setting
outlines,levels and layout of construction.

Skilled mazdoor for checking line & levels day 5.84 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
hour 11.00 24636.00
Hot Mix Plant 100 - 120 TPH
ii) Electric Generator Set 250 KVA hour 6.00 2162.60
iii) Front end loader 1 cum bucket capacity hour 6.00 1594.70
Smooth wheeled roller 8-10 tonne for initial break down hour 3.90 1329.90
rolling (6 x 0.65)
Vibratory roler 8 tonne for intermediate rolling Hour 3.9 2736.20
hour 6.00
Hydrostatic Paver finisher with sensor control @ 75 Cum 3115.20
per hour
hour 3.90 1856.50
Finish rolling with 6-8 tonne smooth wheeled tandem
roller.
c) Material
(I) Bitumen 60/70 gr. @ 5% by weight of mix t 22.50 36122.50
Total Weight of mix = 450 tones
Weigth of Bitumen = 22.5 tones
Weigth of Aggregate = 450-22.5= 427.50 tones
176 / 296
Taking density of aggregate = 1.50ton/cum
Volume of aggregate = 285.0 cum
9.5-11.2 mm HBG M/c chips Cum 81.225 966.95
5-7mm HBG M/c Chips Cum 81.225 786.01

177 / 296
2.36 mm-5mm HBG M/c Chips Cum 58.425 552.70
Below 2.36 mm Cum 58.425 449.01

Filler @ 2% of weight of aggregates.(Stone Dust) or 2% of


volume of aggregate i.e 5.70 cum Cum 5.7 449.01

Over heads & Contractor's profit 12.500%


Cost for Cum = a+b+c
Rate per Cum = (a+b+c)/195
9 Removal of Unsuitable / Unserviceable Soil with Disposal
upto 1000 m
Removal of unsuitable / Unserviceable soil including excavation, loading and disposal upto 1000 m lead but
excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall b
separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 MORD / 301 MORTH

Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080 420.00
b) Machinery
Excavator 0.90 cum bucket capacity @ 100 cum per hour hour 3.60 2791.60

Tipper 5.5 cum capacity, 4 trips per hour hour 15.00 413.60
c&d) Overheads & Contractors Profit 12.500%
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360

10 RBR-CCPV- Cement Concrete Pavement


5
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement co
pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type
Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete m
not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approve
side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates in
levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using
scareed and plate vibrators and finished in continuous operation including provision of contraction and exp
construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge /
and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound
specified) and water finishing to lines and grade as per drawing and Technical Specification Clause
MORD.including overhead charges & Contractors profit but excluding GST and seinorage

Unit = cum

Taking output = 75cum (172.50 t)

(100x3.75 x 0.200)

a) Labour

Mason (1st class) day 5.00 500.00

Mason (2nd class) day 5.00 460.00

Mazdoor (unskilled) 178 / 296 day 150.00 420.00

Mazdoor(skilled) day 6.00 420.00


(M) in YSR Kadapa District

Amount

shrubs, saplings and trees of


unserviceable materials and
uding removal and disposal of
Clause 201 MORD . including

1,747.20
0.00

15,468.00

413.60
17,628.80
2,203.60
19,832.40
1.98

achinery

lifts, transporting to site,


to meet requirement of
301.5 MORD including

436.80
0.00

4,661.97

4,276.35
773.40

179 / 296
1,694.40
1,310.40
2,736.20

17,101.00
0.00
0.00
32,990.52

4,123.82
37,114.34
371.14

th Grading III Material(HBG


uniform layers with Tractor
nd compacting with
on Clause 401 MORD
ges & GST

1008.00
3360.00
0.00

5083.20

16,417.20
5083.20
1965.60

182607.48
54958.82
0.00
270483.50
33810.44
304293.94
1014.31

180 / 296
MDD not less than 1.85 g/cc
layers with tractor grader on
the desired density complete
all overheads and contractor's

0.00
436.80
0.00

1694.40
2,736.20
773.40
1310.40

17101.00
0.00
24,052.20
240.52
30.07
270.59
270.59

cadam specification including


of mixed material by tipper to
and compacting with smooth
red density including lighting,
Technical Specification Clause
ST & Seignorage

3,360.00
1,008.00
0.00

6,378.80
6,718.80
4,751.50
1,694.40
4,569.45
871.42

181 / 296
47,258.62

50,834.52

17,915.50

0.00
145,361.01
1,453.61
181.70
1,635.31

ace of granular base including


ng mechanical means as per
including overhead charges &
me Coat

436.80
0.00

534.52
779.10
875.60
327.60

69,622.90
0.00
72,576.52
9,072.07
81,648.59
46.66

stributor at the rate of 0.25 to


with Hydraulic broom as per
ors profit etc., Complete but

182 / 296
436.80
0.00

534.52
779.10
875.60

13,719.60
16,345.62
9.34
1.17
10.51

y hot mix plant producing an


ng premixed with bituminous
th ahydrostatic paver finisher
wheeled,vibratory and tandem
se No.508 complete in all
rage charges.

5040.00

2452.80
0.00

270996.00

12975.60
9568.20

5186.61

10671.18
18691.20

7240.35

812756.25

183 / 296
78540.51
63843.66

184 / 296
32291.50
26233.41

2559.36

1359046.63
169,880.83
1528927.46
7840.70

upto 1000 m lead but


table soil, which shall be paid
D / 301 MORTH

873.60

10049.76

6204.00
2140.92
19268.28
53.52

only, plain cement concrete


ent or any other type as per
aximum in a concrete mixer of
design, laid in approved fixed
wedges, steel plates including
kes, compacted using needle,
of contraction and expansion,
pproaches to bridge / culvert
ays, curing compound (where
al Specification Clause 1501
age

2,500.00

2,300.00

63,000.00 185 / 296

2,520.00
RATE ANALYSIS (CD - WORKS) - SSR2019-20

Add Municipal/ Agency Allowance 0%


Over heads & Contractor's profit 12.500%
Water (Y/N) N 0.00 Rate per kL

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M)


YSR Kadapa District

S.No. Description of item Unit Qty Rate

Excavation for Structures


1 RBR- Earthwork in excavation for structures as per drawing and technical specifications Cla
FNDN- 305.1 including setting out, construction of shoring and bracing, removal of stumps and o
1 1B i deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
backfilling in trenches with excavated suitable material as per Technical Specification
MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding GST
seigniorage charges - For Foundations

Note : Classifications of Earth Work Specification


are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H
Ordinary soil
Mechanical Means
i Upto 3 m depth
Unit = cum
Taking output = 240 cum
a)  Labour
Mazdoor (Unskilled) day 8.32 420.00
Add Municipal/ Agency Allowance 0%
b) Machinery
Hydraulic Excavator 1 cum bucket capacity hour 6.00 2791.60

Over heads & Contractor's profit 12.500%


Cost for 240 cum = a+b+c+d

Rate per cum


D Hard Rock ( requiring blasting )
Mechanical Means
Unit = cum
Taking out put = 10 cum
Labour
Mazdoo (unskilled) day 5.20 420.00
Machinery
Air Compressor 250 cfm with 2 leads of pneumatic hour 6.00 556.50

add Over Head charges and contractor profit 12.50% 5523


Rate per 10 cum
Rate per cum

186 / 296
2 RBR- Filling in foundation trenches for Pipe bedding with Sand as per drawing and techn
FNDN-2 specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contrac
profit but excluding GST and seigniorage charges.

Sand filling
Unit = 6cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 0.31 420.00
Add Municipal/ Agency Allowance 0%
b) Material
Sand cum 6.00 441.28

Over heads & Contractor's profit 12.5%

Rate per 6 cum


Rate per cum = a+b+c+d
3 RBR- Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nom
FNDN-4 size Graded hard stone aggregate, mechanically mixed, placed in foundation and compa
by vibration including curing for 14 days complete as per drawings and technical specificat
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overh
charges & Contractors profit but excluding GST and seigniorage charges For levelling cou

to Pipe / Slab Culverts


1(i) P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22 3900.00
Coarse sand cum 0.45 899.39
40 mm aggregate cum 0.9 946.01
Water kl 1.20 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.10 500.00
Mazdoor (Unskilled) day 1.39 420.00
Add Municipal/ Agency Allowance 0%
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity hour 0.40 525.50
fitted with water measuring device and preferably
also with load cell.
Water tanker 6 kl capacity hour 0.13 655.20

(d) Formwork @ 4% on cost of material, labour 0.00%


and machinery (a+b+c)

Over heads & Contractor's profit 12.500%

Rate per cum = a+b+c+d+e+f

187 / 296
4 RBR- Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixe
SBST-5 foundation complete as per drawings and technical specification Clauses 802, 804, 805,
I 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charge
Contractors profit but excluding GST and seigniorage charges below GL

For Head walls of pipe culverts & footings of


slab culverts & side walls of drain
Note : Water for concrete : A provision for cost of
water may be added at 1.2 kl / 1 cum (including
curing purpose) keeping the site conditions

Coarse Aggregate : Single grade nominal size can


also be used instead of graded metal, keeping the
site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)

Unit = cum
(a) Material
Cement t 0.275 3900.00
Coarse sand cum 0.480 899.39
40 mm aggregate cum 0.480 946.01

20 mm aggregate cum 0.240 1456.01


10 mm aggregate cum 0.080 1036.01
Water kl 1.200 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.100 500.00
Mazdoor (Unskilled) day 1.390 420.00
Add Municipal/ Agency Allowance 0%
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 525.50

(d) Formwork @ 4% on cost of material, labour 4.00%


and machinery (a+b+c)

Over heads & Contractor's profit 12.500%

Rate per cum = a+b+c+d+e+f

188 / 296
5 RBR- Plain cement concrete M 15 grade using 40,20 & 10mm metal mechanically mixe
SBST-5 foundation complete as per drawings and technical specification Clauses 802, 804, 805,
I 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charge
Contractors profit but excluding GST and seigniorage charges - above GL

For Abutments & wing walls of slab culvert,


Retaining walls
Note : Water for concrete : A provision for cost of
water may be added at 1.2 kl / 1 cum (including
curing purpose) keeping the site conditions

Coarse Aggregate : Single grade nominal size can


also be used instead of graded metal, keeping the
site conditions in view

For height upto 5 m


Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)

Unit = cum
(a) Material
Cement t 0.275 3900.00
Coarse sand cum 0.480 899.39
40 mm aggregate cum 0.480 946.01

20 mm aggregate cum 0.240 1456.01


10 mm aggregate cum 0.080 1036.01
Water kl 1.200 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.100 500.00
Mazdoor (Unskilled) day 1.390 420.00
(c) Machinery 0%
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 525.50

(d) Formwork @ 10% on cost of material, labour 10.00%


and machinery (a+b+c)

Over heads & Contractor's profit 12.500%

Rate per cum = a+b+c+d+e+f

189 / 296
6 RBR- Plain cement concrete M 20 grade (Design mix) using 40,20 & 10mm metal (H
SBST-5 mechanically mixed in foundations complete as per drawings and technical specifica
III Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MO
,including contractors profit & Over head charges, GST and Seigneorage etc., complete-

For Abutments & wing walls foundations


Note : Water for concrete : A provision for cost of
water may be added at 1.2 kl / 1 cum (including
curing purpose) keeping the site conditions

Coarse Aggregate : Single grade nominal size can


also be used instead of graded metal, keeping the
site conditions in view

For height upto 5 m


Unit = cum
P.C.C grade M 20
Desin mix (1:2:4) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement t 0.343 3900.00
Coarse sand cum 0.450 899.39
40 mm aggregate cum 0.360 946.01
20 mm aggregate cum 0.360 1456.01
10 mm aggregate cum 0.180 1036.01
Water kl 1.200 0.00
(b) Labour
Mason (1st Class) day 0.100 500.00
Mazdoor (Unskilled) day 1.390 420.00
Add Municipal/ Agency Allowance 0%
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 525.50
Generator 33 kVA hour 0.400 1032.00

(d) Formwork @ 4% on cost of material, labour 4.00%


and machinery (a+b+c)

Over heads & Contractor's profit 12.5%

Rate per cum = a+b+c+d+e+f


7 RBR- Plain cement concrete M 20 grade (Design mix) using 40,20 & 10mm metal (H
SBST-5 mechanically mixed in Sub structure complete as per drawings and technical specifica
I Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MO
,including contractors profit & Over head charges, GST and Seigneorage etc., complete-

For Abutments & wing walls sub structure

Note : Water for concrete : A provision for cost of


water may be added at 1.2 kl / 1 cum (including
curing purpose) keeping the site conditions

Coarse Aggregate : Single grade nominal size can


also be used instead of graded metal, keeping the
site conditions in view

190 / 296
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)

Unit = cum
(a) Material
Cement t 0.343 3900.00
Coarse sand cum 0.450 899.39
40 mm aggregate cum 0.360 946.01
20 mm aggregate cum 0.360 1456.01
10 mm aggregate cum 0.180 1036.01
Water kl 1.200 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.100 500.00
Mazdoor (Unskilled) day 1.390 420.00
Add Municipal/ Agency Allowance 0%
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 525.50
Generator 33 kVA hour 0.400 1032.00

(d) Formwork @ 10% on cost of material, labour 10.00%


and machinery (a+b+c)

Over heads & Contractor's profit 12.500%

Rate per cum = a+b+c+d+e+f


8 RBR- Supplying, fitting and placing HYSD bar reinforcement in foundation complete as
FNDN-7 drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH
Bars below 36 mm dia including over laps and wastage, where they are not welded ,inclu
contractors profit & Over head charges, GST etc., complete - For Foundation

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and t 1.05 42000.00
wastage
Binding wire kg 6.00 55.00
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Mate day -
Blacksmith day 2.00 495.00
Mazdoor (Unskilled) day 6.40 420.00
Add Municipal/ Agency Allowance 0%

Over heads & Contractor's profit 12.5%

Rate per t = a+b+c+d


9 RBR- Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete
SBST-6 per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Section
1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where the
are not welded ,including overhead charges & Contractors profit but excluding GST and
seigniorage charges - For Sub Structures

191 / 296
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and t 1.05 42000.00
wastage
Binding wire kg 6.00 55.00
(b) Labour for cutting, bending, shifting to site,
tying, and placing in position

192 / 296
Mate day -
Blacksmith day 2.00 495.00
Mazdoor (Unskilled) day 6.84 420.00
Add Municipal/ Agency Allowance 0%

Over heads & Contractor's profit 12.500%

Rate per t = a+b+c+d

10 RBR- Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as
SPST-2 drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH
Bars below 36 mm dia including over laps and wastage, where they are not welded ,inclu
overhead charges & Contractors profit but excluding GST and seigniorage charges -
Super Structures

Unit = t
(a) Material
HYSD bars including 5 per cent for laps and t 1.05 42000.00
wastage
Binding wire kg 8.00 55.00
(b) Labour for cutting, bending, tying and placing
in position
Blacksmith/ Rod Binder day 3.00 495.00
Mazdoor (Unskilled) day 8.44 420.00
Add Municipal/ Agency Allowance 0%

Over heads & Contractor's profit 12.500%

Rate per t = a+b+c+d


11 RBR- Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanicall
SBST-5 mixed in substructure complete as per drawings and technical specification Clauses 802,
VI 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overh
charges & Contractors profit but excluding GST and seigniorage charges (upto 5m height)

For piers, side walls, bed blocks


R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement t 0.403 3900.00
Coarse sand cum 0.450 899.39
20 mm aggregate cum 0.540 1456.01
10 mm aggregate cum 0.360 1036.01
Water kl 1.200 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.10 500.00
Mazdoor (Unskilled) day 1.39 420.00
Add Municipal/ Agency Allowance 0%
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 525.50
Generator 33 KVA hour 0.40 1032.00

193 / 296
(d) Formwork @ 10% on (a+b+c) 10.00%

Over heads & Contractor's profit 12.500%

Rate per cum = a+b+c+d+e+f

194 / 296
12 RBR- Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10m
SPST-1- metal mechanically mixed in superstructure as per drawing and technical specifications
II(A) Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including
overhead charges & Contractors profit but excluding GST and seigniorage chargesupto 5m
height. - For Super Structure (Deck slab)
R.C.C M 25 Grade (Design Mix)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement t 0.40 3900.00
Coarse sand cum 0.45 899.39
20 mm aggregate cum 0.54 1456.01
10 mm aggregate cum 0.36 1036.01
Water kl 1.200 0.00
(b) Labour
Mason (1st Class) day 0.10 500.00
Mazdoor (Unskilled) day 1.39 420.00
Add Municipal/ Agency Allowance 0%
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour/cum 0.40 525.50
Generator 33 KVA hour 0.40 1032.00

d) Formwork and staging of (a+b+c) 20.00%

Over heads & Contractor's profit 12.500%

Rate per cum = a+b+c+d+e+f


13 RBR- Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 2
SPST-5 10mm metal mechanically mixed excluding reinforcement complete as per drawing and
(i) technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhea
charges & Contractors profit but excluding GST and seigniorage charges -

Unit = cum
(a) Material
Cement t 0.407 3900.00
Sand cum 0.45 899.39
20 mm aggregate cum 0.54 1456.01
10 mm aggregate cum 0.36 1036.01
(b) Labour
Mason (1st Class) day 0.10 500.00
Mazdoor (Unskilled) day 1.39 420.00
Mazdoor (Unskilled) for cleaning deck slab day 0.15 420.00
concrete surface
Add Municipal/ Agency Allowance 0%
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 525.50
Generator 33 KVA. hour 0.40 1032.00

(d) Formwork @ 3% of cost of concrete 3.00%

Over heads & Contractor's profit 12.500%


Rate per cum = a+b+c+d+e+f
14 Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance
all labour charges and including contractors profit & Over head charges, GST etc., complete
195 / 296
Initial cost BMS-W.20 sqm 1.00 991.00
YSIS (CD - WORKS) - SSR2019-20

m Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in

Amount

or structures as per drawing and technical specifications Clause


, construction of shoring and bracing, removal of stumps and other
disposal upto a lead of 50 m, dressing of sides and bottom and
h excavated suitable material as per Technical Specification 305
ding overhead charges & Contractors profit but excluding GST and
oundations

3,494.40
0.00

16,749.60
20,244.00
2,530.50
22,774.50
22,774.50
94.90

2184

3339
5523
690.375
6213.375
621.34

196 / 296
ches for Pipe bedding with Sand as per drawing and technical
9 MORD & 304 MORTH ,including overhead charges & Contractors
d seigniorage charges.

130.20
0.00

2,647.68
2,777.88
347.24

3,125.12
520.90
concrete M 10 grade in open foundations using 40 mm nominal
gregate, mechanically mixed, placed in foundation and compacted
g for 14 days complete as per drawings and technical specifications
1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead
t but excluding GST and seigniorage charges For levelling course

858.00
404.73
851.41
0.00

50.00
583.80
0.00

210.20

85.18
3,043.32
0.00

3,043.32
380.42
3,423.74

3,423.80

197 / 296
15 grade using 40,20 & 10mm metal mechanically mixed in
r drawings and technical specification Clauses 802, 804, 805, 806,
D and 1500, 1700 & 2200 MORTH ,including overhead charges &
ding GST and seigniorage charges below GL

1,072.50
431.71
454.08

349.44
82.88
0.00

50.00
583.80
0.00

210.20
3,234.61
129.38

3,363.99
420.50
3,784.49
3,784.50

198 / 296
15 grade using 40,20 & 10mm metal mechanically mixed in
r drawings and technical specification Clauses 802, 804, 805, 806,
D and 1500, 1700 & 2200 MORTH ,including overhead charges &
ding GST and seigniorage charges - above GL

1,072.50
431.71
454.08

349.44
82.88
0.00

50.00
583.80
0.00

210.20
3,234.61
323.46

3,558.07
444.76
4,002.83
4,002.90

199 / 296
20 grade (Design mix) using 40,20 & 10mm metal (HBG)
undations complete as per drawings and technical specification
06, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
& Over head charges, GST and Seigneorage etc., complete-

1,337.70
404.73
340.56
524.16
186.48
0.00

50.00
583.80
0.00

210.20
412.80
4,050.43
162.02

4,212.45
526.56
4,739.01
4,739.10
20 grade (Design mix) using 40,20 & 10mm metal (HBG)
b structure complete as per drawings and technical specification
06, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
& Over head charges, GST and Seigneorage etc., complete-

200 / 296
1,337.70
404.73
340.56
524.16
186.48
0.00

50.00
583.80
0.00

210.20
412.80
4,050.43
405.04

4,455.47
556.93
5,012.40
5,012.40
cing HYSD bar reinforcement in foundation complete as per
cifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for
uding over laps and wastage, where they are not welded ,including
ead charges, GST etc., complete - For Foundation

44,100.00

330.00

990.00
2,688.00
0.00
48,108.00
6,013.50
54,121.50
54,121.50
ng HYSD bar reinforcement (Fe 415) in substructure complete as
specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections
rs below 36 mm dia including over laps and wastage, where they
verhead charges & Contractors profit but excluding GST and
Sub Structures

201 / 296
44,100.00

330.00

202 / 296
990.00
2,872.80
0.00
48,292.80
6,036.60
54,329.40
54,329.40

ing HYSD bar reinforcement in superstructure complete as per


cifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for
uding over laps and wastage, where they are not welded ,including
actors profit but excluding GST and seigniorage charges - For

44,100.00

440.00

1,485.00
3,544.80
0.00
49,569.80
6,196.23
55,766.03
55,766.10
e M25 grade (Design Mix) using 20 & 10mm metal mechanically
mplete as per drawings and technical specification Clauses 802,
nd 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
t but excluding GST and seigniorage charges (upto 5m height)

1,571.70
404.73
786.25
372.96
0.00

50.00
583.80
0.00

210.20
412.80

203 / 296
4,392.44
439.24
4,831.68
603.96
5,435.64
5,435.70

204 / 296
ced cement concrete M25 grade (Design Mix) using 20 & 10mm
n superstructure as per drawing and technical specifications
205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including
ctors profit but excluding GST and seigniorage chargesupto 5m
ure (Deck slab)

1,560.00
404.73
786.25
372.96
0.00

50.00
583.80
0.00

210.20
412.80
4,380.74
876.15
5,256.89
657.11
5,914.00
5,914.00
t concrete wearing course M 30 (Design Mix) grade using 20 &
mixed excluding reinforcement complete as per drawing and
uses 800 and 1206.3 MORD and 2702 MORTH ,including overhead
t but excluding GST and seigniorage charges -

1,587.30
404.73
786.25
372.96

50.00
583.80
63.00
0.00

210.20
412.80
4,471.04
134.13
4,605.17
575.65
5,180.90
ituminous Mastic pad 25.4 mm including cost and conveyance and
ding contractors profit & Over head charges, GST etc., complete
205 / 296
991.00
RBR-TSRA

TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENAN


Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram
Pulivendula (M) in YSR Kadapa District
Index-
S. No Description Unit Quantity Rate Rs.
code
1 2 3 4 5
Allowances Made
Over heads & Contractor's Profit 12.500%
Add Municipal/ Agency Allowance 0.00%
Water (Y/N) N 0.00 Rate per kL
Sub analysis
RBR- a Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
FNDN-7 drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600
MORTH for Bars below 36 mm dia including over laps and wastage, where they are
not welded.

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and t 1.05 42000.00
wastage
Binding wire kg 6.00 55.00
(b) Labour for cutting, bending, shifting to site,
tying and placing in position
Mate day -
Blacksmith day 2.00 495.00
Mazdoor (Unskilled) day 6.40 420.00
Add Municipal/ Agency Allowance 0.00%

Rate per t = a+b+c+d


RBR- b Earthwork in excavation for structures as per drawing and technical specifications
FNDN-1 Clause 305.1 including setting out, construction of shoring and bracing, removal of
stumps and other deleterious material and disposal upto a lead of 50 m, dressing of
sides and bottom and backfilling in trenches with excavated suitable material as per
Technical Specification 305 MORD / 304 MORTH ,including overhead charges &
Contractors profit but excluding GST.

1(i) A(i) Note : Classifications of Earth Work Specification


are as per 302.2.1(a) of MORD and 301.2.1 of
MORT&H
Ordinary soil
Manual means
i Upto 3 m depth
Unit = cum
Taking output = 10 cum
a)  Labour
Mate day -
Mazdoor (Unskilled) day 3.64 420.00
Add Municipal/ Agency Allowance 0.00%

Rate per cum = /10


For Road Furniture Items
c Plain/reinforced cement concrete in Foundations complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and
1500, 1700 & 2200 MORTH
RBR-TSRA

Note : Water for concrete : A provision for cost


of water may be added at 1.2 kl / 1 cum (including
curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size
can also be used instead of graded metal, keeping
the site conditions in view

Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)

Unit = cum
(a) Material
Cement t 0.275 3900.00
Coarse sand cum 0.480 899.39
40 mm aggregate cum 0.480 946.01
20 mm aggregate cum 0.240 1456.01
10 mm aggregate cum 0.080 1036.01
Water kl 1.200 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.100 500.00
Mazdoor (Unskilled) day 1.390 420.00
Add Municipal/ Agency Allowance 0.00%
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 525.50
(d) Formwork @ 4% on cost of material, labour and 4.00%
machinery (a+b+c)
Rate per cum = a+b+c+d+e+f
RBR- d Providing concrete for plain concrete M 10 grade in open foundations using 40 mm
FNDN-4 nominal size Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14 days complete as per
drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but
excluding GST.

P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22 3900.00
Coarse sand cum 0.45 899.39
40 mm aggregate cum 0.90 946.01
Water kl 1.20 0.00
(b) Labour
Mate day -
Mason (1st Class) day 0.10 500.00
Mazdoor (Unskilled) day 1.39 420.00
Add Municipal/ Agency Allowance 0.00%
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity hour 0.40 525.50
fitted with water measuring device and preferably
also with load cell.
Water tanker 6 kl capacity hour 0.13 655.20
RBR-TSRA

Rate per cum = a+b+c+d+e+f


RBR- e Painting Two Coats on New Concrete Surfaces
TSRA-6
i Painting two coats including primer coat after filling the surface with synthetic
enamel paint in all shades on new, plastered / concrete surfaces as per drawing and
Technical Specification Clause 1701MORD.
Unit = sqm
Taking output = 40 sqm
a)  Labour
Mate day -
Painter (1st Class) day 3.00 580.00
Painter Assistant day
Mazdoor (Unskilled) day 2.20 420.00
Add Municipal/ Agency Allowance 0.00%
b) Material
Cement Primer as per specifications litre 3.00 180.00
Paint conforming to requirement of Clause 1701.3.8 litre 6.00 222.00

Add for scaffolding @ 1 per cent of labour cost


where required
Filling Material on Paint Cost

Cost for 40 sqm = a+b+c+d


Rate per sqm = (a+b+c+d)/40
RBR- f Painting on Concrete/Steel Surfaces with
TSRA-9 Epoxy
Painting two coats including prime coat with epoxy paint of approved brand on
concrete/steel surfaces after through cleaning of surface to give an even shade as
per drawing and Technical Specification Clause 1701 MORD
Unit = sqm
Taking output = 10 sqm
a) Labour
Mate day -
Painter (1st Class) day 0.60 580.00
Mazdoor (Unskilled) day 0.65 420.00
Add Municipal/ Agency Allowance 0.00%
b) Material
Epoxy primer / Red-oxide litre 0.60 121.00
Epoxy paint litre 1.25 280.00
Add @ 1 per cent on cost of material for scaffolding wherever
required
Cost for 10 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/10
g Printing New Letters and Figures of any Shade
RBR-TSRA-1 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved
colour to give an even shade as per drawings and Technical Specification Clause 1701 MORD / 801
MORTH
(ii) English and Roman
Hyphens, commas and the like not to be measured and paid for.
Detail for 100 letters of 160 mm height, i.e. 1600 cm

Unit = per cm height per letter


a) Labour
Mate day -
Painter 1st Class day 1.25 580.00
RBR-TSRA

Painter Assistant day


Mazdoor (Unskilled) day 0.57 420.00
Add Municipal/ Agency Allowance 0.00%
b) Material
Paint litre 0.50 222.00
Cost for 1600 cm = a+b+c+d
Rate per cm height per letter = (a+b+c+d)/1600
RBR-TSRA

B Semi Reflective Traffic Signs


RBR-TSRA-2 1 Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67
made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on
back with red reflective boarder of 65mm width and required letters and figures with reflective
engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade
and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly
strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly
designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per
approved drawings and technical specification Clause 1701.2.2 of MORD excluding GST& seineorage
with 600X 600 mm size MS sheet

Unit = Each
Taking output = one traffic sign
(i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.126 152.88
(ii) Cement concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.126 3363.99
(iii) Painting two coats including prime coat on concrete
surface with Epoxy Paint as per specifications

As per item No. 9 of this Chapter sqm 0.46 104.78


(a) labour (For fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.26 420.00
Add Municipal/ Agency Allowance 0.00%
b) Material
Support of M.S. Sheet tube
(I) 47 mm x 47 mm x 12 SWG Sheet 3050 mm long kg 12.40 42.00
(II) Angle iron 50 x 50 x 6 mm for hold fast including 5% wastage kg 1.06 42.00

Add 3% cost of MS Sheet tube 12 SWG and angle irons towards


the cost of fabrication, drilling holes, nuts and bolts etc.

(III) 1.5 mm thick M.S. Sheet duly painted with stove enameled
paint including lettering, signs, border, message with reflective
tape of engineering grade required size, shade and colour as
per Technical Specifications

(i) 900 mm equilateral triangle sqm 0.35


OR
(ii) 600 mm equilateral triangle sqm 0.156
OR
(iii) 600 mm circular sqm 0.283
OR
(iv) 800 mm x 600 mm rectangular sqm 0.48
OR
(v) 600 mm x 450 mm rectangular sqm 0.27
OR
(0.36 Sqm. X 0.0015X7850 Kg/cum) Kg 4.24 42.00
(vi) 600 mm x 600 mm square sqm 0.36
OR
(vii) 900 mm side octagon sqm 0.672
(c) Machinery
Tractor with trolley hour 0.08 413.60
Over heads & Contractor's Profit 12.50%
Rate per traffic sign = (i+ii+iii+a+b+c+d+e)
Note : 1. Any one area of M.S. Sheet given at (i) to (viii) may be adopted as per site requirement and in ac
IRC-67.
RBR-TSRA

2. The rate for excavation, cement concrete M-15, and painting may be taken from respective Chapters.
3. The depth of foundation and quantity of cement in the foundation are indicative. These may be incre
having higher wind velocities like in coastal area. This is applicable to all road signs and direction boards.
RBR-TSRA

B Semi-Reflective Traffic signs


Direction and place identification signs up to 0.9 sqm size
board
2 Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm
size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in
front and grey colour on back with red reflective border of 70 mm width and required message, letters,
figures with reflective engineering grade tape as per MORD specifications of required shade and colour.
supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly
strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of
properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm
below ground level as per drawings and Technical Specification Clause 1701 MORD excluding GST &
seinorage charges up to 0.9 sqm size board

Unit = each
Take Output = 0.9 sqm
(i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.126 152.88
(ii) Cement concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.126 3363.99
(iii) Painting on M.S. tube post with primer and two coat of
epoxy paint as per specifications

As per item No.9 of Chapter 10 sqm 0.59 104.78


(a) labour (For fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.26 420.00
Add Municipal/ Agency Allowance 0.00%
b) Material
(i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long kg 12.40 42.00
(ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage kg 1.06 42.00

(iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS sqm 0.90


flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.

(0.90 Sqmx0.002 mx7850 kg/cum) Kg 14.13 42.00


Add 3% cost of MS sheet angle iron towards the cost of
fabrications, drilling, holes, nuts, bolts etc.

(c) Machinery
Tractor with trolley hour 0.08 413.60
Over heads & Contractor's Profit 12.50%
Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e)
Rate per 0.9 sqm board 1 No.
Note : Rate for excavation, cement concrete M15 and painting may be taken from respective Chapters.
RBR-TSRA

RBR-TSRA- 3 Providing and Fixing 'Logo' of PMGSY Project


20

Providing & fixing of typical informatory sign board as per MORD secifications and drawing. Three MS
plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on
edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame
of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC
M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond
plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove
enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All
sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per
drawing clause 1701 and annexure 1700.1 if MORD excluding GST & seineorage charges

Unit = Each
Taking out put = one typical board
i) Excavation for foundation
As per item No. 1 of Chapter 11 cum 0.252 152.88
(ii) Cement Concrete M15 grade
As per item No. 4 (A) (iii) or (iv) of Chapter 11 cum 0.252 3363.99
(iii) Painting on MS Steel tubes with primer and two coats of
epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 9 of Chapter 10 sqm 1.80 104.78
(iv) Printing new letters and figures of any shade with
synthetic enamel paint black or any other approved colour to
give an even shade.
Logo Border 60x4x5 = 1200 per cm height per letter

Figure 60x10 = 600 per cm height per letter


Middle plate words 28x5 = 140 per cm height per letter

Bottom plate border 150x2x5 = 1500 per cm height per letter

Bottom plate border 60x2x5 = 600 per cm height per letter

Words 101x2.5 = 252.5


Words 80x3 = 240.00
Total (4532.5 per cm height per letter)
As per item No. 1 of Chapter 10 per cm 4532.50 0.67
height /
letter
a) Labour (for fixing at site)
Mate day -
Mazdoor (Unskilled) day 0.78 420.00
Add Municipal/ Agency Allowance 0.00%
b) Material
2 nos. MS tubes 75mx75mm of 12 SWG sheet 2650 mm long kg 63.15 42.00

1 No. MS tube 47mm x 47mm of 12 SWG 1100 mm long kg 4.47 42.00

Angle iron 50mm x 50mm x 5 mm for lugs kg 2.12 42.00


RBR-TSRA

1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron sqm 1.44


on logo and middle plate angle iron 25mm x 25mm x 5mm on
bottom plate painting with stove enameled paint on both sides
as per MORD specifications

(1.44 sqmx0.0016mx7850 kg/cum) Kg 18.09 42.00


Add 3% cost of MS tube and angle iron towards the cost of
fabrications, drilling holes, nuts, bolts, etc.

c) Machinery
Tractor with trolley hour 0.24 413.60
Over heads & Contractor's Profit 12.50%
Cost for one Board= (i+ii+iii+iv+a+b+c+d+e)
Printing and lettering for blank spaces on the lower plate will be written as required and paid separately.

RBR-TSRA- Kilometre Stones


13
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8
fixing in position including painting and printing, etc as per drawing and Technical Specification Clause
1703 MORD / 804 MORTH excluding GST & seinorage charges

10 (i) 5th Kilometre Stone (precast)


Unit = each
Taking output = 6 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 2.35 3363.99
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 22.08 48.11
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11 cum 1.68 152.88
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 9.85 113.40
e) lettering on km post (average 30 letters of 10 cm height each)
As per item No. 1 of Chapter 10 per cm high 1800.00 0.67
per letter

Transportation and fixing


f) Labour
Mate day -
Mason (1st Class) day 0.60 500.00
Mazdoor (Unskilled) day 6.26 420.00
Add Municipal/ Agency Allowance 0.00%
g) Machinery
50 HP Tractor with trolley hour 6.00 413.60
Over heads & Contractor's Profit 12.50%
j )Cost for 6 Nos. 5th km stone = a+b+c+d+e+f+g+h+i
Rate for each 5th km stone = j/6
4 (ii) Ordinary Kilometer Stone (Precast)
Unit = each
Taking output = 14 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 3.77 3363.99
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 26.32 48.11
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11 cum 2.77 152.88
d) Painting two coats on concrete surface
RBR-TSRA

As per item No.5 of Chapter 10 sqm 11.41 113.40


e) lettering on km post (average 12 letters of 10 cm height each)

As per item No. 1 of Chapter 10 per cm high 1680.00 0.67


per letter

Transportation and fixing


f) Labour
Mate day -
Mason (1st Class) day 1.00 500.00
Mazdoor (Unskilled) day 7.32 420.00
Add Municipal/ Agency Allowance 0.00%
g) Machinery
50 HP Tractor with trolley hour 6.00 413.60
Over heads & Contractor's Profit 12.50%
j) Cost for 14 Nos. ordinary km stone = (a+b+c+d+e+f+g+h+i)
Rate for each ordinary km stone = j/ 14
5 (iii) 200 m / Hectometer stone (precast)
Unit = each
Taking output = 33 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 1.58 3363.99
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 66.00 48.11
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11 cum 1.39 152.88
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 6.27 113.40
e) lettering on km post (average 1 letter of 10 cm height each)

As per item No. 1 of Chapter 10 per cm high 330.00 0.67


per letter

Transportation and fixing


f) Labour
Mate day -
Mason (1st Class) day 1.50 500.00
Mazdoor (Unskilled) day 7.34 420.00
Add Municipal/ Agency Allowance 0.00%
g) Machinery
50 HP Tractor with trolley hour 6.00 413.60
Over heads & Contractor's Profit 12.50%
j) Cost for 33 Nos. 200 m stone = (a+b+c+d+e+f+g+h+i)

Rate for each 200 m stone = j / 33


Note : 1. The rate for excavation, cement concrete, steel reinforcement, painting and lettering may b
respective Chapters.
2. In case local stone is to be used in place of precast RCC stones, then rate of cement concrete and steel
may be deleted.

DY.Executive Engineer Asst Executive Engineer


PRI SD Pulivendula PRI SD Pulivendula
RBR-TSRA

Superintending Engineer Executive Engineer


PR Circle , Kadapa PR Division Jammalamadugu
RBR-TSRA

RKINGS AND OTHER ROAD APPURTENANCES


road from Krishnamgaripalli to Ahobilapuram of
la (M) in YSR Kadapa District
Amount Rs.

Rate per kL

44100.00

330.00

990.00
2688.00
0.00

48108.00

1528.80
0.00
1528.80
152.88
RBR-TSRA

1072.50
431.71
454.08
349.44
82.88
0.00

50.00
583.80
0.00

210.20
129.38

3363.99

858.00
404.73
851.41
0.00

50.00
583.8
0.00

210.20

85.18
3043.32
RBR-TSRA

3043.32

1740.00

924.00
0.00

540.00
1332.00

4536.00
113.40

348.00
273.00
0.00

72.60
350.00
4.23

1047.83
104.78

725.00
RBR-TSRA

239.40
0.00

111.00
1075.40
0.67
RBR-TSRA

19.26

423.86

48.20

109.20
0.00

520.80
44.52

16.96

178.04

33.09
174.24
1568.20
eet given at (i) to (viii) may be adopted as per site requirement and in accordance with
RBR-TSRA

t concrete M-15, and painting may be taken from respective Chapters.


quantity of cement in the foundation are indicative. These may be increased for areas
in coastal area. This is applicable to all road signs and direction boards.
RBR-TSRA

19.26

423.86

61.82

109.20
0.00

520.80
44.52

593.46
17.80

33.09
227.98
2051.79
2051.80
t concrete M15 and painting may be taken from respective Chapters.
RBR-TSRA

38.53

847.73

188.60

3036.78

327.60
0.00

2652.30

187.74

89.04
RBR-TSRA

759.78
110.67

99.26
1042.25
9380.30
aces on the lower plate will be written as required and paid separately.

7905.39

1062.22

256.84

1116.99

1206.00

300.00
2629.20
0.00

2481.60
2119.78

3179.70

12682.26

1266.20

423.48
RBR-TSRA

1293.89

1125.60

500.00
3074.40
0.00

2481.60
2855.93
25703.36
1836.00

5315.11

3175.13

212.50

711.02

221.10

750.00
3082.80
0.00

2481.60
1993.66
17942.92

543.80
n, cement concrete, steel reinforcement, painting and lettering may be taken from

d in place of precast RCC stones, then rate of cement concrete and steel reinforcement
RBR-TSRA
TRAFFIC VOLUME

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Date of Survey :
Total
Animal
Motor
Drawn Motorised
Cycles/Sc Pedestiran
Sl.No Duration Buses Trucks Cars Vans Jeeps Bicycles Carts Except Non
ooters/Tw s
(Bullock Two Motorised
o wheelers
carts) Wheelers

1 2 3 4 6 7 8 9 10 11 12 13 14
1 5.00 to 6.00A,M 0 1 0 0 0 0 4 0 0 1 4

2 6.00 to 7.00 A.M 0 1 0 2 1 15 11 1 0 20 11

3 7.00 to 8.00 A.M 0 1 2 1 0 8 2 3 5 14 7

4 8.00 to 9.00 A.M 0 2 1 2 0 9 2 15 5 15 7

5 9.00 to 10.00 A.M 0 0 1 1 1 5 2 2 4 10 6

6 10.00 to 11.00 A.M 0 1 3 1 0 4 2 7 6 11 8

7 11.00 to 12.00 Noon 0 1 1 0 1 5 2 13 7 10 9

8 12.00 to 1.00 P.M 0 2 2 1 1 2 2 3 12 10 14

9 1.00 to 2.00 P.M 0 1 1 2 1 2 3 2 4 10 7

10 2.00 to 3.00 P.M 0 0 4 0 0 6 2 6 5 12 7

11 3.00 to 4.00 P.M 0 1 3 0 1 6 2 12 4 15 6

12 4.00 to 5.00 P.M 0 1 1 1 0 2 8 4 6 8 14

13 5.00 to 6.00 P.M 0 1 2 1 1 4 4 3 3 13 7

14 6.00 to 7.00 P.M 0 1 2 2 2 5 2 5 4 14 6

15 7.00 to 8.00 P.M 0 0 1 1 1 7 2 4 0 14 2

16 8.00 to 9.00 P.M 0 1 1 0 1 2 2 2 0 8 2

TOTAL : 0 15 25 15 11 82 52 82 65 185 117


Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Date of Survey :
Total
Animal
Motor
Drawn Motorised
Cycles/Sc Pedestiran
Sl.No Duration Buses Trucks Cars Vans Jeeps Bicycles Carts Except Non
ooters/Tw s
(Bullock Two Motorised
o wheelers
carts) Wheelers

1 2 3 4 6 7 8 9 10 11 12 13 14
1 5.00 to 6.00A,M 0 0 0 0 0 0 0 0 0 0 0

2 6.00 to 7.00 A.M 0 1 1 2 3 14 11 0 0 23 11

3 7.00 to 8.00 A.M 0 1 2 2 1 6 2 0 8 13 10

4 8.00 to 9.00 A.M 0 2 4 1 2 7 2 15 6 18 8

5 9.00 to 10.00 A.M 0 1 2 3 3 4 2 7 5 14 7

6 10.00 to 11.00 A.M 0 0 1 0 0 3 3 8 6 5 9

7 11.00 to 12.00 Noon 0 1 2 1 1 2 4 9 4 9 8

8 12.00 to 1.00 P.M 0 2 1 0 2 4 2 2 11 11 13

9 1.00 to 2.00 P.M 0 0 3 0 1 5 4 2 2 12 6

10 2.00 to 3.00 P.M 0 1 1 1 1 3 6 7 3 11 9

11 3.00 to 4.00 P.M 0 2 2 0 1 2 2 11 3 10 5

12 4.00 to 5.00 P.M 0 1 0 2 1 6 2 6 4 13 6

13 5.00 to 6.00 P.M 0 2 4 0 1 2 4 6 4 13 8

14 6.00 to 7.00 P.M 0 0 2 2 1 3 3 5 6 11 9

15 7.00 to 8.00 P.M 0 1 0 1 2 3 2 3 2 11 4

16 8.00 to 9.00 P.M 0 1 1 1 0 3 2 0 0 9 2


TOTAL : 0 16 26 16 20 67 51 81 64 183 115
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Date of Survey :
Total
Animal
Motor
Drawn Motorised
Cycles/Sc Pedestiran
Sl.No Duration Buses Trucks Cars Vans Jeeps Bicycles Carts Except Non
ooters/Tw s
(Bullock Two Motorised
o wheelers
carts) Wheelers

1 2 3 4 6 7 8 9 10 11 12 13 14
1 5.00 to 6.00A,M 0 0 0 0 0 0 0 0 0 0 0

2 6.00 to 7.00 A.M 0 1 2 2 2 15 13 0 0 24 13

3 7.00 to 8.00 A.M 0 1 3 1 1 7 2 2 3 15 5

4 8.00 to 9.00 A.M 0 2 1 3 1 6 2 14 3 15 5

5 9.00 to 10.00 A.M 0 2 2 2 0 5 3 8 5 13 8

6 10.00 to 11.00 A.M 0 0 2 0 0 2 3 5 7 7 10

7 11.00 to 12.00 Noon 0 1 1 0 1 5 2 5 7 11 9

8 12.00 to 1.00 P.M 0 2 3 1 1 3 2 0 9 13 11

9 1.00 to 2.00 P.M 0 1 1 0 1 6 1 2 5 11 6

10 2.00 to 3.00 P.M 0 1 1 0 1 2 3 6 3 7 6

11 3.00 to 4.00 P.M 0 2 2 2 2 5 4 10 9 16 13

12 4.00 to 5.00 P.M 0 1 2 2 0 2 4 4 4 9 8

13 5.00 to 6.00 P.M 0 2 2 1 2 3 2 3 5 12 7

14 6.00 to 7.00 P.M 0 3 3 1 1 5 3 4 8 17 11

15 7.00 to 8.00 P.M 0 0 2 0 1 6 2 5 3 13 5

16 8.00 to 9.00 P.M 0 1 1 0 1 2 2 1 0 8 2


TOTAL : 0 20 28 15 15 74 48 69 71 191 119
1 Traffic Count on Day 0 15 25 15 11 82 52 82 65 185 117
2 Traffic Count on Day 0 16 26 16 20 67 51 81 64 183 115
3 Traffic Count on Day 0 20 28 15 15 74 48 69 71 191 119
AVERAGE TRAFFIC
4 0 17 26 15 15 74 50 77 67 186 117
COUNT

Technical Assistant
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR
Kadapa District

District Kadapa State Andhra pradesh

Days Motorised vehicles Non Total


Motorised
Vehicles

Day 1 232 23 255


Day 2 216 20 236
Day 3 200 30 230
Total 648 73 721
Average 216 24 240

DESIGN OF FLEXIBLE PAVEMENT

ADT of the Year of traffic count ADT = 240


No of Harvesting seasons n = 2

Average daily traffic ( ADT )during non harvesting season = 120


Base year traffic AADT (T) = T+ 1.2 xnxTxt/365

Average annual daily traffic AADT = 150


where n=1 t=75
Assuming initial growth rate of 6 % for 2 years

Before opening of the road to traffic after completion = AADT *(1.06)^2


= 168
Commercial Vehicles Per Day(CVPD)= ADT/4 (As per Appendex A in SP 72 for new roads)
= 60
HCV= 20% of CVPD = 12
MCV= 80% of CVPD = 48

Form the HCV and MCV


MCV = 24 Nos Laden Medium commercial Vehicles
MCV = 24 Nos Un Laden Medium commercial Vehicles
MCV = 0 Nos Over Laden Medium commercial Vehicles
HCV = 6 Nos Laden Heavy commercial Vehicles
HCV = 6 Nos Un Laden Heavy commercial Vehicles
HCV = 0 Nos Over Laden Heavy commercial Vehicles

VDF (Vehicle Damage factor )


Vehicle Laden Un Laden Over Laden
MCV 0.31 0.02 0.34
HCV 2.58 0.31 2.86
Cumulative ESAL applications for 10 years with uniform growth rate @ 6 %

Equivalent Standard Axle Load ESAL = MCVx VDF + HCV x VDF


= (24x0.31+24x0.02+0*0.34) + ( 6x2.58+6x0.31+0x2.86 )
ESAL 25.30 Nos/day

Cumulative ESAL applications N = ESALx4811xL


where L = Lane distribution factor = 1.00 for Single lane

Cumulative ESAL applications N = 121695


Pavement Thickness Design
Design data

Cumulative ESAL applications for 10 years = 121695 Nos / day


Average rain fall = 720 mm / annum
Avg Soaked CBR = 5.60%
Design

Design pavement thickness from IRC SP 72 - 2014 = 300 mm

DY. EXECUTIVE ENGINEER ASSISTANT EXE ENGINEER


PRI SD Pulivendula PRI SD Pulivendula

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATI RAJ, KADAPA PR Division Jammalamadugu
f Pulivendula (M) in YSR

n SP 72 for new roads)

Over Laden
0.34
2.86

TANT EXE ENGINEER


I SD Pulivendula
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR
Kadapa District

Existing surface & Existing Crust thickness Details

Existing Crust Required


S.No Reach Existing thickness in crust in mm Proposed Crust thickness
Surface mm

Badly
1 km 0/0-0/300 Damaged BT 200 300 WMM 100mm thick.
surface

Badly
2 km 0/300-0/600 Damaged BT 175 345 CC 170 mm thick
surface

Badly
3 km 0/600 -1/800 Damaged BT 200 300 WMM 100mm thick.
surface

Badly
4 km 1/800 -2/220 Damaged BT 175 345 CC 170 mm thick
surface

Existing CC in
5 Km 2/220-2/700 Village 300 0
Portion

km 2/700 - Earthen GSB 100 mm , WMM 75 mm & CC 170


6 0 345
2/850 Surface mm thick

Badly
7 km 2/850 -3/650 Damaged BT 200 300 WMM 100mm thick.
surface

8 km 3/650 - Earthen 0 345 GSB 100 mm , WMM 75 mm & CC 170


4/350 Surface mm thick

km 4/350 - Earthen
9 0 300 GSB 150 mm , WMM 150 mm
5/300 Surface

DEPUTY EXE ENGINEER, ASST EXE ENGINEER


PIU SUB DIVN..MYDUKUR PIU SUB DIVN..MYDUKUR
SUPERINTENDING ENGINEER EXECUTIVE ENGINEER
PR, KADAPA PIU DIVN., KADAPA
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa Distric

DESIGN OF CONCRETE PAVEMENTS FOR RURAL ROADS AS PER IRC:SP 62-2013.


Case 1 Only wheel load stress : Case 2 Temperature and wheel load stresses without fatigue: Case 3 fatigue analysis considering load and tem
Case 1: design traffic is <50cvpd Case 2 : traffic is in between 50 to 150 cvpd Case 3 traffic is >150 cvpd
Enter the Data
(without 2 Tyre (1- single/2 - dual) 2 Transverse joint spacing,m
temperature-1/ with temperature 2/with
Temperature Zone (1 to 6) 3 Spacing of wheels Sd (mm) 310 Ratio of L/l

Modulus of the subgrade reaction, k Mpa/m 49 wheel load, P kN 50


Co-efficient of thermal expansion
Elastic modulus of concrete E, Mpa 30000 Tyre pressure, q MPa 0.8 Correction factor C
Poisson Ratio of the concrete, µ 0.15 Radius of contact, a (mm) 180.56482 Design life of pavement, yrs
Temperature differntial, ∆T oC 18.0 Trial thickness, h m 0.17 Rate of increase of traffic
Modulus of rupture of concrete, fcr 4.217 No. of commercial vehicels per day 138 Truck with 50kN Wheel load,%

RESULTS FOR ONLY WHEEL LOAD CONSIDERATION RESULTS FOR WHEEL LOAD AND TEMPARATURE STRESS

Case 1 Case 2
Radius of relative stiffness, l m 711.6123582572 temparature stress at edge, Mpa 0.4922035546
Stress developed, σ, Mpa Wheel load Stresses at edge, Mpa 3.4974019168
Design is Total stresses, σ, Mpa 3.9896054714
Design is Safe

RESULTS FOR FATIGUE ANALYSIS


Case 3
Design No.of vehicles for fatigue analysis 185289.022892269
Stresses due to wheel load,σ, Mpa
Ratio of L/l
Correction factor C
stresses due to temparature,σ, Mpa
negative stress due to nonlinear temparature diffrential,σ, Mpa
Total stress for Fatigue calculation,σ, Mpa
stress ratio
Allowable repetititons
Design is
Cummulative fatigue damage
mgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

MENTS FOR RURAL ROADS AS PER IRC:SP 62-2013.


oad stresses without fatigue: Case 3 fatigue analysis considering load and temperature

3
4.2157783872

0.00001

0.5242393896
20
0.06
10
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa
District
Design of CC pavement
Design parameters
Flexural strength of concrete Fr = 46 Kg/cm2
Design wheel load P= 4100 Kg
Tyre pressure q= 8 Kg/cm2
Poission' Ratio u= 0.15
/
centegrad
Coefficcient of Theramal expansion x= 0.00001 e
Elastic modulus of concrete E= 300000 Kg/cm2
Traffic growth rate r= 0.06
Spacing of contraction joints L= 375 Cm
width of pavement B= 375 Cm
Spacing of expansion joint = 50 M
Subgrade CBR value = 4.0%
Sub base course = Compacted GSB 15.0cm thick
Design life n = 20 Years
Present Traffic = 60 CPVD
Design steps
Modulus of subgrade rection 'k' for given CBR value = 3.5 Kg/cm2/cm
Effect 'k' vale = 4.2 Kg/cm2/cm
Assume thickness, h = 20 cm
Radius of relative stiffness, l = [Eh^3/12k(1-u^2)]^1/4
= 83.54 Cm

Radius of area of contact wheel, a = [(0.8521P/q*PI)+(S/PI)(P/0.5227q)^0.5]^0.5


= 21.17 Cm
a/h= 1.06
Radius of resisting section, b = 19.92 Cm
1) Edge load stress = 0.529P/h^2[1+0.54u][4log10b-0.4048]
= 28.09 Kg/cm2
2)Temperature stress,Ste = CExt/2
Temperature differential values in the region:
Slab
in thethickness,cm
slab in the 15 20 25
region: 17.3 19 20.3

Ratio L/l= 4.49


B/l= 4.49
L/l is more critical and is adopted
For L/l= 4.49 Bradbury's coefficient C= C = 0.58
Ste= 16.45 Kg/cm2
3)Total stress = Load stress+Temperature stress
= 44.54 Kg/cm2
This is less than the allowable flextural strength of 46Kg/cm2. Hence assumed thickness is adequate.
4)Corner load stress= 3P/h^2(1-(a*SQRT2/l)^1.2)
= 21.78 Kg/cm2 < Flextural strength of concrete. Hence design is safe.
Expantion joint spacing
Joint spacing= 2 cm
Spacing of expansion joint Ls= 1/2 joint spacing/100 C (T2-T1)
Ls= 35.7 m
which is less than Maxium specified spacing of 50 m

Contraction joint spacing Lc = 2*Sc*10^4/W*f


Lc= 4.44 m
Which is less than maxium specified spacing of 4.50 m
There fore Provide contraction joints at 4.45 m spacing and expansion joint at every 8 th such joints 4.45x8=35.5 m

DY. EXECUTIVE ENGINEER ASSISTANT EXE ENGINEER


PRI SD Pulivendula PRI SD Pulivendula

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER,


PANCHAYATI RAJ, KADAPA PRI DIVISION, JAMMALAMADUGU
M) in YSR Kadapa

PI)(P/0.5227q)^0.5]^0.5

4log10b-0.4048]
5m
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

21 Design of 1000mm Dia Pipe Culvert in Km 7/043

Width of Stream : 1.25 m


Depth of flow : 0.40 m

a Average Catchment area of local Stream : 6.25 Acres


6.25 x 4046.86 Sqm
25292.9 Sqm
0.0253 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0253 ¾ 0.698 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.698 0.698 Sqm.


1.000
Providing One Vent of 1000mm dia RCC pipe

e Hence provide 1 vent of 1000 mm dia RCC Pipe culverts

f Area Provided = 22/7(1.0)^ 2/4 = 0.785 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 1000mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PRI SD Pulivendula PRI SD Pulivendula

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PR Division Jammalamadugu
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 1000mm Dia Pipe Culvert in Km 2/0-3/0

Width of Stream : 1.25 m


Depth of flow : 0.40 m

a Average Catchment area of local Stream : 5.50 Acres


5.50 x 4046.86 Sqm
22257.7 Sqm
0.0223 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0223 ¾ 0.634 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.634 0.634 Sqm.


1.000
Providing One Vent of 1000mm dia RCC pipe

e Hence provide 1 vent of 1000 mm dia RCC Pipe culverts

f Area Provided = 22/7(1.0)^ 2/4 = 0.785 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 1000mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 1000mm Dia Pipe Culvert in Km 5/0-6/0

Width of Stream : 1.1 m


Depth of flow : 0.40 m

a Average Catchment area of local Stream : 6.20 Acres


6.20 x 4046.86 Sqm
25090.5 Sqm
0.0251 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0251 ¾ 0.693 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.693 0.693 Sqm.


1.000
Providing One Vent of 1000mm dia RCC pipe

e Hence provide 1 vent of 1000 mm dia RCC Pipe culverts

f Area Provided = 22/7(1.0)^ 2/4 = 0.785 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 1000mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 1000mm Dia Pipe Culvert in Km 6/0-7/0

Width of Stream : 1.2 m


Depth of flow : 0.40 m

a Average Catchment area of local Stream : 6.10 Acres


6.10 x 4046.86 Sqm
24685.8 Sqm
0.0247 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0247 ¾ 0.685 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.685 0.685 Sqm.


1.000
Providing One Vent of 1000mm dia RCC pipe

e Hence provide 1 vent of 1000 mm dia RCC Pipe culverts

f Area Provided = 22/7(1.0)^ 2/4 = 0.785 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 1000mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 1000mm Dia Pipe Culvert in Km 7/0-8/0

Width of Stream : 1.3 m


Depth of flow : 0.40 m

a Average Catchment area of local Stream : 6.40 Acres


6.40 x 4046.86 Sqm
25899.9 Sqm
0.0259 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0259 ¾ 0.710 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.710 0.710 Sqm.


1.000
Providing One Vent of 1000mm dia RCC pipe

e Hence provide 1 vent of 1000 mm dia RCC Pipe culverts

f Area Provided = 22/7(1.0)^ 2/4 = 0.785 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 1000mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 1000mm Dia Pipe Culvert in Km 8/0-8/560

Width of Stream : 1.25 m


Depth of flow : 0.40 m

a Average Catchment area of local Stream : 6.30 Acres


6.30 x 4046.86 Sqm
25495.2 Sqm
0.0255 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0255 ¾ 0.702 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.702 0.702 Sqm.


1.000
Providing One Vent of 1000mm dia RCC pipe

e Hence provide 1 vent of 1000 mm dia RCC Pipe culverts

f Area Provided = 22/7(1.0)^ 2/4 = 0.785 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 1000mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 600mm Dia Pipe Culvert in Km 2/0-3/0

Width of Stream : 0.6 m


Depth of flow : 0.25 m

a Average Catchment area of local Stream : 1.80 Acres


1.80 x 4046.86 Sqm
7284.3 Sqm
0.0073 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0073 ¾ 0.274 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.274 0.274 Sqm.


1.000
Providing One Vent of 600mm dia RCC pipe

e Hence provide 1 vent of 600 mm dia RCC Pipe culverts

f Area Provided = 22/7(0.6)^2/4 = 0.283 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 600mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MYDUKUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PIU DIVI KADAPA
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 600mm Dia Pipe Culvert in Km 3/0-4/0

Width of Stream : 0.6 m


Depth of flow : 0.21 m

a Average Catchment area of local Stream : 1.60 Acres


1.60 x 4046.86 Sqm
6475.0 Sqm
0.0065 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0065 ¾ 0.251 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.251 0.251 Sqm.


1.000
Providing One Vent of 600mm dia RCC pipe

e Hence provide 1 vent of 600 mm dia RCC Pipe culverts

f Area Provided = 22/7(0.6)^2/4 = 0.283 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 600mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 600mm Dia Pipe Culvert in Km 6/0-7/0

Width of Stream : 0.6 m


Depth of flow : 0.25 m

a Average Catchment area of local Stream : 1.75 Acres


1.75 x 4046.86 Sqm
7082.0 Sqm
0.0071 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0071 ¾ 0.269 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.269 0.269 Sqm.


1.000
Providing One Vent of 600mm dia RCC pipe

e Hence provide 1 vent of 600 mm dia RCC Pipe culverts

f Area Provided = 22/7(0.6)^2/4 = 0.283 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 600mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
HYDRAULIC PARTICULARS
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District

1 Design of 600mm Dia Pipe Culvert in Km 8/0-8/560

Width of Stream : 0.6 m


Depth of flow : 0.25 m

a Average Catchment area of local Stream : 1.70 Acres


1.70 x 4046.86 Sqm
6879.7 Sqm
0.0069 Sq.Km.
Where C = 11-14, where annual rain fall is 60-120 Cms.
M =Catchment area inSq.Km.
Q = Discharge inCumecs.
Therefore Q = 11 x 0.0069 ¾ 0.263 Cumecs.
c Assumed velocity of flow is (V) = 1.00 Mtrs/Sec.

d Ventage area required = Q/V = 0.263 0.263 Sqm.


1.000
Providing One Vent of 600mm dia RCC pipe

e Hence provide 1 vent of 600 mm dia RCC Pipe culverts

f Area Provided = 22/7(0.6)^2/4 = 0.283 Sqm.

Hence the ventage area provided is greater than the requirement.


Hence safe.
g Provide 600mm dia RCC NP3 class Pipe culverts

DEPUTY EXE ENGINEER, ASST. EXE ENGINEER


PIU SUB DIV., MYDUKUR. PIU, MUDDANUR.

SUPERINTENDING ENGINEER EXECUTIVE ENGINEER


PANCHAYATIRAJ , KADAPA PRI DIVI JAMMALAMADUGU
LONGITUDINAL SECTION

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

SDBC 25mm thick


WMM 150mm thick
GSB 150 mm thick
0/0 4/260 4/715 6/840 6/980

Proposed GSB Gr.III Exisiting W

Proposed WMM Exisiting G

Proposed BT. Exisiting CC

Proposed C

Superintending Engineer Executive Engineer Dy.Exe.Engineer Asst. Exe. Engineer


PR :: Anantapuramu PR PIU :: Penukonda PR PIU Sub Division PR PIU Sub Division
Puttaparthy Puttaparthy
NGITUDINAL SECTION

ripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Exisiting WBM

Exisiting GSB

Exisiting CC Pavement

Proposed CC Pavement
TYPICAL CROSS SECTION
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa District

Shoulder Carriage way Shoulder

1.875 m 3.75 m. 1.875 m SDBC25 mm thick


WMM 150 mm thick

GSB 150 mm thick

Shoulder 150 mm thick


slope 1:2
slope 1:2

7.50m

Proposed Shoulders Proposed GSB

Proposed WMM

Proposed BT.

SUPERINTENDING ENGINEER, EXECUTIVE ENGINEER, DY.EXE.ENGINEER, ASST.EXE ENGINEER,


PANCHAYATIRAJ, KADAPA PR Division Jammalamadugu PRI SD Pulivendula PRI SD Pulivendula
trict

SST.EXE ENGINEER,
PRI SD Pulivendula
2.2 Preliminary alignment investigation
STRIP MAP
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M)
in YSR Kadapa District
Block : Pulivendula District : Kadapa State : Andhra Pradesh
1000

900
Agricultural lands on both sides

Agricultural lands on both sides


800

C3 740-820
Proposed Vented Causeway
Local stream crossing
700

Proposed 1000mm Dia PC C2 620 Water logged portion Proposed


600 CC Road

Water logged portion Proposed


500 CC Road

Water logged portion Proposed


400 CC Road

Water logged portion Proposed


300 CC Road

Water logged portion Proposed


200 CC Road

Water logged portion Proposed


CC Road
100

Water logged portion Proposed


CC Road
Proposed 1000mm Dia PC C1 000 Starting point of the road
Krishnamgaripalli
STRIP MAP

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula (M) in YSR Kadapa
District
Block : Pulivendula District : Kadapa State : Andhra Pradesh

2000

Agricultural lands on both sides

Proposed 1000mm Dia PC C7 1900

Agricultural lands on both sides


1800

Agricultural lands on both sides


1700

Agricultural lands on both sides

1600

Agricultural lands on both sides

Proposed 1000mm Dia PC C6 1507


1500

Agricultural lands on both sides


1400

Proposed 1000mm Dia PC C5 1360 Agricultural lands on both sides

1300

Agricultural lands on both sides

1200

Agricultural lands on both sides


Proposed 1000mm Dia PC C4 1115
1100

Agricultural lands on both sides

1000
dula (M) in YSR Kadapa

Andhra Pradesh

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides


STRIP MAP

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula


(M) in YSR Kadapa District

Block : Pulivendula District : Kadapa State : Andhra Pradesh

3000

Agricultural lands on both sides

2900

C8 2880
Proposed 1 V 6m span Slab Culvert
Agricultural lands on both sides

2800

Agricultural lands on both sides

2700

Agricultural lands on both sides

2600

Agricultural lands on both sides

2500

Agricultural lands on both sides

2400

Agricultural lands on both sides

2300

Agricultural lands on both sides

2200

Agricultural lands on both sides

2100

Agricultural lands on both sides

2000
apuram of Pulivendula

Andhra Pradesh

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides


STRIP MAP

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula


(M) in YSR Kadapa District

Block : Pulivendula District : Kadapa State : Andhra Pradesh

4000

Agricultural lands on both sides

3900

Proposed 1000mm Dia PC C12 3840 Agricultural lands on both sides

3800

Agricultural lands on both sides

3700

Agricultural lands on both sides

3600

Agricultural lands on both sides

Proposed 1000mm Dia PC C11 3500

Agricultural lands on both sides

3400

Proposed 1000mm Dia PC C10 3380


Agricultural lands on both sides

Proposed 1000mm Dia PC C9 3300

Agricultural lands on both sides

3200

Agricultural lands on both sides

3100

Agricultural lands on both sides

3000
apuram of Pulivendula

Andhra Pradesh

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides


STRIP MAP

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula


(M) in YSR Kadapa District

Block : Pulivendula District : Kadapa State : Andhra Pradesh

5000

Proposed 1000mm Dia PC C18 4940 Agricultural lands on both sides

4900

Agricultural lands on both sides

Proposed 1000mm Dia PC C17 4800

Agricultural lands on both sides

4700

Nakkalapalli Village portion


Proposed 1000mm Dia PC C16 4630
4600

Nakkalapalli Village portion

4500

Proposed 1000mm Dia PC C15 4465 Nakkalapalli Village portion

4400

Nakkalapalli Village portion


Proposed 1000mm Dia PC C14 4320
4300

Nakkalapalli Village portion

4200

Agricultural lands on both sides

4100

Agricultural lands on both sides


Proposed 1000mm Dia PC C13 4030
4000
apuram of Pulivendula

Andhra Pradesh

nds on both sides

nds on both sides

nds on both sides

illage portion

illage portion

illage portion

illage portion

illage portion

nds on both sides

nds on both sides


STRIP MAP

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula


(M) in YSR Kadapa District

Block : Pulivendula District : Kadapa State : Andhra Pradesh

6000

Agricultural lands on both sides

5900

Agricultural lands on both sides

5800

Agricultural lands on both sides

5700

Agricultural lands on both sides

5600

Agricultural lands on both sides

5500

Agricultural lands on both sides

5400

Agricultural lands on both sides

5300

Agricultural lands on both sides

5200

Agricultural lands on both sides

5100

Agricultural lands on both sides


5000
apuram of Pulivendula

Andhra Pradesh

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides


STRIP MAP

Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula


(M) in YSR Kadapa District

Block : Pulivendula District : Kadapa State : Andhra Pradesh

7000

Ahobilapuram Village portion

6900

Ahobilapuram Village portion


Proposed 1000mm Dia PC C22 6820
6800

Ahobilapuram Village portion


Proposed 1000mm Dia PC C21 6730 Residential Plots on both sides

6700

Residential Plots on both sides

6600

Residential Plots on both sides

6500

Residential Plots on both sides

6400
Proposed 1000mm Dia PC C20 6385

Proposed 1000mm Dia PC C19 6350 Agricultural lands on both sides

6300

Agricultural lands on both sides

6200

Agricultural lands on both sides

6100

Agricultural lands on both sides

6000
apuram of Pulivendula

Andhra Pradesh

Village portion

Village portion

Village portion
ots on both sides

ots on both sides

ots on both sides

ots on both sides

nds on both sides

nds on both sides

nds on both sides

nds on both sides


STRIP MAP
Name of work: Providing BT road from Krishnamgaripalli to Ahobilapuram of Pulivendula
(M) in YSR Kadapa District
Block : Pulivendula District : Kadapa State : Andhra Pradesh

7050
Proposed 1000mm Dia PC C23 7050

Ahobilapuram Village portion

7000

`
apuram of Pulivendula
Andhra Pradesh

Village portion
Lead charges of 2019-20

Metal Earth, Gravel & Sand pipes 1000 pipes 900 pipes 600
lead Rate lead lead Rate lead Rate Rate
11.30 11.30 extra from 6 to 30 km 11.48 11.48 5.24
9.40 9.40 extra above 30 km

0.5 0.00 0.5 0.00 0.5 238.36 0.5 197.79 0.5 112.84
1 28.30 1 27.40 1 238.36 1 197.79 1 112.84
2 39.50 2 38.40 2 238.36 2 197.79 2 112.84
3 52.70 3 52.70 3 238.36 3 197.79 3 112.84
4 64.00 4 64.00 4 238.36 4 197.79 4 112.84
5 75.30 5 75.30 5 238.36 5 197.79 5 112.84
6 86.60 6 86.60 6 249.84 6 209.27 6 118.08
7 97.90 7 97.90 7 261.32 7 220.75 7 123.32
8 109.20 8 109.20 8 272.80 8 232.23 8 128.56
9 120.50 9 120.50 9 284.28 9 243.71 9 133.80
10 131.80 10 131.80 10 295.76 10 255.19 10 139.04
11 143.10 11 143.10 11 307.24 11 266.67 11 144.28
12 154.40 12 154.40 12 318.72 12 278.15 12 149.52
13 165.70 13 165.70 13 330.20 13 289.63 13 154.76
14 177.00 14 177.00 14 341.68 14 301.11 14 160.00
15 188.30 15 188.30 15 353.16 15 312.59 15 165.24
16 199.60 16 199.60 16 364.64 16 324.07 16 170.48
17 210.90 17 210.90 17 376.12 17 335.55 17 175.72
18 222.20 18 222.20 18 387.60 18 347.03 18 180.96
19 233.50 19 233.50 19 399.08 19 358.51 19 186.20
20 244.80 20 244.80 20 410.56 20 369.99 20 191.44
21 256.10 21 256.10 21 422.04 21 381.47 21 196.68
22 267.40 22 267.40 22 433.52 22 392.95 22 201.92
23 278.70 23 278.70 23 445.00 23 404.43 23 207.16
24 290.00 24 290.00 24 456.48 24 415.91 24 212.40
25 301.30 25 301.30 25 467.96 25 427.39 25 217.64
26 312.60 26 312.60 26 479.44 26 438.87 26 222.88
27 323.90 27 323.90 27 490.92 27 450.35 27 228.12
28 335.20 28 335.20 28 502.40 28 461.83 28 233.36
29 346.50 29 346.50 29 513.88 29 473.31 29 238.60
30 357.80 30 357.80 30 525.36 30 484.79 30 243.84
31 367.20 31 367.20 31 536.84 31 496.27 31 249.08
32 376.60 32 376.60 32 548.32 32 507.75 32 254.32
33 386.00 33 386.00 33 559.80 33 519.23 33 259.56
34 395.40 34 395.40 34 571.28 34 530.71 34 264.80
35 404.80 35 404.80 35 582.76 35 542.19 35 270.04
36 414.20 36 414.20 36 594.24 36 553.67 36 275.28
37 423.60 37 423.60 37 605.72 37 565.15 37 280.52
38 433.00 38 433.00 38 617.20 38 576.63 38 285.76
39 442.40 39 442.40 39 628.68 39 588.11 39 291.00
40 451.80 40 451.80 40 640.16 40 599.59 40 296.24
41 461.20 41 461.20 41 651.64 41 611.07 41 301.48
42 470.60 42 470.60 42 663.12 42 622.55 42 306.72
43 480.00 43 480.00 43 674.60 43 634.03 43 311.96
44 489.40 44 489.40 44 686.08 44 645.51 44 317.20
45 498.80 45 498.80 45 697.56 45 656.99 45 322.44
46 508.20 46 508.20 46 709.04 46 668.47 46 327.68
47 517.60 47 517.60 47 720.52 47 679.95 47 332.92
48 527.00 48 527.00 48 732.00 48 691.43 48 338.16
49 536.40 49 536.40 49 743.48 49 702.91 49 343.40
50 545.80 50 545.80 50 754.96 50 714.39 50 348.64
51 555.20 51 555.20 51 766.44 51 725.87 51 353.88
52 564.60 52 564.60 52 777.92 52 737.35 52 359.12
53 574.00 53 574.00 53 789.40 53 748.83 53 364.36
54 583.40 54 583.40 54 800.88 54 760.31 54 369.60
55 592.80 55 592.80 55 812.36 55 771.79 55 374.84
56 602.20 56 602.20 56 823.84 56 783.27 56 380.08
57 611.60 57 611.60 57 835.32 57 794.75 57 385.32
58 621.00 58 621.00 58 846.80 58 806.23 58 390.56
59 630.40 59 630.40 59 858.28 59 817.71 59 395.80
60 639.80 60 639.80 60 869.76 60 829.19 60 401.04
61 649.20 61 649.20 61 881.24 61 840.67 61 406.28
62 658.60 62 658.60 62 892.72 62 852.15 62 411.52
63 668.00 63 668.00 63 904.20 63 863.63 63 416.76
64 677.40 64 677.40 64 915.68 64 875.11 64 422.00
65 686.80 65 686.80 65 927.16 65 886.59 65 427.24
66 696.20 66 696.20 66 938.64 66 898.07 66 432.48
67 705.60 67 705.60 67 950.12 67 909.55 67 437.72
68 715.00 68 715.00 68 961.60 68 921.03 68 442.96
69 724.40 69 724.40 69 973.08 69 932.51 69 448.20
70 733.80 70 733.80 70 984.56 70 943.99 70 453.44
71 743.20 71 743.20 71 996.04 71 955.47 71 458.68
72 752.60 72 752.60 72 1007.52 72 966.95 72 463.92
73 762.00 73 762.00 73 1019.00 73 978.43 73 469.16
74 771.40 74 771.40 74 1030.48 74 989.91 74 474.40
75 780.80 75 780.80 75 1041.96 75 1001.39 75 479.64
76 790.20 76 790.20 76 1053.44 76 1012.87 76 484.88
77 799.60 77 799.60 77 1064.92 77 1024.35 77 490.12
78 809.00 78 809.00 78 1076.40 78 1035.83 78 495.36
79 818.40 79 818.40 79 1087.88 79 1047.31 79 500.60
80 827.80 80 827.80 80 1099.36 80 1058.79 80 505.84
81 837.20 81 837.20 81 1110.84 81 1070.27 81 511.08
82 846.60 82 846.60 82 1122.32 82 1081.75 82 516.32
83 856.00 83 856.00 83 1133.80 83 1093.23 83 521.56
84 865.40 84 865.40 84 1145.28 84 1104.71 84 526.80
85 874.80 85 874.80 85 1156.76 85 1116.19 85 532.04
86 884.20 86 884.20 86 1168.24 86 1127.67 86 537.28
87 893.60 87 893.60 87 1179.72 87 1139.15 87 542.52
88 903.00 88 903.00 88 1191.20 88 1150.63 88 547.76
89 912.40 89 912.40 89 1202.68 89 1162.11 89 553.00
90 921.80 90 921.80 90 1214.16 90 1173.59 90 558.24
91 931.20 91 931.20 91 1225.64 91 1185.07 91 563.48
92 940.60 92 940.60 92 1237.12 92 1196.55 92 568.72
93 950.00 93 950.00 93 1248.60 93 1208.03 93 573.96
94 959.40 94 959.40 94 1260.08 94 1219.51 94 579.20
95 968.80 95 968.80 95 1271.56 95 1230.99 95 584.44
96 978.20 96 978.20 96 1283.04 96 1242.47 96 589.68
97 987.60 97 987.60 97 1294.52 97 1253.95 97 594.92
98 997.00 98 997.00 98 1306.00 98 1265.43 98 600.16
99 1006.40 99 1006.40 99 1317.48 99 1276.91 99 605.40
100 1015.80 100 1015.80 100 1328.96 100 1288.39 100 610.64
101 1025.20 101 1025.20 101 1340.44 101 1299.87 101 615.88
102 1034.60 102 1034.60 102 1351.92 102 1311.35 102 621.12
103 1044.00 103 1044.00 103 1363.40 103 1322.83 103 626.36
104 1053.40 104 1053.40 104 1374.88 104 1334.31 104 631.60
105 1062.80 105 1062.80 105 1386.36 105 1345.79 105 636.84
106 1072.20 106 1072.20 106 1397.84 106 1357.27 106 642.08
107 1081.60 107 1081.60 107 1409.32 107 1368.75 107 647.32
108 1091.00 108 1091.00 108 1420.80 108 1380.23 108 652.56
109 1100.40 109 1100.40 109 1432.28 109 1391.71 109 657.80
110 1109.80 110 1109.80 110 1443.76 110 1403.19 110 663.04
111 1119.20 111 1119.20 111 1455.24 111 1414.67 111 668.28
112 1128.60 112 1128.60 112 1466.72 112 1426.15 112 673.52
113 1138.00 113 1138.00 113 1478.20 113 1437.63 113 678.76
114 1147.40 114 1147.40 114 1489.68 114 1449.11 114 684.00
115 1156.80 115 1156.80 115 1501.16 115 1460.59 115 689.24
116 1166.20 116 1166.20 116 1512.64 116 1472.07 116 694.48
117 1175.60 117 1175.60 117 1524.12 117 1483.55 117 699.72
118 1185.00 118 1185.00 118 1535.60 118 1495.03 118 704.96
119 1194.40 119 1194.40 119 1547.08 119 1506.51 119 710.20
120 1203.80 120 1203.80 120 1558.56 120 1517.99 120 715.44
121 1213.20 121 1213.20 121 1570.04 121 1529.47 121 720.68
122 1222.60 122 1222.60 122 1581.52 122 1540.95 122 725.92
123 1232.00 123 1232.00 123 1593.00 123 1552.43 123 731.16
124 1241.40 124 1241.40 124 1604.48 124 1563.91 124 736.40
125 1250.80 125 1250.80 125 1615.96 125 1575.39 125 741.64
126 1260.20 126 1260.20 126 1627.44 126 1586.87 126 746.88
127 1269.60 127 1269.60 127 1638.92 127 1598.35 127 752.12
128 1279.00 128 1279.00 128 1650.40 128 1609.83 128 757.36
129 1288.40 129 1288.40 129 1661.88 129 1621.31 129 762.60
130 1297.80 130 1297.80 130 1673.36 130 1632.79 130 767.84
131 1307.20 131 1307.20 131 1684.84 131 1644.27 131 773.08
132 1316.60 132 1316.60 132 1696.32 132 1655.75 132 778.32
133 1326.00 133 1326.00 133 1707.80 133 1667.23 133 783.56
134 1335.40 134 1335.40 134 1719.28 134 1678.71 134 788.80
135 1344.80 135 1344.80 135 1730.76 135 1690.19 135 794.04
136 1354.20 136 1354.20 136 1742.24 136 1701.67 136 799.28
137 1363.60 137 1363.60 137 1753.72 137 1713.15 137 804.52
138 1373.00 138 1373.00 138 1765.20 138 1724.63 138 809.76
139 1382.40 139 1382.40 139 1776.68 139 1736.11 139 815.00
140 1391.80 140 1391.80 140 1788.16 140 1747.59 140 820.24
141 1401.20 141 1401.20 141 1799.64 141 1759.07 141 825.48
142 1410.60 142 1410.60 142 1811.12 142 1770.55 142 830.72
143 1420.00 143 1420.00 143 1822.60 143 1782.03 143 835.96
144 1429.40 144 1429.40 144 1834.08 144 1793.51 144 841.20
145 1438.80 145 1438.80 145 1845.56 145 1804.99 145 846.44
146 1448.20 146 1448.20 146 1857.04 146 1816.47 146 851.68
147 1457.60 147 1457.60 147 1868.52 147 1827.95 147 856.92
148 1467.00 148 1467.00 148 1880.00 148 1839.43 148 862.16
149 1476.40 149 1476.40 149 1891.48 149 1850.91 149 867.40
150 1485.80 150 1485.80 150 1902.96 150 1862.39 150 872.64
151 1495.20 151 1495.20 151 1914.44 151 1873.87 151 877.88
152 1504.60 152 1504.60 152 1925.92 152 1885.35 152 883.12
153 1514.00 153 1514.00 153 1937.40 153 1896.83 153 888.36
154 1523.40 154 1523.40 154 1948.88 154 1908.31 154 893.60
155 1532.80 155 1532.80 155 1960.36 155 1919.79 155 898.84
156 1542.20 156 1542.20 156 1971.84 156 1931.27 156 904.08
157 1551.60 157 1551.60 157 1983.32 157 1942.75 157 909.32
158 1561.00 158 1561.00 158 1994.80 158 1954.23 158 914.56
159 1570.40 159 1570.40 159 2006.28 159 1965.71 159 919.80
160 1579.80 160 1579.80 160 2017.76 160 1977.19 160 925.04
161 1589.20 161 1589.20 161 2029.24 161 1988.67 161 930.28
162 1598.60 162 1598.60 162 2040.72 162 2000.15 162 935.52
163 1608.00 163 1608.00 163 2052.20 163 2011.63 163 940.76
164 1617.40 164 1617.40 164 2063.68 164 2023.11 164 946.00
165 1626.80 165 1626.80 165 2075.16 165 2034.59 165 951.24
166 1636.20 166 1636.20 166 2086.64 166 2046.07 166 956.48
167 1645.60 167 1645.60 167 2098.12 167 2057.55 167 961.72
168 1655.00 168 1655.00 168 2109.60 168 2069.03 168 966.96
169 1664.40 169 1664.40 169 2121.08 169 2080.51 169 972.20
170 1673.80 170 1673.80 170 2132.56 170 2091.99 170 977.44
171 1683.20 171 1683.20 171 2144.04 171 2103.47 171 982.68
172 1692.60 172 1692.60 172 2155.52 172 2114.95 172 987.92
173 1702.00 173 1702.00 173 2167.00 173 2126.43 173 993.16
174 1711.40 174 1711.40 174 2178.48 174 2137.91 174 998.40
175 1720.80 175 1720.80 175 2189.96 175 2149.39 175 1003.64
176 1730.20 176 1730.20 176 2201.44 176 2160.87 176 1008.88
177 1739.60 177 1739.60 177 2212.92 177 2172.35 177 1014.12
178 1749.00 178 1749.00 178 2224.40 178 2183.83 178 1019.36
179 1758.40 179 1758.40 179 2235.88 179 2195.31 179 1024.60
180 1767.80 180 1767.80 180 2247.36 180 2206.79 180 1029.84
181 1777.20 181 1777.20 181 2258.84 181 2218.27 181 1035.08
182 1786.60 182 1786.60 182 2270.32 182 2229.75 182 1040.32
183 1796.00 183 1796.00 183 2281.80 183 2241.23 183 1045.56
184 1805.40 184 1805.40 184 2293.28 184 2252.71 184 1050.80
185 1814.80 185 1814.80 185 2304.76 185 2264.19 185 1056.04
186 1824.20 186 1824.20 186 2316.24 186 2275.67 186 1061.28
187 1833.60 187 1833.60 187 2327.72 187 2287.15 187 1066.52
188 1843.00 188 1843.00 188 2339.20 188 2298.63 188 1071.76
189 1852.40 189 1852.40 189 2350.68 189 2310.11 189 1077.00
190 1861.80 190 1861.80 190 2362.16 190 2321.59 190 1082.24
191 1871.20 191 1871.20 191 2373.64 191 2333.07 191 1087.48
192 1880.60 192 1880.60 192 2385.12 192 2344.55 192 1092.72
193 1890.00 193 1890.00 193 2396.60 193 2356.03 193 1097.96
194 1899.40 194 1899.40 194 2408.08 194 2367.51 194 1103.20
195 1908.80 195 1908.80 195 2419.56 195 2378.99 195 1108.44
196 1918.20 196 1918.20 196 2431.04 196 2390.47 196 1113.68
197 1927.60 197 1927.60 197 2442.52 197 2401.95 197 1118.92
198 1937.00 198 1937.00 198 2454.00 198 2413.43 198 1124.16
199 1946.40 199 1946.40 199 2465.48 199 2424.91 199 1129.40
200 1955.80 200 1955.80 200 2476.96 200 2436.39 200 1134.64
201 1965.20
202 1974.60
203 1984.00
204 1993.40
205 2002.80
206 2012.20
207 2021.60
208 2031.00
209 2040.40
210 2049.80
211 2059.20
212 2068.60
213 2078.00
214 2087.40
215 2096.80
216 2106.20
217 2115.60
218 2125.00
219 2134.40
220 2143.80
221 2153.20
222 2162.60
223 2172.00
224 2181.40
225 2190.80
226 2200.20
227 2209.60
extra for every km beyond 5 km
SSR- 2019 -20 Initial Rates

Labour per Rate 1 60-63 mm size HBG metal (IRC and MORTH)

Mate day (Road SSR) 471.00 W.I with I.T.I day 580.00 2 50 - 55 mm size HBG metal (IRC and MORTH)

Mazdoor day 420.00 painter 2nd Class * day 460.00 3 40-45 mm size HBG metal (IRC and MORTH)

Mason(1st class) day 500.00 painter 1st Class * day 580.00 4 25-27 mm size HBG metal (IRC and MORTH)

Mason(2nd class) day 460.00 Surveyor day 750.00 5 40-45 mm size HG M/C metal (IRC and MORTH)

Blacksmith day 2nd cl 495.00 Asphalt/ Bitumen Sprayer day 460.00 6 19-22 mm size HG M/C metal (IRC and MORTH)
(Road SSR)
7 12-14 mm size HG M/C metal (IRC and MORTH)

8 9.5-11.2 mm size HG M/C metal (IRC and


MORTH)

Blasting charges 70.00 9 5-7 mm size HG M/c metal (IRC and MORTH)

10 2.36 mm to 5mm HBG M/C


Stacking for metal and Stone 11 2.36 mm down and Stone Dust
Stacking for earth, Sand and gravel 12 Gravel
13 Sand for blindage
Mechanicl means Loading unloading 14 40 mm size HBG metal (SS 5)
Loading and Unloading for metal & Stone 104.20 16.40 120.60 15 20 mm size HBG metal (SS 5)
Loading and Unloading for earth,Sand and gravel 52.30 16.40 68.70 16 12 mm size HBG metal (SS 5)
17 10 mm size HBG metal (SS 5)
Manual means Loading unloading 18 Rough stone 300 mm thick (OTG) Revetment

Loading and Unloading for metal & Stone 138.50 69.25 207.75 19 Rough stone 300 mm thick (Granite) Revetment

Loading and Unloading for earth,Sand and gravel 117.00 42.50 159.50 20 Jeddy stone 450-600mm
21 Soling stone 150 mm granite
22 Sand for Concrete
23 Sand for mortar/ plastering
24 Quarry Rubbish
25 1000mm Dia NP3 Class Plain end
26 1000mm Dia Collar
27 900mm Dia NP3 Class Plain end
28 900mm Dia Collar
29 600mm Dia NP3 Class Plain end
30 600mm Dia Collar
31 Binding wire
32 Cement primer exterior grade kg
33 red oxide(lt)
34 Epoxy paint(lt)
35 Synthetic enamel paint- 1st
36 RR masonry stone OTG
37 Water
38 Selected earth
39 Filter media
40 25.4 mm mastic pad
41 12.7 mm mastic pad
42 100mm AC pipe Basic rate
43 Fevicol Adhesive
44 Unitek Fine grade (25 Kg)
45 RR masonry stone (Granite)
46 CR Masonry Stone (Granite)
47 CR masonry stone OTG
48 Bond stones ( 600 x 200 x 200 mm )
49 110mm PVC 6Kgf/cm2 pipe Basic rate
50 Joint filler board 20mm thick as per IS:1838 -
BMT U02
51 Super plasticizer
52 De bonding strip
53 Selent
54 Poly sheet 125 micron
55 Jute rope
399.05

434.30

560.00

899.05

560.00

937.15

742.85

624.75

480.00

293.35
333.00
113.00
510.00
608.00
1016.00
808.00
680.00
156.00

163.80

196.20
90.50
510.00
510.00
84.75
5227.00 Cost of Cement - 3882.00/MT
961.00 Cost of MS Steel - 41500.00/MT
4284.00
770.00
2068.00
385.00
55.00
180.00 building SSR 2018-19 sno 327
121.00SR BMT-J.03
280.00 I&CAD Gates & Hoists
222.00 building SSR 2017-2018 sno 354
171.45
77.00 M 189(b)
55.00 M 163 excluding seinorage
332.00 M012 including blasting & M/c
839.00 Bldg SSR 2016-2017 sno 845
481.00 Bldg SSR 2016-2017 sno 846
253.00
*

240 70 Blasting
274.3 82 Blasting
207
47.60
701.00
735.00

43 1 Kg
8.55 1 mts
53.95 1 Lts
15.25 1 Sqm
8.35 1 mts
Hire/ Usage charges for plant and machinery as per 2018-2019

S.No. Machine Unit Hire charges in


Rs.

1 Dozer ( D50) hour 1546.80


2 Mortor Grader hour 3020.40
3 Hydraulic Excacator hour 2791.60
4 Front end loader hour 1594.70
5 Tipper- 5.0 cum hour 950.30
6 Vibratory roller 8t hour 2736.20
7 Smooth wheeled roller 8t hour 1329.90 power road roller
Water tanker 8KL 945.80
8 Water tanker 6KL hour 655.20
9 Tractor hour 413.60
10 Tractor with rotavator/ grader/ ripper hour 423.60
11 Air compressor 5cmm electric hour 556.50
12 Wet mix plant 60 TPH hour 1679.70
13 Mechanical broom Hydraulic hour 381.80
14 Bitumen pressure Distributor hour 1527.10
15 Emulsion pressure Distributor hour 875.60
16 Hot mix plant - 120 TPH hour 28708.00
17 Hot mix plant - 100 TPH hour 24636.00
18 Hot mix plant - 60 TPH hour 22092.00
19 Hot mix plant -40 to 60 TPH hour 19546.00
20 Paver finisher Hydrostatic with sensor hour 3115.20
21 Paver finisher Mechanical hour 2290.60
22 Hydraulic chip spreader hour 2743.70
23 Tandem Road roller hour 1856.50
24 Pneumatic road roller hour 1515.60
25 Pot hole repair machine hour 903.00
26 Bitumen boiler oil fired hour 223.00
27 GSB Plant 50 cum hour 1279.70
28 Mastic cooker hour 79.50
29 Batching & Mixing plant- 30 cum hour 1310.90
30 Batching & Mixing plant- 15-20 cum hour 1083.10
31 Transit mixer hour 2071.70
32 Concrete pump hour 1508.80
33 Concrete bucket hour 12.90
34 Kerb casting machine hour 671.90
35 concrete mixer/ mixall- 0.28 cum hour 525.50
36 concrete mixer/ mixall- 1.0 cum hour 661.50
37 Concrete paver finisher with 40HP motor hour 3247.20
38 Integrated stone crusher- 100 TPH hour 9755.20
39 Integrated stone crusher- 200 TPH hour 20570.00
40 Generator- 250 KVA hour 2162.60
41 Generator- 125 KVA hour 1543.10
42 Generator- 100 KVA hour 1316.30
43 Generator- 30 KVA hour 1032.00
per
tonne
44 Truck 10t Km 923.70
Truck 10t hour 923.70
45 Road marking machine hour 135.50
46 Mobile slurry seal equipment hour 1261.40
47 Plate compactor hour 59.10
48 Drilling equipment hour 880.90
49 Batching plant 0.5 cum ( 6 Cum/hr) hour 591.40
50 Needle vibrator 40 mm ( petrol ) hour 215.60
power road roller
As per IS 458

NP3 - RCC pipes made by Casting process NP3 - RCC Collars

Barrel
Dia thickness Steel CC qty steel qty Dia
Longi spiral
300 50 0.78 1.53 0.05497787 2.4936 300

450 65 0.78 1.9 0.10516481 2.908 450

600 75 1.18 2.2 0.15904313 3.6440 600

900 100 2.66 11.55 0.31415927 15.596 900

1000 115 2.66 15.7 0.40283072 20.244 1000

1200 125 3.55 21.25 0.52032628 27.35 1200

Min. cement for NP3 pipes = 360 kg/ cum


- RCC Collars

Caulking
space thickness length Steel CC qty steel qty
Longi spiral
16 30 150 0.11 0.22 0.00653137 0.3564

19 35 200 0.15 0.6 0.01436022 0.822

19 40 200 0.23 1.05 0.02080991 1.406

19 55 200 0.33 2.25 0.04122712 2.85

19 60 200 0.33 3.09 0.05006442 3.7908

19 75 200 0.5 5.08 0.07365464 6.1896


CARTING EARTH CERTIFICATE

Certified that the proposed road passes inbetween patta lands and side earth is slushy soils in KM 0/0-

5/3 which is not suitable for widening and rising of road. Hence Selected earth is Proposed in these

reaches.

EXECUTIVE ENGINEER DY.EXE.ENGINEER ASST. EXE ENGINEER


PIU DIVISION, KADAPA PIU SD MYDUKUR PIU SD MYDUKUR

SUPERINTENDING ENGINEER
PR CIRCLE, KADAPA