LIMAK/SAWAED
WPS No: WPS-JR1 Revision:00 Date:01/11/2019- Project: -Jubail Riyadh Water Transmission System (Stations)
PQR No:01 Revision:00 Date: Third Party Agency: Al-HOTY CO.
Code: API 1104/ASME 31.4 Welding Process(es): SMAW COMPANY: SAWAED ENGINEERING
Page:01 Type(s): MANUAL Materials: -API 5L-PSL2-Grade L245/X52/X60
FILLER METAL: (QW-404) Electrode Wire Feed Speed Range: SEE TABLE 01
Spec.No.(SFA):5.5 AWS NO.(Class): A 5.1 Heat input Allowance: SEE TABLE 01
F-No: 04 A-No: - 01
Size of Filler Metals: Root 2.4- Weld Metals: Deposited Thickness WELDING TECHNIQUE: (QW-410)
3.2mm
Hot/Fill/Cap- 4.0-5.0mm Filler Metal
Electrode- E6010/E7018/E7010 Groove: V Groove Stringer/Weave Bead: Strings/Weaves
Brand: Lincoln/Esab/Hyundai Fillet: N/A Orifice or Gas Cup Size: N/A
Consumable Insert: N/A Initial & Interpass cleaning : Brushing/Grinding
Method of Back Gouging: N/A
POSITIONS: (QW-405) No. of Welder: 2
Position of Groove: 45 Degree Time between root and hot Pass: -10 Minutes
Welding Progressions:5G/6G UP Hill /Down Hill--Downhill Multiple or Single Pass (per side): Multiple