Flow Chart Hot Tapping & Stopple Activity
Flow Chart Hot Tapping & Stopple Activity
1
Check Wall Thicknes Existing Pipe Line
2
Check Wall Thicknes Existing Pipe Line
4
Preparation & Fit Up Steel Split Tee
5
Preparation & Fit Up Steel Split Tee
6
Process Welding Split Tee
11
Check & NDT Test By Three Party
After Welding Process
12
Check & Inspection By User
After NDT Test Finish
13
Process NDT Test Finish
14
Process NDT Test Nozel for Equalizer Finish
15
Preparation for Hot Tapping
Check Dimensions OD Cutter Hot Tap
16
Preparation for Hot Tapping
Check Dimensions OD Sealing Element
17
TDW SERIAL 860 HOT TAP MACHINE 4 INCH TROUGHT 20 INCH BORING BAR
TRAVEL 66 INCHI
OPERATING PRESSURE 100 BAR,
OPERATING TEMPERATURE 700 ͦF
18
Preparation for Hot Tapping
Install Hot Tap Machine on the Valve
19
Preparation for Hot Tapping
Install Hot Tap Machine on the Ball Valve
20
Preparation for Stopple Pluging
21
Preparation for Stopple Pluging
Install Stopple Machine on the Ball Valve
22
Preparation for Stopple Pluging
Install Temporary By-Pass Pipe
24
Detail Flow Chart
Hot Tapping & Stopple Pluging.
Subagio
25