0% found this document useful (0 votes)
125 views

Weekly Report21-26 2

Weekly Report
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
125 views

Weekly Report21-26 2

Weekly Report
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 151
SN AKMIDA HOLDINGS SDN BHD PROJECT KVMRT2 SSP (S202) WEEKLY REPORT FOR _EauINS, CiKEBs, Zimeps, LIKEss. FROM 21/10/2019 - 25/10/2019 WP/17/03/115909 SL/19/03/135424 S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT ae UAH/SHWR/S202/KEBS/19-10.Wa/ Effective Date: Code: 202. | Document No. SNAN/SHWR/S202IKEBS/I9-10:W4/ | Rew. Nos 24 a SN AKMIDA HOLDINGS SDN BHD PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH — SERDANG — PUTRAJAYA (SSP) SAFETY AND HEALTH WEEKLY REPORT PROJECT IssuED Aen ZULASYRAF ABDUL KADIR ae MOHD SOLEHIN BIN AZAMI Sustagcuan "| FROM: | 21/10/2019 Wane MOHD AFI2I BIN MOHD GHAZALI | DATE: 551 senapoag + SITE: KEPONG BARU STATION Time: | 0800 HRS - 1900 HRS PREPARED BY: REVIEWED BY: | APPROVED BY: ACKNOWLEDGED BY: MOHD SOLEHIN BIN | MURTADHA BIN : ZULASYRAF BIN | MOHD AFIZI BIN NAME: AZAMI NORMAN FADILSAABAN | "ABDUL KADIR | MOHD GHAZALI position: | STESAFETY Penn, PROJECT prosect | CONSTRUCTION E RECT SUPERVISOR AARAGER DIRECTOR MANAGER MANAGER DATE: 26/10/2019 Pol ro[>014 oll aaloll4 WO/ of 14 LJ S.N AKMIDA HOLDINGS SDN BHD TOO eee Nee REPORT Project z i peer rT Effective Date: Code: $202. | Document No. SNAN/SHWR/S202/KEBS/19-10-W4/ Rev. No 21 | igsyrot9 (Sk z E isk Rating Tolerance High severity and High probability of major injury, disablement or possible fatality. Work must HIGH | cease immediately and additional control measures implemented prior to work commencement. Probability that an incident will occur over time (Over 3 days’ injury) but not as serious as a MEDIUM |, ajor injury or fatality. Additional control measures to be implemented within 24 Hrs. | Negligible risk of injury, but task requires additional control measures to reduce likelihood of LOW | injury (Minor Injury not above 3 days off from employed role) Additional control measures to be specified and implemented within 48 Hrs. Critical Fatality or Major Injury Over 3 day Injury Severity Likelihood Minor Injury First Aid Case Probable Negligible Unlikely to Occur S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT ‘ACTION REQUIRED: Incomplete edge protection railing - no top rail, mid rail, toe board and netting completely cover all the edge. It may expose to falling from height potential hazard. ‘ACTION TAKEN: Permanent rigid edge protection has been completely installed via installation of fagade structure. 1}Pa Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-Wa4/ Rev.No2.1 | Effective Date: 07/09/2019 | COMMENTS & ACTION RISK RATING _| oe no | CATEGORY [ NOT ACCEPTABLE 5 ACCEPTABLE LI nly || TAKEN | BEFORE AFTER YES / NO DATE: 21/10/2015 23/10/2019 [2 [Work at height Neading Edge Protection Fall protection in place Bill MEDIUM tow Yes noo S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 e RISK RATING COMMENTS & ACTION | CATEGORY ACTION listo NOT ACCEPTABLE 32 ‘ACCEPTABLE CI eae al BEFORE a ‘AFTER wm | t | vesyno DATE: 22/10/2019 22/10/2019 2 Void oe | Protection Guard rails | or securely covered HIGH & meoium tow Oo Yes B noo ‘ACTION REQUIRED: Lift pit without toe board and netting, The mid rail also lowered may exposed workers to fall down and get serious injury. "ACTION TAKEN: Lift pit provided with guard rail, toe board, netting and warning sign displayed. Level of mid rail has been increased to prevent any potential of unplanned event. 2|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No.:2.1 __| Effective Date: 07/09/2019 RISK RATING | ACTION COMMENTS & ACTION wim |. | TAKEN CATEGORY Yes /NO_| No NOT ACCEPTABLE C] ‘ACCEPTABLE 52 DATE: 23/10/2019 mf 3__| Scaffolding Designed, | Inspected &Tagged HiGHO meoium 2 low O ves | noo | | DESCRIPTION: | with green tagged. Birdcage scaffolding for M&E works above the escalator at the concourse area has been inspected by the scaffold inspector as per design drawing 31P S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Dacument No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:21 __ | Effective Date: 07/09/2019 fees) RATI Hi COMMENTS & ACTION RISK RATING | CATEGORY ACTION | No NOT ACCEPTABLE ACCEPTABLE wim |a | TAKEN | | YES/NO | DATE: | 24/10/2019 [a Temporary | Works Design available & Compliant with design drawing HIGH O MEDIUM tow O yes noo DESCRIPTION: Temporary loading platform has been inspected by the Temporary Work Coordinator (TWC) as per approved design drawing by PE. Inspection tag, ‘SWL and warning sign displayed at the loading platform structure. 4|Page t | S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:21 | Effective Date: 07/09/2019 RISKRATING | ACTION COMMENTS & ACTION a [w]e] TAKEN Yes / NO CATEGORY f No NOT ACCEPTABLE C1 "ACCEPTABLE DATE: 24/10/2019 5 | Ladder Use. i Short duration | work only, stable and footed, | | Industrial type to | | EN131 or Class 1 | or equivalent | HIGH O mepum | lowO yes noo DESCRIPTION: 1. Workers using vertical ladder with implementation of buddy system, 3 points of contact, not stepping on the last 3 rung, facing the ladder, and 1:4 ratios for vertical adder. Worker at the bottom hold the vertical ladder tightly and stick his both legs at the footing as a stopper to ensure there are no movernent of the ladder. 2. Workers using “A” frame ladder with implementation of buddy system where the upper worker not stepping on the last 3 rung, facing the ladder and fully extend with support of buddy to ensure stability. ‘ SIP S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202, Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ | Rev.No:2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING CATEGORY | neon NO NOT ACCEPTABLE C1 ACCEPTABLE 3 alm L TAKEN - il Yes / NO DATE: 25/10/2019 | l [6 | Mobile | Towers | | Guardrails, Toe boards, correctly brace | High MEDIUM 0 low a ves noo = | DESCRIPTION: 2 mobile scaffoldings & 1 platform scaffolding at the platform area has been inspected by the scaffold inspector as per design drawing. Site personal, internal and external parties got information about the erection of the scaffolding structure from the design drawing. 6|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Distribution Board with safety signage and Person in Charge competency certificate and contact number been displayed. All switch panels are in good condition and well maintained. Project Code: $202 _| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING | CATEGORY | action No NOT ACCEPTABLE 0 ACCEPTABLE aie ire | taken | YES/NO DATE: 25/10/2019 | 7 | Electricity | | Condition, | | Protected, Life risk [Fire Risk | HIGH | menu | towo | | eso | noo | | | | | DESCRIPTION: | | | | | | 7[Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:21 __| Effective Date: 07/09/2019 RISK RATING | ACTION COMMENTS & ACTION ; | TAKEN al YES/NO no| CATEGORY ____noraccerraste O ACCEPTABLE B (pate: | 24/10/2019 8 | Traffic | Management | People & Plant separated, demarked HIGH O | medium O lowO yes noo | DESCRIPTION: 1. Traffic controller (flagman} control the entrance 3 and give signal to the public vehicles when machine go'in and out. x Traffic Management Plan during night work been activated to separated/demarked between machine on the road and the public vehicles. a|Page Generator set provided with shelter, all details and compliances (PIC contact number, ST Certificate, safety signage, DOE Notification, earthing cable, fire extinguisher, and drip tray). 91Pa ] | S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT | Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:21 | Effective Date: 07/09/2019 ‘COMMENTS & ACTION | HISKRATING | CATEGORY / ACTION No NOT ACCEPTABLE C1 ‘ACCEPTABLE B2 nim | oo | TAKEN : _ Yes / NO __| vate: 26/10/2019 9 | Plant& Equipment In good working order& operated correctly? | wigHo | mepium 3 j town vesO noo | | } DESCRIPTION: S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 _| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 COMMENTS & ACTION RISHRATING CATEGORY ASTON No NOT ACCEPTABLE CI _accerraaie wl {a | TAKEN BEFORE AFTER YES/NO DATE: I 70 | Excavations | (Inspected / shoring in place) (Gas. Levels) NOT APPLICABLE AT PRESENT HIGH O | MEDIUM DO | Low 0 ose | ves | noo | ACTION REQUIRED: ACTION TAKEN: | Hee | | | 10 | Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No. 2.1 Effective Date: 07/09/2019 No. CATEGORY COMMENTS & ACTION RISK RATING NOT ACCEPTABLE C ACCEPTABLE DATE: 23/10/2019 ACTION TAKEN YES / NO iL Permit systems (Permit in Place and being followed) Competence person for Gas tester, excavation, Crane operator, shot firer, HIGH MEDIUM O) towO yes | noo DESCRIPTION: Permit to Work |PTW) Station is fully utilized by the site personnel and at the suitable area. It may ease the internal and external parties to checked the related documents such as the valid PTW in the week and daily Pre -Task Talk (PTT). 1[Page =| S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT DESCRIPTION: | all fire extinguishers at chemical storage area, ground floor, concourse and diesel storage area have been inspected monthly basis, no blockage by materials, with sefety signage and in good pressure. | Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:2.1 __ | Effective Date: 07/09/2019 — - RISK COMMENTS & ATION RATING CATEGORY - ACTION No NOT ACCEPTABLE Cl ACCEPTABLE 32 alm || TAKEN - YES/NO DATE: 26/10/2019 [az || Fire Safety | (Fire points, HicH O ) | with MeDiuM © | extinguishers eas & alarm available) vesO noo 12|Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ | Rev. No.:21 | Effective Date: 07/09/2019 COMMENTS & ACTION Gees caTEGORY ACTION NO NOT ACCEPTABLE & “ACCEPTABLE 1) Him L TAKEN, YES/NO DATE: 22/10/2019 zapiojaeie 73) | Safe ‘Access and Egress High MEDIUM & towO ves noo ‘ACTION REQUIRED: safe passage. Motorcycles obstructed the safe access may lead workers to use non ‘ACTION TAKEN: Motorcycles has been shifted immediately from the illegal parking area to the designated parking area. 331° S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Effective Date: 07/09/2029 | Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No.: 2.1 | COMMENTS & ACTION RISK RATING | CATEGORY - ACTION No | NOT ACCEPTABLE 1] ACCEPTABLE [2 alm |e | TAN | : YES/NO | L 22/10/2019 13 (i) | Safe Access and Egress | HIGH meoumO | towO ves noo DESCRIPTION: Safe access at the entrance 3 KEBS free from any obstruction and safety signage also been provided. 14|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No: 2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING ‘CATEGORY ACTION No NOT ACCEPTABLE CI ‘ACCEPTABLE Ed wl |u| TAKEN - YES / NO DATE: 24/10/2019 i: a (No waste build up) (slip trip hazards) / Unsafe Condition HIGH O MEDIUM 2) towO yes noo DESCRIPTION: Housekeeping conducted by PIC to maintain the cleanliness of work place and to avoid from any obstacles. 15|Pag S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Project Code: $202 Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No21 | Effective Date: 07/09/2019 TING COMMENTS & ACTION RISK RAI ACTION eee ere NOT ACCEPTABLE C1 ‘ACCEPTABLE Then —__eFon AFTER HM |b) yes/no DATE: Click or tap to enter a date ane 15 | Lifting | Equipment | (Crane & | Pile Rig) NOT APPLICABLE AT PRESENT MR wepium 0 towO yes noo ‘ACTION REQUIRED: ‘ACTION TAKEN: 16|P age S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No.: 2.1. Effective Date: 07/09/2019 COMMENTS & ACTION rrr seat vy | no | CATEGOR! NOT ACCEPTABLE LI ‘ACCEPTABLE CI wl |u| TAKEN BEFORE AFTER YES/NO DATE: Click or tap to enter a date Clisk or tap to enter a date 16 | Confined space | | NOT APPLICABLE AT PRESENT | HIGH | MeDIUM 1 | | two | | | veo noo | | ACTION REQUIRED: ACTION TAKEN: | | | | 17 [Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Project Code: 5202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No21 | Effective Date: 07/09/2019 COMMENTS & ACTION RISKRATING || category ACTION | No NOT ACCEPTABLE C1 ACCEPTABLE 63 TAKEN | 1 HUM TE] vesyno DATE: 25/10/2019 | [a | | | HicHO Storage of Bakes materials on ves noo DESCRIPTION: workers oass by the area. 1. Temporary storage area at the Entrance 1 KEBS with barricade plastic barrier and safety signage to secure the materials from toppled and hit 2. Schedule waste storage area are in good condition. Safety Data Sheet (SDS) have been displayed for all substances related. Safety signage and fire extinguisher also have been provided. Schedule waste also been labelled according to their codes such as SW410, SW307 and so on. 18 | Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT 18 HIGH O MEDIUM 0 Low O Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-Wa/ Rev.No:21 | Effective Date: 07/09/2019 ] RISKRATING | ACTION COMMENTS & ACTION nw fu | TareN CATEGORY yes / NO NO NOT ACCEPTABLE CJ ACCEPTABLE 25/10/2019 | veso | noo DESCRIPTION: precautions and prohibitions rules at site. Safety signage been hanged at related locations and area such as chemical storage area to aware the workers and site personal about the mandatory PPE to be wear, 19] S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: S202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 =a RISK RATING COMMENTS & ACTION is ACTION No: | CATESORY NOT ACCEPTABLE Ei Tol ‘ACCEPTABLE wl |u| TAKEN BEFORE L ‘AFTER Yes /NO Date: 22/10/2019 i Click or tap to enter a date. 19 | Personal i} | protective | | Equipment. | | | | | | | HicHO MEDIUM & towO yes No ‘ACTION REQUIRED: ‘ACTION TAKEN: Worker carry out hot work activity (welding) without leather apron, leather gloves, and fire curtain due to the work area location exposed to flammable and combustible materials. 20|Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No.:2.1 __| Effective Date: 07/09/2019 COMMENTS & ACTION RISKRATING CATEGORY ACTION No NOT ACCEPTABLE C1 ACCEPTABLE wim |. | TAKEN YES/NO DATE: 26/10/2019 20 | Harmful = Substances | HIGH O MEDIUM 0 | lowO yes O Noo DESCRIPTION: | All harmful substances (chemical, painting & diesel containers) are stored in the storage area which have proper barricades, bars & drip trays, to | prevent from the chemical flowing out in case spillage. Safety Data Sheet(SDS), fire extinguisher, eyewash and safety signage which indicate PPE to be | wear when handling have been hanged outside the store area. | | aap ] | S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No.:2.1 | Effective Date: 07/09/2019 | 7 RISK RATING | ACTION COMMENTS & ATION al | a | TAKEN CATEGORY Yes /NO No. NOT ACCEPTABLE CI ACCEPTABLE DATE: 22/10/2019 [aa Employee Trained and | aware of tasks briefed on. task & | safety | etey | Unsafe | Act HIGH OO MEDIUM C] tow yes Noo | DESCRIPTION: ‘Training of Scaffolding & Temporary Working Platform during Working At Height Campaign has been conducted by Scaffold Inspector Mr Razman | to create awareness on the safety aspects when using Scaffolding & Temporary Working Platform. 22|Page S.N AKMIDA HOLDINGS SDN BHD. i | SAFETY & HEALTH WEEKLY REPORT | Project Code: S202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ [ Rev. No:2.4 | Effective Date: 07/09/2019 ] RISK RATING | ACTION COMMENTS & ACTION TAKEN 4m | * | vesyno CATEGORY = seine No NOT ACCEPTABLE I ACCEPTABLE DATE: 26/10/2019 22 | Supervision i | | | HIGH O | meDIuM 0 tow 0 | ves noo DESCRIPTION: Supervision by CIME PIC, Ms Aina & Mr Apeng during the cables arrangement at the ground floor Entrance 1 to ensure there is no unsafe act & ai 2 unsafe concition. Supervision by senior site supervisor, Mr Samad at the concourse to ensure all workers are in safe condition, wearing proper PPE, no potential hazards and risk nearby, also comply all rules and regulations. 23 (Pag | S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev. No. 2.1 Effective Date: 07/09/2019 TING | COMMENTS & ACTION RISK RA caTecory acrion NO NOT ACCEPTABLE () ACCEPTABLE & alu L TAKEN L YES / NO DATE: 25/10/2019 3 | Welfare facilities HIGH O cent MEDIUM C1 lean, tow O Tidy & oI ves Hygienic noo DESCRIPTION: ‘All welfare facilites such as drinking water dispenser, rest area, portable toilets and surau are clean and in good condition. General workers can use all the welfare during the projects duration 24| Page S.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No.:2.1 | Effectve Date: 07/09/2019 COMMENTS & ACTION RISK RATING CATEGORY jeenee No NOT ACCEPTABLE B ‘ACCEPTABLE CI mle TAKEN BEFORE AFTER | Yes / NO DATE: 24/10/2019 24/10/2019 bee 24 | Public Protection from site operations | HIGH O MEDIUM towO | | ee | | veo ‘ACTION REQUIRE! Opening of plastic barrier (NJB) may exposed the public or outsider to come into the site operations, materials inside the site operation may be steal. ACTION TAKEr Plastic barriers (NJB) have been closed properly, may prevent from the outsider to come into the site operations, also prevent the materials from been steal. 25 | Pa S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.Noi2.1 __| Effective Date: 07/09/2019 fe : ] ‘ACTION COMMENTS & ACTION RISK RATING | TAKEN no | CATEGORY eee Faw ye] _ Yes/No NOT ACCEPTABLE C1 ACCEPTABLE 5 DATE: 25/10/2019 25\i) | Site | Security | HIGH O | mepium C1 ‘ea | tow | | | DESCRIPTION: 1. Implementation of leaving the valid green card CIDB to the security at Entrance 1 KEBS post before enter the site. 2. Security guards at post Entrance 2 & 3 secure any materials, vehicles, machines or person come into and out from site. 26|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KEBS/19-10-W4/ Rev.No:2.1 | Effective Date: 07/03/2019 | action COMMENTS & ACTION BSKRATING | TAKEN no | CATEGORY (oR TE] YES/NO NOT ACCEPTABLE C1 ACCEPTABLE DATE: | 26/10/2019 He 25li) | Site Security HIGH O meoumo | YSO towO DESCRIPTION: Section Controller & Security Guard for CCC has been located at the platform level KEBS to control, patrol and escort the ‘movement of CCCC & CRO workers from station to the viaduct. 27|Page SAFETY & HEALTH WEEKLY S.N AKMIDA HOLDINGS SDN BHD. REPORT Crete | Document No.:SNAH/SHWAYS202/INS/19-20.4/ Rew.Nos 2a | Bree te SN AKMIDA HOLDINGS SDN BHD PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH - SERDANG ~ PUTRAJAYA (SSP) SAFETY AND HEALTH WEEKLY REPORT MANAGER: By: ADIL i FROM: | 21/10/2019 CONSTRUCTION MOHD AFIZI BIN MOHD GHAZALI | DATE: manager Tar Sara SITE: IVANG STATION time: | osoo was 1900 Has paepanepey: | REviewepav: | aPpnoveper: | _AckNoWlEDGED ev ‘AHMAD srTADHA cussion | ow ar an name: | noonzvtrAonunt FAO SAABAN BIN ADNAN ADIL HORMAN ABDULKADIR | MOHD GHAZAL | osmon| aresarerr | SMENAIO 1 orouecr | enoveer | constaucron | + SUPERVISOR MANAGER DIRECTOR MANAGER: MANAGER | DATE: 2/10/2019 apolar] WTA] sitetta | ge fel ea S.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT Project. | | Tacoel 31 | Effective Date: iesda sat | Document No, SNAH/SHWR/S202/JINS/19-10-W4/ _ [Rev Na 21 | oy09019 Risk Rating Tolerance High severity and High probability of major injury, disablement or possible fatality. Work must HIGH | cease immediately and additional control measures implemented prior to work commencement. | mepium | P*0babilty that an incident will occur overtime (Over 3 days injury) but not as serious as major injury or fatality. Additional control measures to be implemented within 24 Hrs. Negligible risk of injury, but task requires additional control measures to reduce likelihood of LOW injury (Minor Injury not above 3 days off from employed role) Additional control measures to | be specified and implemented within 48 Hrs. Severity Likelihood Minor Injury First Aid Case Over 3 day Injury Critical Fatality or Major Injury Probable Possible in time Negligible Unlikely to Occur S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/sINS/19-10-W4/ Rev.No.:2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION Peau AcnON No | CATEGORY NOT ACCEPTABLE Bl (ACCEPTABLE i | Take BEFORE AFTER zi | yes/no DATE: 21/10/2019 26/10/2018 | T | Workat | height | /Leading Edge Protection Fall protection in place HIGH BE medium 0 towO | Yes noo | ‘ACTION REQUIRED: 1)Observe there are missing midrail and toeboard at concourse level. Need to be re-instate back immediately to prevent fal from height. 2)Observed there are no edge protection at lift shaft platform level Need to be install immediately to prevent fall from height. ACTION TAKEN: 1)Midrail and toeboard has been installed due to unsa‘e condition that ‘expose workers to fall from height. 2)Edge protection for lift shaft still ongoing by PIC. | S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ 1 Rev. No.: 2.1 Effective Date: 07/09/2019 Seg NOT ACCEPTABLE & ACCEPTABLE C] aim 8 TAKEN BEFORE AFTER ‘YES/NO DATE | 23/10/2019 26/10/2019 = Void covered High O mepium & towO ves | noo ‘ACTION REQUIRED: 7 | ACTION TAKEN: ‘| 4)Sighted that got opening at Entrance 1 more than 1 Meter deep. 1)Open hole has been barricade by GI Pipe to prevent from incident ‘Open holes need to be barricade by rigid materials to avoid any happen, accident occur due to misplace/moving of holes cover. | 21Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202. | Document No.: SNAH/SHWR/S202/JINS/19-10-Wa4/ | Rev.No.:2.1 | Effective Date: 07/09/2018 T ‘COMMENTS & ACTION Eereains rear INO:| score gone NOT ACCEPTABLE 63 ACCEPTABLE TAKEN [serore C ‘AFTER YES / NO DATE: 22/10/2035 26/10/2019 3 _ | Scaffolding Designed, | Inspected &Tagged Hick O ~ONGOING- MEDIUM towO | yesO } | No & ‘ACTION REQUIRED: ‘ACTION TAKEN: i 1}Observe that Incomplete working platform with no tagging at | intermediate level 4)PIC has been advice due to unsafe condition and waiting for their 2)improper/illegal scaffold working platform at intermediate level need | improvement action. to be remove/repair immediately due to unsafe condition. | S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev. No Effective Date: 07/09/2018 oe ISK RATIN COMMENTS & ACTION ES ANS con no | CATESORY NOT ACCEPTABLE C1 I ACCEPTABLE © ada fo | TAKEN | YES / NO |__| pare: ~_ 23/30/2038 I 26/10/2019 Z ‘4 | Temporary Works Design available & Compliant with design | drawing | HicHO | mepium 0 towO yesO noo ACTION REQUIRED: . 1)UBS dismartling temporary work for concourse level complete with Permit To UnLoad(PTUL) displayed, Red tagged and design drawing. 2}Temporary Work Coordinator (TWC) were supervising his workers dismantling in safe manner and proper way. 4|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Cade: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev.No21 __| Effective Date: 07/09/2019 | RISK RATING COMMENTS & ACTION no | caTeoRT NOT ACCEPTABLE GI T ‘ACCEPTABLE BI BEFORE ‘AFTER DATE: 23/10/2019 ___ 24/30/2039 | ACTION | TAKEN | YES/NO 5 | Ladder Use. Short duration work only, stable and footed, Industrial type to EN131 or Class 1 or equivalent HiGHO | | epium & | low | ‘ACTION REQUIRED: ‘ACTION TAKEN: el | 1)Demage ladder found at concourse area with no rubber footing, It | 1)Damage ladder has been diverted/stored at staff store to avoid workers. ‘may slip when using it and leads to injuries to workers, still using it | S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/39-10-W4/ Rev.No: 21 __| Effective Date: 07/09/2019 r ] COMMENTS & ACTION EEO NS enon no | SATESORY NOT ACCEPTABLE 52 ‘ACCEPTABLE O] wl |u| TAKEN BEFORE AFTER YES/NO |__| bare: 23/10/2019 L 26/10/2018 6 | Mobile Towers | | Guardraits, | Toe | boards, correctly | brace HichO -ONGOING- MeDIum low & | yes | Noo | [ACTION REQUIRED: ‘i "| ACTION TAKEN: | 1)Design drawing need to be display as per actual on site. | a)scaffold supervisor has been advice due to unsafe consftion and waiting 2)The actual on site is 3M height and drawing shown 6M height is not | for his improvement action. acceptable ard lead to confusion to user. 6|Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/IINS/19-10-W4/ [ Rev. Now: 2.4 | Effective Date: 07/03/2018 COMMENTS & ACTION RISKRATING no | CATEGORY NOT ACCEPTABLE ACCEPTABLE CI a lea |e ‘BEFORE AFTER DATE 23/10/2019, 23/10/2018 7 | Electricity Condition, Protected, | Life risk Fire Risk high O MEDIUM & towO ACTION REQUIRED: 2)Temporary lighting using domestic cable and looping at Riser Room concourse area 2)PIC need change to industrial cable and no illegal bypass/looping. 3)Double multiple socket are prohibited to use in MRT line, it may cause overload power supply and cause electrical hazard occur ‘ACTION TAKEN: for workers safety. | TIME PIC has been advice due to unsafe condition and waiting for his improvement action for temporary lighting, 2)Workers surrounding has been advice not using doutle multiple socket ACTION TAKEN YES/NO ves nog 7IPa S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev.Nos2.1 | Effective Date: 07/09/2019 | COMMENTS & ACTION BERATING enon no | CATEGORY NOT ACCEPTABLE O) ‘ACCEPTABLE 5S wl tu | TAKEN YES/NO (DATE: | 24/10/2019 26/10/2038 | 8 | Traffic ln Management | | People & ) Plant | separated, demarked Hick O mepium 0 | towo yvesO noo 1)Safe passageway maintained to separate walkway and machinery on site. 2)Entrance flagman perform his job to control the live traffic using provided whistle and flag due to incoming machineries in site area. 3)Emergency esponse Team Traffic using his car and reflective safety cone to aware public vehicles there are task ongoing at live traffic area, BlPage S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/_ [ Rev. No 21 | Effective Date: 07/09/2019 ] COMMENTS & ACTION | RISKRATING. catecorY ld NO. NOT ACCEPTABLE C1] I ‘ACCEPTABLE [& wiv |. | TAKEN YES / NO DATE: 25/10/2019 25/10/2019 | 9 | Plant& Equipment | In good | working rder8 operated correctly? | HIGH O MEDIUM tow ves noo 3)Operating area must be cordon to avoid unauthorised get in working area and expose to related hazard. 4)Permit Mesin Angkat (PMA) displayed on scissor lift body. 4)Scissor lit has been inspected by Plant and Machinery inspector (PM) proved by Machinery Sticker to ensure Mobile crane fit to be use on site. 2)Operator and Supervisor(PIC) need to counter check and signature at daily checklist to ensure the machinery in a good condition to operate. 91 S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev.No2.1 __| Effective Date: 07/09/2019 [a T TING | COMMENTS & ACTION RIS RA fae INO} eae NOT ACCEPTABLE 2 ‘ACCEPTABLE OI wl |e | TAKEN : BEFORE AFTER YES/NO (Dare: c 25/10/2019 26/10/2018 10 | Excavations (inspected / shoring in place) (Gas Levels) HigHO -ONGOING- MEDIUM B towO ves Noo 1)Opening expose to injury at Entrance 1 need to be barricade using hard barricade to avoid workers or machinery fell into the hole because of unclear vision/lack of awareness for this area. 2)The opening should be barricade immediately to prevent unwanted event happen. ACTION TAKEN: 1) PIChas been advice due to unsafe condition and waiting for their improvement action. 10) Page ‘S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev. Now 2.1 Effective Date: 07/09/2018 COMMENTS & ACTION RISK RATING CATEGORY NOT ACCEPTABLE ‘ACCEPTABLE 0 DATE: 24/10/2019 26/1024019 ACTION TAKEN YES/NO in Permit systems (Permit in Place and being followed) Competence person for Gas tester, excavation, Crane operator, shot fired. Hick O mepium O tow 1)Permit Tc Work (PTW) compliance. Subcontractor PIC applied the Permit to Work (PTW] front page (7Days) WAH (7DAYS) and Hot Work Permit, (Days) for M&E works for Station area, 2)PTW valicity from 24/20/19 to 30/10/19. PTW must have PTW running number which can get when applying the PTW at SNAH office Running ‘number be given by Safety and Health Officer (SHO) of Safety and health Executive (SHE) 3)All box need to be filled and cannot be blank. Either Yes, No or N/A only. ves noo mir S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev.No2.1 | Effective Dete: 07/09/2019 | | COMMENTS & ACTION Recnanns | CATEGORY feat No NOT ACCEPTABLE ‘ACCEPTABLE BD alo. | TAKEN | Yes /NO DATE: ~ 21/10/2039 26/10/2019 (Fire points, High O with | mepium C1 extinguishers | tow 0 Balam — | available) eS noo 1)Observed FE for mobile crane is in a good condition, valid BOMBA Certificate and good pressure. 2)FE was place at proper storage behind of the mobile crane. 12|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-wa/ Rev.No.i2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION | RISK RATING | iaeae | noir reo NOT ACCEPTABLE B@ ‘ACCEPTABLE CI aly | | TaKeN | BEFORE AFTER Yes/No | DATE: 21/10/2018 26/20/2019 LI _| 13 | Safe Access | | and Egress nigh O -ONGOING- MEDIUM 53 tow ves Now | "ACTION REQUIRED: ‘ACTION TAKEN: jObservec that cable roles obstructed at ground level to 1) PiChas been advice due to unsafe condition and waiting for their security/access tower to concourse area. improvement action, 2)Safe access should be smooth and clear from any obstruction for the access incase any emergency happens on site. 13) P S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 1 ) ' ING | COMMENTS & ACTION BISERA one No| CATEGORY NOT ACCEPTABLE T ACCEPTABLE CI Tae dw Poa | TAKEN L BEFORE AFTER, ‘YES / NO DATE: I oi 21/10/2019 24/10/2019 ia Housekeeping (No waste build up) | (slip trip hazards) / Unsafe Condition HIGH O | mepium & | Low O Yes & noO ACTION REQUIRED: "ACTION TAKEN: 1JObserve theta heap of construction waste at concourse level. 4}The construction waste has been clear up stage by stage manually due 2JThe construction waste need tobe remove immediately due to access _| ono loading platform at station area, | | biocked and walkway need tobe clear from any obstruction a anytime. | | sithe waste should be cordon and display temporary waste storage signage |__| te aware surrounding workers 14 | Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Project Code: $202_| Document No.z SNAH/SHWR/S202/IINS/19-10.WA/ Rev. No.2.1 | Effective Date: 07/09/2029 : ] COMMENTS & ACTION ee econ: NOT ACCEPTABLE LI ‘ACCEPTABLE wl |u| TAKEN | ves / NO 2/0/2019 = 26/10/2019 = 5 Equipment (Crane & Pile Rig) | Hic | meoium 2 | .owo ves Noo mame = | si as wom aU! T)Observed lifting gears for mobile crane (chain sling) in a good condition, The tagged shown Test date on 13/9/19 and Expired on 12/10/2020. 2)In MRT line any lifting gears 3" party just valid for 6month after the test date, (12/3/2020) 3)Any lifting gears need to be inspected by Plant and Machinery Inspector (PMI) and been displayed the colour coding 4)For October-December the colour coding is Yellow colour. 15| Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Rev.No.:21 __| Effective Date: 07/09/2018 Project Code: 5202 _ Document No. SNAH/SHWI/S202/IINS/19-10-W4/ 7 K COMMENTS & ACTION S| acnon IND: Es tere NOT ACCEPTABLE LI (ACCEPTABLE CI ww {| TAKEN BEFORE ‘AFTER YES/NO DATE: 21/10/2019 26/10/2019 16 | Confined space | | | NOT APPLICABLE AT PRESENT NOT APPLICABLE AT PRESENT aan | meoium 0 tow 0 ves noo ACTION REQUIRED: ‘ACTION TAKEN: 16| Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/_ Rev.No.:2.1 | Effective Date: 07/09/2019 RISK RATING — COMMENTS & ACTION r aa No | CATEGORY NOT ACCEPTABLE Bd ‘ACCEPTABLE C1 alm | | TAKEN BEFORE AFTER | YES/NO DATE: 22/10/2019 26/30/2019 7 | HIGH oO Storage of -ONGOING- Materials —a low 0 ves 0 Now ‘ACTION REQUIRED: 2)Improper materials stacking at scaffold storage area, materials need to be restacking for site safety at once eliminates hazard related that can harm workers onsite 2JTemporary materials storage need to be cordon to aware any machineries on site from hit the materials. ‘ACTION TAKEN: 1) PiChas been advi Improvement action. -¢ due to unsafe condition and waiting for their a7|P S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 _| Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ [Rev.Noz2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION: RISE RATING CATEGORY ACTION | NO NOT ACCEPTABLE C1) ACCEPTABLE & alu L TAKEN Yes /NO |__[Date: ~ 23/10/2019 [ 26/10/2019 18 | | High O Signage meoum 0 tow yes noo 4 )Safety harness must be worn signage displayed to remind workers which work at intermediate level to wear harness due to non-harness free zone. 2)Access tower scaffold signage’s to aware all workers to register at security and ‘No Smoking” and ‘No eating and Drinking on site’. 3)Electrical hezard and PIC details signage displayed at OB to aware surrounding workers. | 18|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: S202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 COMMENTS & ACH fesienemniesl isnt) NO CATEGORY. NOT ACCEPTABLE & ACCEPTABLE C1 | H L TAKEN BEFORE AFTER, | ‘YES / NO DATE: 25/10/2019 25/30/2019 ! _| 15 | Personal protective Equipment HicHO weoium @ | tow Yes & noo ACTION REQUIRED: ‘ACTION TAKEN: ‘1)Sighted Falsework workers worn damage vest and may leads to ‘1)PIC has change the damage reflective vest for workers safety and as part Unelearison on ste on night cty andmaybe itby machineries on | of workers were 2}Refective vest ned tobe change immesately due to worker's safety. | 19|Pag S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Project Code: $202 | Document No. SNAH/SHW/S202/IINS/19-10-W4/ Effective Date: 07/09/2019 RISK RATING COMMENTS & ACTION et cn Sere i NOT ACCEPTABLE I [ACCEPTABLE 2 ala fu) TAKEN = A YES/NO DATE: 24/0/2019 26/10/2018, 20 | Harmful | | Substances | | | | High O meowum 0 | tow O | | | yes | noo 1)Observe thet chemical storage area in a good condition complete with Chemical Safety Data Sheet (C505) displayed. | 2ichemical storage area should be maintain as good as possible. 20|Page S.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT Project Code: S202, Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev. No. 2.1 Effective Date: 07/09/2019 .TEGORY no | cATEGO! NOT ACCEPTABLE CI COMMENTS & ACTION ‘ACCEPTABLE 0) RISK RATING | DATE: 24/10/2019 ACTION TAKEN YES/NO 21 | Employee Trained and aware of tasks briefed on task & safety etc! Unsafe Act 23/10/2018 High O mepium tow 2)Observe chat Working At Height (WAH) Scaffold, FPP and Falsework Training conducted by SNAH Safety Team. 2)Training conducted at UBS to aware workers about scaffold, Fpp and falsework safety, tagging and related work. 3)It is asa platform for workers awareness/inform workers about WAH dangerous their facing everyday. ayP S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT | Project Code: $202 _ Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev.No:2.1 _| Effective Date: 07/09/2018 = TING iz COMMENTS & ACTION RISK RAY CATEGORY ACTION No 7 NOT ACCEPTABLE C1 I ‘ACCEPTABLE now |e | TAKEN t YES / NO DATE: 21/10/2018 r 26/10/2019 22 Supervision | HIGH O eum 0 | 4 towO | yes noo I 7 | a)Work supervision by Scaffold Supervisor to erect loading platform at station ground level. 2}Temporary Work Coordinator (TWC) supervise his workers dismantling UBS falsework, area has been cordon and at once he asa standby person to aware surrounding workers do not enter the area. 3)SNAH CBS Engineer supervise work to ensure all related job done base on safety manners to avoid unwanted events/accidents. 22| Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 COMMENTS & ACTION asm Ta | No | CATEGORY NOT ACCEPTABLE D ‘ACCEPTABLE hla | & | TAKEN a YES/NO | DATE: = 2ifaopaeis | 26/10/2039 2B HIGH MEDIUM 1 tow Hygienic a yes OO noo 1)Water dispenser provided for workers welfare (drinking water). It will be do maintenances to clean the body after water supply connected to I. 2)Water supply for workers wash their hand/face. 3)Temporary tollet provided with maintenance twice a week 4)Rest area will be relocate under station due to infrastructure work by AZRB. 23 | Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/IINS/19-10-W4/ Rev.Noi21 __| Effective Date: 07/09/2019 COMMENTS & ACTION EAS enon RY no | CATEGO! NOT ACCEPTABLE CI ‘ACCEPTABLE wl {a | TAKEN YES / NO DATE: 21/10/2015 26/10/2039 i il 24 | Public | Protection | from site operations High O meoium 0 tow 0 ves noo | | < a | 1Jobserved concrete barrier hoarding at site entrance in good position and no opening, (Near traffic light KL bound), | | 2)Ail concrete varier close to each other with no space for opening to ensure site and public safety. 24|Page S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/JINS/19-10-W4/ Rev.No:23 | SffectiveDate: 07/09/2019 _ ; [RISK RATING Qn S COMMENTS & ACTION os aelae no | ATESORY NOT ACCEPTABLE LI ACCEPTABLE 3 ali TAKEN 7 | yes/no DATE: 23/10/2039 26/30/2038 a | 25 | Site . | Security High O meoium tow ves noo 1)Security Guard at JS02 asked workers to wrote workers details such as CIDB and company name as a reference in case anything happen on site and as a security Procedures. 2)Door has been installed at access tower to monitor workers in/out for site safety. 3)CIDB need to be leave at security post and temporary past given to all parties either PDP, SC, STAFF and Workers. No exemption. 25 S.N AKMIDA HOLDINGS SDN BHD. Project Code: $202 Document No.: SNAH/SHWR/S202/KESS/19-10-Wa/ No. SAFETY & HEALTH WEEKLY REPORT Effective Dat 07/09/2019 1 SN AKIVIDA HOLDINGS SDN BHD PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH ~ SERDANG ~ PUTRAJAYA (SSP) SAFETY AND HEALTH WEEKLY REPORT SITE: KEPONG SENTRAL STATION Time: | 08001HRS~ 1900 HRS PRouEcT en Prec, | ZULASYRAF ABDUL KADIR - MUHAMMAD SYUKRI BIN HAMDAN es cae FROM: | 21/10/2019 RONAGER | SAIULAZHARBINJARPAR = |OATE: — La=—hoeaa eas PREPARED Revieweo bv: | apPRoveD By: [ACKNOWLEDGED BY: years ___| MUHAMMAD SYUKRI | MURTADHA BIN ZULASYRAFBIN | SAIFULAZHAR oe | BIN HAMDAN, NORMAN: Hieseiaetenns! ABDUL KADIR BIN JAAPAR a | a posmon: | sesarery | SAFETVAND PROMECT prosect | CONSTRUCTION /__surervson cancer | S¥RECTOR | tanacen | wanacen DATE: aonopor | 30 [18 /de4 ailiel4 | aihoter | eaten | SAFETY & HEALTH WEEKLY S.N AKMIDA HOLDINGS SDN BHD REPORT eee 9.1 | Effective Date: Document No. SNAHISHWRYS202/KESS/19-40-44/ Rev. Noi24 | o7agy01g Tolerance | High severity and High probability of major injury, disablement or possible fatality. Work must HIGH | cease immediately and additional control measures implemented prior to work ‘commencement Probability that an incident will occur over time (Over 3 days’ injury) but not as serious as a MEDIUM |. aior injury or fatality. Additional control measures to be implemented within 24 Hrs. ‘Negligible risk of injury, but task requires additional control measures to reduce likelihood of LOW injury (Minor Injury not above 3 days off from employed role) Additonal control measures to be specified and implemented within 48 Hrs. Critical Fatality or Major Injury Over 3 day Injury Minor Injury First Aid Case Severity Likelihood Probable Possible in time Negligible Unlikely to Occur S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 _| Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ | Rev. Now 2.2. Effective Date: 07/09/2019 No COMMENTS & ACTION CATEGORY NOT ACCEPTABLE & T ACCEPTABLE BEFORE I DATE: 26/10/2019, 1 AFTER 26/10/2019 RISK RATING | ACTION TAKEN YES/NO Work at height /Leading Edge Protection Fall protection in place ‘ACTION REQUIRED: ‘ACTION TAKEN: = Provide complete working platform for scimcoat worker = Worker are wearing full body harness when conducting WAH -To provide complete working platform for scimcoat worker -To ensure worker are wearing full body harness when conducting WAH HIGH mepium towO Yes & no O 1) S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ [Rev.No:2.4 | Effective Date: 07/03/2019 qi COMMENTS & ACTION LRISKRATING | CATEGORY ~ ACTION. No NOT ACCEPTABLE CI ‘ACCEPTABLE wim |u| TAKEN a YES / NO 26/10/2019 L 2 Ve Protection Guard rails or securely covered | Hick O meDiuM O towO ves no Description: f | ‘© Observed that open lif pit was provide with barricade to avoid other worker from fall into open lift pit S.N AKMIDA HOLDINGS SDN BHD. | SAFETY & HEALTH WEEKLY REPORT Project Code: $202 Document No.: SNAH/SHWR/S202/KESS/19-10-W4/_ Rev.No:2.1 __| Effective Date: 07/09/2019 = Observed that access scaffold was in good condition and complete with valid green tagging, design drawing and related signages 31 COMMENTS & ACTION Ee aera acran no | CATEGORY GrAREEITASGG ET I "ACCEPTABLE 62 wl || TAKEN YES / NO DATE: 26/10/2019 3. | Scaffolding Designed, Inspected | aTagged HIGHO mepium O towO yes O noo Description: a] S.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT I | © Observed that temporary loading platform was erected as per design drawing and SWL for temporary loading platform wes provided to give other information on max load for temporary loading platform Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No:21 | Effective Date: 07/09/2029 COMMENTS & ACTION RISK RATING caTecorY Beton No NOT ACCEPTABLE OI ‘ACCEPTABLE 52 hale TAKEN yes/no | DATE: 26/10/2089) || | @ | Temporary i Works Design available & Compliant with design | drawing High O mentum 0 tow ves | noo |Description: al S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202, Document No.: SNAH/SHWR/S202/KESS/19-10-W4/_ [Rev Nowa Effective Date: 07/08/2019 No CATEGORY NOT ACCEPTABLE CI COMMENTS & ACTION ‘ACCEPTABLE RISK RATING DATE: 26/10/2019 YES/NO ACTION TAKEN Ladder Use. Short duration work only, stable and footed, Industrial type to EN131 or Class 1 or equivalent Description: hich O mepium O tow ‘+ Workers using vertical ladder with implementation of buddy system, 3 points of contact, not stepping on the last 3 rung, facing the ladder, and 1:4 ratios for vertical ladder. Worker at the bottom hold the vertical ladder tightly and stick his both legs at the footing as a stopper to encure there are no movement of the ladder. ‘© Workers using “A” frame ladder with implementation of buddy system where the upper worker not stepping on the last 3 rung, facing the ladder and fully extend with support of buddy to ensure stability. ves no S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: S202 | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No:2.1 __| Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING T ACTION NO. eee NOT ACCEPTABLE C) ACCEPTABLE Ex) alu L TAKEN, YES / NO DATE: 26/10/2019 L 6 | Mobile — 1 Towers Guardrails Toe | boards, correctly brace HIGH O meDiIuM towO | | | veso ) | | noo | | ~ | Deseription: ‘© _ Observed that mobile scaffold was in good concition and complete with guardrail and toe boards. Inspection tagging and design drawing | available and updated and mobile scaffold was erect as per design drawing. | 6IP S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No2.1 | Effective Date: 07/09/2019 I T COMMENTS & ACTION ee NOWecueere | NOT ACCEPTABLE LI ‘ACCEPTABLE ala {oo | TAKEN | I | YES/NO DATE: | 26/10/2019 Ped | 7 | Electricity | Condition, | Protected, | | Life risk | | | ‘Fire Risk | | | High O | meDIuM | wwo | ves a | noo | Description: F : A al Observed that electrical DB was in good condition and all cable termination was in good coneition. Related signages and PIC contact number was available and displayed | 7 $.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_ | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No:21 __| Effective Date: 07/09/2039 COMMENTS & ACTION cE RAN cTION NOs Carentan NOT ACCEPTABLE [ACCEPTABLE el | TAKEN YES/NO DATE: 26/10/2039 = 8 | Traffic 5 = - Management People & Plant | separated, demarked Hick O eoium 0 low O | ves noo | Description: ‘* Observed that flagman are available and trained to control machinery movement at gate KESS & TPSSE 8) S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev. N Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING pn Noll eres NOT ACCEPTABLE LI ‘ACCEPTABLE 5 ala |. | TAKEN | YES/NO DATE: 9 | Plant & Equipment In good working orders operated correctly? Hick O weoium O towO yes noo Description: ‘* Observed that Mobile Crane SOT being used was inspected and checklist was done prior start of work tp S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/_ Rev.No2.1 | Effective Date: 07/03/2019 COMMENTS & ACTION | RISK RATING | ae NO bral ceaeaal NOT ACCEPTABLE C1 ACCEPTABLE & n\m TAKEN YES /NO DATE: 26/10/2019 oH 30 | Excavations (Inspected / shoring in place) (Gas | Levels) nigh O | medium 0 towO yesO noO | Description: Peer ‘© Observed that excavation area was properiy barricade to prevent others worker from fll into excavation area 10] S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 Document No.: SNAH/SHWR/S202/KESS/19-10-W4/_ Effective Date: 07/08/2019 No| CATEGORY ‘COMMENTS & ACTION RISK RATING | ACTION NOT ACCEPTABLE CI ‘ACCEPTABLE TAKEN Yes /NO 24/10/2019 a ‘systems (Permit in Place and being followed) ‘Competence person for Gas tester, excavation, Crane operator, shot firer HIGH O meoium lowO yes noo Description: ‘© Observed that PTW system are available and updated [Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No:21 __| Effective Date: 07/09/2019 ‘COMMENTS & ACTION LRISKRATING | caTeGoRY Pas No NOT ACCEPTABLE LI ‘ACCEPTABLE BS wim u| TAKEN ee YES/NO (Dare: 26/10/2019 2 Fire Safety (Fire points, Higa O & alarm wel available) ) yes noo Description: Observed that fie extinguisher was available and in good condition complete with inspection tagging and related signages was updated and available. 22 S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202, | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No:2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION es no | CATEGORY NOT ACCEPTABLE CI [ ‘ACCEPTABLE 5 oa TAKEN YES/NO DATE: =i 26/10/2019 Pe 13 | Safe ] Access | and Egress | High | | meoum o tow | | ves | noo DESCRIPTION: ~ Observed that safe passage walkway was regularly maintain and clear from any obstruction BI S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/_ Rev.No2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION RISKRATING CATEGORY ee No NOT ACCEPTABLE I ACCEPTABLE C1 wim |u| TAKEN BEFORE | ‘AFTER | (| yes/no DATE: i 26/10/2088 26/10/2019 1 | : 14 | Housekeeping ] (No waste build up) (slip trip hazards) / Unsafe Condition High O MEDIUM -INPROGRESS- | | towo | | ves 0 | Now | | "ACTION REQUIRED: "ACTION TAKEN: = Need to conduct housekeeping regularly to ensure site cleanliness. = InProgress housekeeping from PIC of work 14| S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No2.1 __ | Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING eee no | CATEGORY NOT ACCEPTABLE Cl ‘ACCEPTABLE 6 a la TAKEN YES/NO 5 | Equipment (Crane & Pile Rig) Hic O meoium 0 low 0 yes noo Description: (Observed that lifting gear was in good condition and 3" party inspection was available and valid as per GS requirements 15]? §.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202, Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev. No: 24 Effective Date: 07/08/2019 RISK RATING COMMENTS & ACTION no | CATEGORY NOT ACCEPTABLE LI “ACCEPTABLE CI we |p | BEFORE ‘AFTER je Click oF tap to enter a date. Glick or tap to enter a date 7 16 | wich NOT APPLICABLE AT PRESENT NOT APPLICABLE AT PRESENT | meoium Oo | towO yes noo | ACTION REQUIRED: ‘ACTION TAKEN: | 16 S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202, | Document No. SNAH/SHWR/S202/KESS/18-10-W4/_ - Rev.No21 | Effective Date: 07/09/2019 COMM ACTON LaseS T NO iCATERORY NOT ACCEPTABLE [1 ACCEPTABLE alm TAKEN: | YES/NO DATE: 26/10/2019 17_| Storage of materials HIGH O meDIUM | tow yes noO \ | Description: ‘Observed that material was properly storage and stacking and area of material storage was properly barricade and signages was provided 171 S.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.; SNAH/SHWR/S202/KESS/19-10-W4/ [Rev.No:2.1 | Effective Date: 07/09/2019 T RISK COMMENTS & ACTION RATING no CATEGORY E d qT a | NOT ACCEPTABLE OI ‘ACCEPTABLE BY Hg lags leew | pate: 26/10/2019) = 38 | Signage a 7 High O meoium 0 ves nog Description: Observed that there was signage of do & don’t to give information and knowledge to worker to ensure worker are working in safely 18 S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | pees Project Code: $202. | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ | Rev. No 2.1 Effective Date: 07/09/2019 | COMMENTS & ACTION een ine aero wo] cATESOR [~~ woraceeprapig mec y |, | TAME | ves /no | _[ DATE: 26/40/2018 | 19 | Personal | protective | Equipment. t | ico | MEDIUM © | tow yes noo DESCRIPTION: Observed that full body harness was in good condition and inspection tagging was available ané updated | | i} | | S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Effective Date: 07/03/2019 Project Code: S202_| Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev. No.: 2.1 COMMENTS & ACTION EISREATING! AcTION no | CATEGORY NOT ACCEPTABLE CI (ACCEPTABLE Bf wiw |u| TAKEN YES /NO DATE: 26/10/2019 aaa 20 | Harmful Substances | acho mepiuM 0 towO ves 0 noo Description: 21 | =” Observed that chemical storage was in good condition and all related document SDS, fire extinguisher, driptray and signage was available hee 201° | §.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT | Project Code: $202, | Document No.: SNAH/SHWR/S202/KESS/19-10-4/_ Rev.No:2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION RISKRATING | | catecony | action No NOT ACCEPTABLE LI ACCEPTABLE | TAKEN | Yes/No |__ [par 25/10/2019 | [21 | Employee | Trained and aware of tasks | briefed on | task & | | safety etc.! | | Unsafe Act mone MeoiuM | | | veso | noo | Weekly Toolbox Meeting was conducted at KESS to brief and give information on related safety issue especially on Authority(DOSH,CID8), | MRT, POP and SNAH requirement by all PIC on KESS and assisted by Site Safety Supervisor ‘Training of Safety on Falsework Awareness been conducted after the weekly toolbox meting to spread awareness on the safety aspects of Falsework to the general workers, at S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202, | Document No.: SNAH/SHWR/S202/KESS/19-10-W4/_ Rev.No:21 __| Effective Date: 07/09/2019 comments acon say No | SATESORY NOT ACCEPTABLE CI I ACCEPTABLE TAKEN | YES/NO DATE: 25/10/2019 He (22 Supervi Ee High O MeoiuM © tow 0 ves NoO | Description: Observed that PIC of work was available to ensure worker are working in safe manner 221? S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT ‘worker are comfortable and secure from any hazard during rest time |= Observed that portable toilet was provided and maintain servicing when full loaded | = Observed that “Surau” was provided to ease worker to do shalat Project Cade: $202. | Document No.: SNAH/SHWRVS202/KESS/19-10-W4/ Rev.No:2.1 __| Effective Date: 07/09/2019 COMMENTS & ACTION ae wo | CATEGORY NOT ACCEPTABLE CI ‘ACCEPTABLE Bi wim fo | TAKEN | * | yes/no DATE: 26/10/2039 | | B | | Welfare | facilities High O Provides MeDIuM 0 | clean, a Tidy & towO Hygienic ee noo | | Description 231 §.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT [ Rev.No:2.1 | Effective Date: 07/09/2019 Project Code: Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ COMMENTS & ACTION SEATS cron no | CATESORY | NOT ACCEPTABLE C1 “ACCEPTABLE BI Pape TAKEN YES/NO DATE: 26/10/2039 = 4 24 | Public || Protection | from site operations | Hig O medium O towO ves noo Description: PrEEEEEEEEHEE (Observed that KESS & TPSS6 was properly hoarding and in good condition to prevent public from trespass into ROW | 241 S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: S202_| Document No.: SNAH/SHWR/S202/KESS/19-10-W4/ Rev.No21 __| Effective Date: 07/09/2019 |] COMMENTS & ACTION [-BiskRATING | RY. | action no | CATEGON NOT ACCEPTABLE C1 ‘ACCEPTABLE 3 ele | TAKEN YES/NO DATE: 25 | Site ‘Security High O MeDIUM 1) tow yesO noo Description: - Observed that security was available on guard post and visitor/worker & security logbook was available and recorded 25|P SAFETY & HEALTH WEEKLY S.N AKMIDA HOLDINGS SDN BHD REPORT Project = a 5 Effective Date: Code: $202 Document No. SHAH SERAERISAE2/ MBSE AEWA! | Rev. No. at | (07/09/2019 SN AKMIDA HOLDINGS SDN BHD PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH — SERDANG — PUTRAJAYA (SSP) SAFETY AND HEALTH WEEKLY REPORT PROJECT ISSUED Pramcer; | ZUUASYRAF ABDUL KADIR in MUHAMMAD SAFWAN BIN MD.YUSOF ee el ~ | From: | 21/10/2019 anaeen SAIFUL AZHAR BIN JAAPAR pare: to, aenopars SITE: METRO PRIMA STATION Time: | 0800 HRS~ 1900 HRS | : is mi pxepareoy) | nevieweosy: | aPprovepey: ACKNOWLEDGED BY: { ( MUHAMMAD MURTADHA BIN ZULASYRAF BIN | SAIFUL AZHAR Name: SAFWAN BIN FADIL SAABAN MD.YUSOF NORMAN ABDULKADR | BIVJAAPAR posmion: | _ STESAFETY SAFETY AND. PROJECT prosect | CONSTRUCTION ° SUPERVISOR HEALTH MANAGER: DIRECTOR MANAGER MANAGER pate: 29/10/2019 ai] roloe4 ast afioleq | ai lolte SAFETY & HEALTH WEEKLY e S.N AKMIDA HOLDINGS SDN BHD. REPORT Project | Code: S202 Effective Date [ Document No. SNAH/SHWWR/S202/MEPS/18-10.W4/— Rev.NO. 24 | SrpgoIg HIGH Tolerance High severity and High probability of major injury, disablement or possible fetalty. Work must cease immediately and additional control measures implemented prior to work commencement. MEDIUM Low Probability that an incident will occur over time (Over 3 days' injury) but not as serious as a ‘major injury or fatality. Additional control measures to be implemented within 24 Hrs, | Negligible risk of injury, but task requires additional control measures to reduce likelihood of injury (Minor Injury not above 3 days off from employed role) Additional control measures to be specified and implemented within 48 Hrs. Probable Possible in time Negligible Unlikely to Occur Severity Minor Injury Over 3 day Critical Likelihood First Aid Case Injury Fatality or Major Injury S.N AKMIDA HOLDINGS SDN BHD | SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ [ Rev.No:2.1 | Effective Date: 07/09/2018 COMMENTS & ACTION RISK RATING ETON wo | ATESORY NOT ACCEPTABLE C1 __ ACCEPTABLE wm |. | TAKEN YES / NO DATE: 22/10/2019 7 | Work at height ‘/Leading Edge Protection Fall protection in place High O meoum O towO vesO noo DESCRIPTION HE | ‘Observe that workers using full body harness and hook off while working at height that using mobile scaffolding Mobile scaffolding with correctly brace, inspection tagging and design drawing provided appa S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT DESCRIPTION ‘Observe that guardrail, netting and toeboard provided ‘Observe netting and toeboard to prevent falling object Do maintain guardrail, netting and toeboard Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-wa/ Rev.No:2.1 __| éffectiveDate: 07/09/2019 COMMENTS & ACTION Risk BAT! ACTION NO CATEGORY: NOT ACCEPTABLE C) ACCEPTABLE alm L TAKEN, YES/NO DATE: 2 Void Protection Guard rails or securely covered HIGH O meoiuMO] | towO ves noo 2ip S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Proj ject Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No.:2.1 _| Effective Date: 07/09/2019 No COMMENTS & ACTION category |— NOT ACCEPTABLE C) ACCEPTABLE ~ [RISK RATING | L DATE: 22/10/2019 ‘Scaffolding Designed, Inspected &Tagged DESCRIPTION ‘Observe that tower access completely with valid green tag, design drawing and was in good condition Workers that are working on top the roof must wear full body harness and hook off High O meoium 0 towO ACTION yes noo 31P S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 Document No.: SNAH/SHWR/S202/MEPS/19-10-Wa4/ Rev. No.:2.1 | Effective Date: 07/09/2019 No ‘COMMENTS & ACTION |_RISK RATING _ CATEGORY NOT ACCEPTABLE BI I ‘ACCEPTABLE C) BEFORE AFTER DATE: 19/10/2019 Temporary Works Design available & Compliant with design drawing "ACTION REQUIRED Observe that staircase falsework no design drawing TWC tagging ‘ACTION TAKEN Falsework is safe to use 23/10/2019 H HIGH mepium 0 Low Falsework with complete inspectin tagging, design drawing and PTL ACTION TAKEN YES / NO 4lp S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No:2.1 __| Effective Date: 07/09/2019 ee = COMMENTS & ACTION RISK RATING | | ACTION vol tenes NOT ACCEPTABLE OI ACCEPTABLE Bf wily || TAKEN YES / NO DATE: 25/30/2019 5 | Ladder Use. Short duration work only, stable and footed, Industrial type to EN131 oF Class 1 or ‘equivalent HIGH O MEDIUM B& Low | ves noo DESCRIPTION ‘Workers using ladder with implementation of buddy system where the upper workers not stepping on last 3 rungs, must facing the ladder and 1:4 ratio ‘of the ladder with support of buddy system to ensure stability | S|Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 | a I NOT ACCEPTABLE ACCEPTABLE CD) wee H|M | L | YES/NO DATE: 21/10/2019 22/10/2019 ae Towers: Guardrails, boards, correctly ee HIGH g tow O Yes & noo 61P S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev. Ni Effective Date: 07/09/2019 isk | | COMMENTS & ACTION RATING | oy NO eee | TAKEN, NOT ACCEPTABLE ‘ACCEPTABLE CI tn |e | ves v0 | DATE: 37/10/2019 22/10/2019 = | | 7 | Electricity Condition, Protected, Life risk Fite Risk HIGH O meDum | g towO | ves noO ‘ACTION REQUIRED ‘Observe that multiple socket has been used ‘ACTION TAKEN DB has been provided to avoid from multiple socket use again 71 S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING | ee re : NG] cameo, NOT ACCEPTABLE ACCEPTABLE Bl alr |u| TAKEN ves /NO DATE: 22/10/2028 (ncaa | & Traffic | Management | People & Plant separated, | demarked HIGH MeDIUM 1) vow yvesO noo : | DESCRIPTION, Observe that flagman are available and trained to control machinery movement at gate MEPS ‘Observe that flagman are controlling the working area from trespass by public or public vehicle | 81 S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 _| Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No.:2.1 __| Effective Date: 07/09/2019 | COMMENTS & ACTION RISK RATING ena NO |e NOT ACCEPTABLE C1 ‘ACCEPTABLE 52 = wieil | TAKEN | YES/NO | DATE: 23/10/2019 9 | Plant & ; Equipment In good working order& operated | correctly? HIGH O epium 0 tow ves noo | DESCRIPTION | Boomlift inspected by PMI Boomlift provided with valid PMA, fire extinguisher, function of beacon light and SWL displayed Boomlifts sefe to use and to wear full body harness and hook off §.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No:21 __ | Effective Date: 07/09/2019 COMMENTS & ACTION AK — aoe no | CATEGORY NOT ACCEPTABLE C1 ‘ACCEPTABLE OD wily lo) TAKEN BEFORE ‘AFTER Yes / NO DATE: Click oF tap to enter a date ick or tap to enter a date. | 10 | Excavations | | (inspected / | shoring in | | place) (Gas | Levels) | N/A N/A High | mepium 11 | tow yes noo | "ACTION REQUIRED: ‘ACTION TAKEN: 101? | §.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | | Project Code: S202 NAH/SHWR/S202/MEPS/19-10-W4/ Rev. No. 2.1 Effective Date: 07/09/2019 | COMMENTS & ACTION RISK RATING | ACTION noir NOT ACCEPTABLE CI ACCEPTABLE TAKEN YES/NO DATE: 24/30/2039 Permit aon ystems = (Permit in a. Place and being followed) Competence person for Gas tester, HIGH O excavation, mepiuM OD a Crane : tow operator, shot firer. | DESCRIPTION Permit system in place for each activity that has been done PTW and NSWP to be apply for night work activity PTW system make it easier to do a checking by internal or external parties. | Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: S202 Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ fev.No:21 | Effective Date: 07/09/2028 no | CATEGORY COMMENTS & ACTION NOT ACCEPTABLE C) "ACCEPTABLE 3 DATE: 2 Fire Safety (Fire points, || with’ extinguishers &alarm available) DESCRIPTION 25/10/2019 Observe that fire extinguisher was in safe to use and in good condition ‘Signages are provided as information on how to use fire extinguisher RISK RATING : | a |m High O mepium C1 vowO ACTION TAKEN YES/NO ves 2I S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No. SNAH/SHWR/S202/MEPS/19-10-W4/, Rev. Nou2.i | Effective Date: 07/09/2018 ] COMMENTS & ACTION |_BiskRATING Acris NOt terre NOT ACCEPTABLE CI ‘ACCEPTABLE BS wily {a | TAKEN zi YES/NO DATE: 23/10/2015. i i | Safe Access and Egress | HigH Oo meoum 3 wowO | eg noo DESCRIPTION | Observe that safe access are in good condition, free from any obstacle and as segregation between pedestrian walkway and moving machinery | 331? =) S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 _| Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No:21 | Effective Date: 07/09/2019 COMMENTS & ACTION [assem TT no] CATEGORY NOT ACCEPTABLE ‘ACCEPTABLE 6 wim |.) TAKEN YES/NO DATE: 23/10/2039 : | 14 | Housekeeping (No waste build up) | (slip trip hazards) / Unsafe | Condition nigh wepium 0 lowO | ves noo DESCRIPTION - Observe that housekeeping has been conducted before , during and after work To keep maintain cleanliness to prevent from unsafe act and unsafe condition 1a |Pag S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No.:2.1 __| Effective Date: 07/09/2018 COMMENTS & ACTION RISKRATING ACTION CATEGORY No NOT ACCEPTABLE C1 ‘ACCEPTABLE CI win {| | TAKEN YES/NO DATE: 15 | Lifting Equipment (Crane & Pile Rig) HIGH N/A N/A mepium lowO yesO noo 351° S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: 202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING etl no | CATEGORY NOT ACCEPTABLE I ‘ACCEPTABLE alm |. | TAKEN BEFORE ‘AFTER YES / NO DATE: Click or fap to entera dale. Glick oF tap to enter a date. 16 | Confined | space N/A N/A HIGH O meDiuM tow vesO noo "ACTION REQUIRED: "ACTION TAKEN: | 16 |? | S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: S202 Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No.:2.1 _| Effective Date: 07/09/2019 RISK RATING COMMENTS & ACTION ae ieee it Peer alm NOT ACCEPTABLE EI ACCEPTABLE he TAKEN BEFORE ‘AFTER YES/NO DATE: 24/10/2019 7 i | HicHO | | Storage a | material ena | low | | ves | | ) noo | | ‘ACTION REQUIRED Observe that improper stacking of material Observe that no demarcation for storage area "ACTION TAKEN 17| S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No2.1 | Effective Date: 07/09/2019 COMMENTS & ACTION eens oe no | CATESORY NOT ACCEPTABLE I ‘ACCEPTABLE B TAKER 1 YES/NO DATE: 22/10/2019 : 18 | Signage = HIGH OD | mepium 0 low 0 ves nog DESCRIPTION Signages provided in each places to show and info all the workers about safety and health issue Signages also shown a picture of do/don't to tell the works of what can do and what they cant do 18 | S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202_| Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No.:21 | Effective Date: 07/09/2019 COMMENTS & ACTION PRSKRATIN Tow | no | CATEGORY NOT ACCEPTABLE ACCEPTABLE Da alm |e | TAKEN BEFORE ‘AFTER | YES/NO DATE: 39 | Personal protective Equipment. HIGH O N/A N/A medium 0 tow yes 0 noo | | "ACTION REQUIRED ‘ACTION TAKEN | l i9}P S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT | Project Code: $202 _| Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ [Rev.No21 | Effective Date: 07/09/2019 COMMENTS & ACTION RISE RATING | AON oleae NOT ACCEPTABLE] ‘ACCEPTABLE 52 a kw TAKEN z YES/NO DATE: 26/10/2019 30 | Harmful Substances High O epium 0 low 0 ves | noo DESCRIPTION Chemical storage provided for any type of chemical that have been use on site Fit FE also provided in case of emergency happen 20| Eee ere ] S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT Project Code: S202_| Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No 2.1 | Effective Date: 07/09/2019 RISK RATING COMMENTS & ACTION 1——————nor acazr a ACTION no | CATEGORY NOT ACCEPTABLE CI ‘ACCEPTABLE TAKEN | YES / NO DATE: 24/10/2019 21 | Employee 5 Trained and aware of tasks: briefed on task & safety etc! Unsafe Act HIGH O meoium tow yes no DESCRIPTION Safety campaign for scaffold, FPP and falsework training and awareness has been done to supervisor and workers aiiP S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev.No.:2.1 __| Effective Date: 07/09/2019 COMMENTS & ACTION RISK RATING CATEGORY ACTION No NOT ACCEPTABLE CI ‘ACCEPTABLE DO racy TAKEN YES/NO DATE: = 22 | Supervision | | | nigh O N/A N/A MeoiuM C1 LowO ves O noo "ACTION REQUIRED ‘ACTION TAKEN | 221? S.N AKMIDA HOLDINGS SDN BHD SAFETY & HEALTH WEEKLY REPORT | Effective Date: 07/09/2019 Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ COMMENTS & ACTION ee eed eae NO eee (One NOT ACCEPTABLE D) ca ‘ACCEPTABLE alm |u| TAKEN I YES/NO DATE: z 23/10/2039 | | B | | Welfare facilities HIGH O Provided, mepium C1 Clean, Tidy tow O & Hygienic ves noo DESCRIPTION ‘Welfare faciities such as surau, water cooler and toitoi provided ‘To maintain housekeeping to prevent from health issue | 23| Page S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Observe tha: hoarding securely protected from outsider to trespassing into the site Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ [Rev.No2.1 | Effective Date: 07/09/2019 ] RISK | COMMENTS & ACTION RATING | ACTION no | CATEGORY : | TAKEN NOT ACCEPTABLE ACCEPTABLE BZ \ ves / - Him {i} “ne! DATE: 25/10/2019 _ : Hf | 24 | Public Protection | from site | operations | | | | Hic O | | MEDIUM Qo tow } ves | | noo | DESCRIPTION | 24 S.N AKMIDA HOLDINGS SDN BHD. SAFETY & HEALTH WEEKLY REPORT Project Code: $202 | Document No.: SNAH/SHWR/S202/MEPS/19-10-W4/ Rev. No.: 2.1 Effective Date: 07/09/2019 COMMENTS & ACTION Eceauns] ae "i = wo | CATESOR NOT ACCEPTABLE ACCEPTABLE Bie TAKEN ves/ No DATE: 25/10/2019 25 | Site ‘Security HIGH O MEDIUM O ow vesO noO DESCRIPTION Secuttyavtabeon post guard vores storiagbookwsiabe snd upéated Machinery movement recorded Security logbook avaiable and updated 251° SN AKMIDA HOLDINGS SDN BHD PROJECT KVMRT2 SSP (S202) VECTOR CONTROL REPORT (ins, Dikess, EIMees, CiKess. FROM 21/10/2019 - 25/10/2019 WP/17/03/115909 SL/19/03/135424 [RefNo | SNAN/VECR/SZO2/KEBS/] TUJUAN KAWALAN, | SEMBURAN ASAP NYAMUK DI KAWASAN STESEN KEBS DI SETIAP PERIMETER UNTUK TUJUAN KAWALAN, ‘SEMBURAN RACUN NYAMUK DI KAWASAN TAKUNGAN AIR STESEN KEBS DI SETIAP PERIMETER UNTUK Soromte- nexus yoacnee nt Pane ee feaeroee VECTOR CONTROL REPORT iienow'Tlouriane cl [gee es wees | PEsTiioe APPLE: ncive —[ACTWEINGREDENT | gang | TOTALQUANTITYOF 1 pepucarion INGREDIENT 2 METHOD a (Ks) | MALATHION 95% DIESEL 1:4 | 4 LITRE FOGGING CAVETTE Soe waren | _saMuaot rouree aac PREPARED BY: REVIEWED BY: ENDORSED BY: NAME: ‘Mohd Solehin Bin Azami | Muhammad Haziq Halqal Bin Nizam (Zulasyraf abdul Kadir POSITION: | Site Safety Supervisor Safety and Health Officer Project Manager Dati 30/10/2019 3] W196 aon Page 1 of 3 i ~~ T refwva SHA VECR/S202/REBS]]— PROJEK MASS RAPIO TRANSIT LALUAN 2: SUNGAI BULOH ~ [OCTOBER/WEEKS, ‘SEROANG ~ PUTRAJAYA (SSP) PACKAGE S202 ‘SifermNa_[sr-008 Revisiontio. [0 R ‘evisionDote | NIA VECTOR CONTROL REPORT evdenDate| Mia Poge. a ATTACHMENTS FOR FOGGING ACTIVITY PHOTO 1: FOGGING AT KEBS PHOTO 2: FOGGING AT KEBS PHOTO 3: FOGGING AT KEBS PHOTO 4: FOGGING AT KEBS Page 2 of 3 fej Swan NECRTS20276EB5)] PROIEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH — ocroserywveeks SSERDANG ~ PUTRAJAYA (SSP) PACKAGE $202 “SiFormtta._| S008 Revisionno. [0 VECTOR CONTROL REPORT fosinoete NA [roge 13 ATTACHMENTS FOR LARVAECIDING ACTIVITY PHOTO 1: LARVAECIDING AT KEBS PHOTO 2: LARVAECIDING AT KEBS PHOTO 3: LARVAECIDING AT KEBS PHOTO 4: LARVAECIDING AT KEBS Page 3 of 3 Rejo. Swan NECRS 2027S] PROJEK MIASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH ~ seprwa SERDANG ~ PUTRAJAYA (SSP) PACKAGE 5202 “SiFomna_[ 36-008 evisionNo, [0 evisionbare | NTA VECTOR CONTROL REPORT Rewsacoote| Nia lees as Poge 13. DATE: 25/10/2019 TIME: FROM: 1500 HRS TO: 1900 HRS INS () KEBS () MEPS () KESS (xX) PESTICIDE APPLIED: ACIE | ACTWEINGREDENT| ng TOTAL QUANTITY OF | APPLICATION INGREDIENT 2 SOLUTION APPLIED (L/KG) METHOD SuMITHON Lao | DIESEL Somat euree Fosains LAVETTE SOOE WATER 10ML/10L 10 LITRE LARVACIDE Aecomtnonon: ~ SEMBURAN ASAP NYAMUK DI KAWASAN STESEN KESS DI SETIAP PERIMETER UNTUK TUJUAN KAWALAN. - SEMBURAN ASAP NYAMUK DI KAWASAN STESEN TEMPAT PENYIMPANAN BARANG SEMENTARA DAN REBAR YARD - SEMBURAN RACUN JENTIK-JENTIK DI KAWASAN STESEN KESS DI SETIAP PERIMETER UNTUK TUJUAN KAWALAN. PREPARED BY: ENDORSED BY: wi SIGNATURE: ie ‘Muhammad Syukri Bin | Muhammad Haziq Haiqal Bin, Bilas Ava Ke Hamdan Nizam POSITION: Site Safety Supervisor Safety and Health Officer Project Manager DATE: 25/10/2018 W®lwhary Lfofia Page 1 of 3 cas [Reto ‘SNARIVECR/S202/E55 PROIEK MASS RAPID TRANSIT LALUAN?: SUNNGAY BULOH~ sertjwe SERDANG -PUTRAIAYA(SSP) PACKAGES202 | SHFOrnifla | S-004 ReisionNo [0 RevisionDote | NIA = VECTOR CONTROL REPORT Seiionbate | Mla Page 3 ATTACHMENTS FOR FOGGING ACTIVITY : FOGGING AT KESS PHOTO 2: FOGGING AT KESS Page 20f 3 PROIEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH — SERDANG — PUTRAIAVA (SSP) PACKAGE 5202 VECTOR CONTROL REPORT feta. ‘SHARIVEGR/S202/RES5)] serps “Siformno._[sf.008 Revisiontio. | 0 ‘eviionDote | NIK ATTACHMENTS FOR LARVACIDING ACTIVITY PHOTO 2: PHOTO LARVACIDING AT KESS LARVACIDING AT KESS Page 3 0f 3 Fei No. ‘SAR /VECR/STON RES] Senoaverumava sn pacracestr | Femi | e008 Revision Date | N/A VECTOR CONTROL REPORT espana | OEE re 18 pare: | 24.102019- 1HuRsoay | a: row: 3800H%s | T0:3900 HRS vocarion: | xeas PEsTINDE APPLIED: ACTIVE |ACTIVEINGREDEINT| pang | OYALQUANTITYOF | pppucarion INGREDIENT 2 | METHOD (UKG) MALATHION 5m | DIESEL 14 ure roses aecoMmenognion: ‘SEMBURAN ASAP NYAMUK DI KAWASAN STESEN KEBS DI SETIAP PERIMETER UNTUK TUJUAN KAWALAN. PREPARED BY: REVIEWED BY: ENDORSED BY: ye NAME: | Mohd Solehin Bin Azami | Muhammad Hazlq Halgal in Nizam (~Zulasyrat Abdul Kadir POSITION: ‘Site Safety Supervisor ‘Safety and Health Officer Project Manager DATE: 24/10/2019 Ay \o 04, aon Page 10f3, ej. ‘SHAAN ECR/S202/REO5/] PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH ~ locroseRWeeKd SERDANG ~PUTRAIAYA (SSP) PACKAGE S202, | SHiFormi¥o. | SF-008 il fe 0 Revsionbate | WIA VECTOR CONTROL REPORT even Dat | BOA Page. 2 ATTACHMENTS FOR FOGGING ACTIVITY PHOTO 1: FOGGING AT KEBS ~ | PHOTO 2: FOGGING AT KEBS PHOTO 3: FOGGING AT KEBS PHOTO 4: FOGGING AT KEBS Page 2 of 3 alto. Swan NECRTSI0RTREBST] PROJEK MASS RAPIO TRANSIT LALUAN 2: SUNGAI BULOH — ocrosenweek é SERDANG~PUTRAIAYA (SSP) PACKAGE S202 | Siform@lo._| SF-008 evsionnvo._[ 0 Revision Date | WA VECTOR CONTROL REPORT a ee E esessnasesnsensvenae "72 ATTACHMENTS FOR FOGGING ACTIVITY ba phil @ eae Phewelie mite PHOTO 6: FOGGING AT KEBS PHOTO 7: FOGGING AT KEBS PHOTO 8: FOGGING AT KEBS Page 3 of 3 SECS DOD REBT] J PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH — suLyw 'SEROANG ~ PUTRAJAYA (SSP) PACKAGE 5202 ‘SifornNa. | #004 ‘RevisionNo._[ 0 RevisionDote | NA VECTOR CONTROL REPORT Hesdondete | Na Page. 3 Date: 21.10.2013 MONDAY | TIME: | FROM: 1800 HAs | To: 1900 HAs tocation: | sivs(x) EBS () | naers | KESS () | | PESTICIDE APPLIED: [active Active aa TOTALQUANTITY OF | APPLICATION INGREDIENT | _INGREDEINT2 SOLUTION APPLIED (Y/K6) | _ MeTHOD MALATHION ale DIESEL aa BuTRE rogaine RECOMMENDATION: UNTUK TUJUAN KAWALAN, = SEMBURAN ASAP NYAMUK DI KAWASAN STESEN JINS DI SETIAP PERIMETER UNTUK TUJUAN KAWALAN. - SEMBURAN ASAP NYAMUK DI KAWASAN TEMPAT PENYIMPANAN BARANG SEMENTARA DAN REBAR YARD. - SEMBURAN ASAP NYAMUK DI KAWASAN SEKITAR JINS DI SETIAP PERIMETER, BILIK DAN RUANG BLOCKWALL PREPARED BY: REVIEWED BY: ENDORSED BY: ‘Ahmad Noorzulfadhulih NAME ai ata a ‘ulasyrat Abdul Kali Site Safety Supervisor | Safety and Health otier ree anager 24/10/2019 [3 [iol oan, allen Page lof 3 z Teta | SHARCRTSOREST PROIEK MASS RAPIOTRANSITLALUAN 2: SUNGA BULOM ~ mya SERDANG PUTRAIAYA SS) ACKAGE Sao2 | Sfornfa_|S.008 evento [0 e esndute [RR VECTOR CONTROL REPORT ‘IssveDote | 01/07/2019 rege 13 ATTACHMENTS FOR FOGGING ACTIVITY (21/10/19) PHOTO 1: FOGGING ATJINS PHOTO 2:FOGGING AT JINS PHOTO 3:FOGGING AT JINS PHOTO 4:FOGGING AT JINS Page 2 of 3 PROJEK MASS RAPIOTRANSITLALUAN 2: SUNGA!BULOH S ¥ SERDAING~PUTRAVAYA SSP) PACKAGE S202 VECTOR CONTROL REPORT Rejno. ‘SHAR NECRTSO0RTREEST] wn ‘Sifemna_| S008 "| RevsionNo. [0 Resionbote | w/a lesveDote | 01/07/2019 Poge. 2 : FOGGING AT JINS. PHOTO 7: FOGGING AT JINS PHOTO 8: FOGGING AT JINS Page 3 of 3 SN AKMIDA HOLDINGS SDN BHD PROJECT KVMRT2 SSP (S202) WEEKLY TOOLBOX SUMMARY ALMINS, CikeBs, LIMES, EIKESs. FROM 21/10/2019 - 25/10/2019 WP/17/03/115909 SL/19/03/135424 SN AKMIDA HOLDINGS SDN BHD TOOLBOX TALI fi JPROWEK IAS RAPID TRANSIT LALUAN2: SUNGAI BULOH~ SERDANG -PUTRAJAYA (38P) Protect ]PACiAGE S202: CONSTRUCTION AND COWPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED |ORKS AT KEPONG SENTRAL, METRO PRINA, KEPONG BARU AND IIKIANG. oroup otters | TRuarAnG OoaeeeRS boc. Ret. No. [ swanistmrrzszearerizot8- bocetion yeoy lose Bale (4 Safety Topics Wo. ‘Aendanco List Signature 2 Aen Rapag @ Figiene 7 9 Borcates,Sgregoand | @ iting Opertons Sionbeard 9 Mectinery Works ; © Chemicals ending 8. Manval Hensing |_ 2 cD 2 Pecrittouerk ; 9 Eerphg 1 Personel Prteeve @. Einergenay Contact Eeupment 7 «Emergency Tools & SéfoAasses i 9 Ervccamental sues © Seltylaspecion Fj 8 Bcsvation Worn 8. Trefle contol 8 EyaProecion 1 Ursa Act & Conon Hereeplay 8 Others (Please Speci): 12 Housekeeping dt 18 Working Procedure PEP ee AACHEN] Jo Centicing Aathtis © eon E 0 Hazard ndenfeaten Pan tame Femilos SF Fett as ots ty ta vee ‘| ® kag ly o teatime outline © tet Or ptig e Chae @ tment atvenes f ® Saesittiney | Patovences © hese nacer Supt : ttont oom eit o tata nes o wueaatnege : : oer spare ote fete eaten, Ss 5 finns o Weteanearvaer | © | ‘ eens : rath: Pp 2 tytn svig © eal ay Abeter_Arncnvent] — a © tes one E ‘a Manual Ling i” es . © ener Can a SNAHISHIMRT2529] Reta, 2IMLBT2018- f]|_ PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI |'SHiFomilo | SF-003-2 IBULOH -SERDANG — PUTRAJAYA (SSP) PACKAGE $202} RexisianWo. [0 JF WA CAMPAIGN -SCAPFOLD FPP, PALSeuetH RovisionDate | NIA a in | ‘4 TOOLBOX TALK Tan Dla NO. NAME OF PARTICIPANTS: ~ SIGNATURE VIMd Maint Hara nf | 2 [Am RUL *_ 3 [MDi PsdlDamoan ae Ose] 4 | Ailey oe s_| Kuen, . = t | 2ARle ; 1 [est pene «| Ripon ML 4 CR ear we [PBR : ae [MO PALL f v [Bahan eee > wl MD AVA, we [M i w [den MIR ve | SAUE DAL & Cg | HEC SESHU | Os = « ae f SGa.0 ve | U : ROS a | Sulla iP i _ | a— : * ee esa ede UMD NT RUT TTTs|YeeNnESATTT [73 pes ae7 ey z 7 an ww [ 1p a Here re BU x | ROK a i z Ae | * f ; erie Le tanip SecA oa [oe [EVA he : A _| REZACL | 30 | AM Ay SNe [gouste R - 7 ba | Sao rs acestisTeEE EET STITT == gate 3 | COOPUN S| 27 : =a ee vag WI APEPAR FS) 4 Nh x i bb oie aes Ty fl SH AKMIDA HOLDING SDN SHD ATTENDANCE FORM PROJEK MASS RAPID TRANSIT LALUAN 2 ‘SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PAGICAGE S202: CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHERS ASSOCIATED WORKS AT KEPONG SENTRAL, METRO PRIMA, KEPONG BARU AND JIMJANG. TLE: Werhly Toolboy wresting (way CAMPAIGN = SCAPPOLD , PrP, PALEEU ORY. DATE 1 _2+#/10/S01q TIME: 0600 /F.00am, VENUE 4so4 / dws NO NAME DESIGNATION | COMPANY | CONTACTNO, | SIGNATURE 1 | Azam Arman S65 Ase 7 2 | ABO MUP _WAKIEL Migs Pet al 3 | Ra Fanlih DOT fi G |S%fp MWuanman syste rR Ps £ | EAajol Mi DARkv rn peas LC [Ha SA YD, kai 2 1SRA Ee 7 AEX oO LASARFUL AL Za Mt Ayre paekviu: rien L | gam alo kin ARTO! em WAE2ZA $V i 1 Tsuneo NOOR UU EADIE a SS Sway Lt Rei BY | erovck mass RAPID TRANSIT LALUAN 2: SUNGAL Bh [ios rtara an race er TOOLBOX TALK t 1 ATTACHMENTS: PHOTO 4 __ PHOTO 3 PHOTO 4 ae ‘SNAHISHIMART2S20 2NVLBT/Z018- PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI_ |"SHiFonmflo. | SF-003-2 BULOH -SERDANG ~ PUTRAJAYA (SSP) PACKAGE $202|-Rovisiontio [0 RovisionDate_| NIA TOOLBOX TALK TssueDato i Pago | ART. ‘Weekly toolbox meeting at JINJANG STATION MONDAY (21/10/2019). -Start with doa’ and exercise. Safety Awareness - safety everyone responsibilty Security - Must register at security post and record at logbook Security checking for C1DB. Securing of materials. Suspects of a stolen case that has been arrested by police. -KVMRT passport - Must register to KVMRT passport and attend Blue Card Training. -Grey Card - to attend related Grey Card training. -Material arrangement - not blocking access. -Housekeeping before, during and after work to be maintain, and practices. -COMBI - Search & destroy. Everybody responsible. -Rest area - rest at designated rest area, if workers rest on illegal rest area will get penalties. -WAH to comply on safety requirements. Scaffold awareness - to comply on safety requirements. No smoking on site/ROW.. -Smoking at designated smoking area or get penalties. -Plastic bag for food and drink are prohibited on site, Use tupperware/container for food and drink or get penalties. -Safety campaign(WAN) - Scaffold, Fpp and Falsework Training & Awareness. Participant: Ahmad SSS SNAH, Afizi CM SNAH, Nizam PE SNAH, Nazirul SV SNAH, John SHM SNAH, Jaa Operator SNAH, Azam SSS AZRB, Hakimi Fkh, Rizal Darkutni ‘SN AKMIDA HOLDINGS SDN BHD Gin. TOOLBOX TALK ose was s RAMO TRANSIT LALUAW 2: SUNG BULON —SERDANG -PUTRAIAYA SP) rect PACKAGE Satz, CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHER ASSOCIATED lori AT KEPONG SENTTAL, METTOPA, KEPONG BAY iD IMJANS mop crvoners [SAKINA WOLONG &SUBCON [bos Rel No. | SNAIVGNRURTZSaG2TITKERS 078 lection EPONG BARU STATION ae 22/10/2014 safe opie wo ‘Atendance List ‘Slate Raa Raina = Rae © Sanisien Sorgen | o Utgoonatins §— | 1 | SOIL es cw 2270/2019 Sioa Machin Wate < o.Cremtals Honing 77 Waal oing 2 [BABI > cos © emia wo 70D © aoa © pomnatPraccie — | 2 (MAM (A~ Ye 1b Emergency Contact Equpmert 7 tab 3. Bloor SHR | © rereney Tose Sate Access © Envronmenta eaves © Batty nspaction ; Za © Semveton Woe ete Cont 5 MD-NOBIRY © ye Preecon © Unsale c & Conson tener © owe oeseespey: | ° | MOM V2 ng Le Hvseteeing - aaah —— 0 Working Procedure Li md: 2 © Contin paves = coma 2 [Aw WL Qos | 2 aad ndntteaton Pan 5 0 Potent Hazards n 9 Biohazard 0 Hitby Site Vehicle * 2 Beting tly © Uptiiegiears | & Bard unr arta © brea! O1spoge o chemical © Movement otWates |, © Golape tMachney | Pubes 2 Diese necton © Shop Tots " [pe Fat ton tem Sin troarats © Patio Tenens © Workng art ie oof Spas, © Working mee eh © Foot Pinte cates . Henin Haas ering mar Water © Het Stesses © Ober (ease Speain: |, 2) tty Mctine Sing | Je ecto See "i 6 Nae ening & Manat tng © Environmental Concern = 2 conduct 8 checked By A bang mens orate azaial wre UNH EO Nota OYE locsgnaion. SITE SAFETY SUPERVISOR Designation Moen 2 \iocaw lyeeute~ 2 |sebaa Form Nor Fans Revision oro el frie [SMART] ee PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI | sHFormNo._| SF-003-2 fo BULOH -SERDANG —PUTRAJAYA (SSP) PACKAGE 8202[ Revisanfla [0 far vison Defo_| NIN AMR SN Alemida, TOOLBOX TALK Levee ah ce NO. NAME OF PARTICIPANTS: SIGNATURE «| Mahal vbv Ve Fohom es Baw 1) Bsuamp RUE E ie a a v2. | MOaaATAD (Sime y A | 1> [MAT YAY “SW: ae | MD MOOR i ETM z 1S | MoNIR (O2oR1N lyn |_—_— ee U6. | APQUR AAZZAK 3..N-A GO uy. | MORAY S-W-® Pe 8, RO2A SHAHIN NA Shin 14 MIAMI TV Gc Ae Ze 30, |Onid KAA IVA feos Pe DMA 4 22 22 [RATA PU Z— S14 tt 93 [PELA ci 7nr 24|DIPO : clin = 25 [PFI AVF 2b t Se a [Aum esa 2g MOIRHo SSAiy SMR a 9A [Shove HASSAN Ct me: 30 | Ainaa_Ainirah Cime = (Aue SI[AABIR C(OME ERS | 92[ RoBiuL : CME eae 33 | roar - Di Ht ee hove. ye ae 0 _| ae Fasou, a dK a 3 ei ie | Fins Sow AC 7 SSA Be 3 | Ritzer Bet 4 4 } 3g | YousSor De ae a > 3q| RiPon Fan ‘a uo aw _ NADIA | ay |. Dilfer a Pte Nodtah RefNo. PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGA |__| C2NVLBT/2019-_ BULOH ~SERDANG ~ PUTRAJAYA (SSP) PACKAGE | S!/Form No_| SF-003.2 S202 RevisionNo._[0 Revision Date | NIA TOOLBOX TALK iesue Dele Weekly Toolbox Summary: KEPONG BAHRU STATION TUESDAY (22/10/2019) -Start with doa’ and exercise “Safety Awareness - safety everyone responsibility -Security - Must register at security post and record at logbook -Security checking for CIDB -Securing of materials -Suspects of a stolen case that has been arrested by police -CIDB Green Card checking -KVMRT passport - Must register to KVMRT passport and attend Blue Card Training -Grey Card - to attend related Grey Card training -Material arrangement - not blocking access -Housekeeping before, during and after work to be maintain, and practice -COMBI - Search & destroy. Everybody responsible. -Rest area - rest at designated rest area, if workers rest on illegal rest area will get penalties. -WAH to comply on safety requirements -Scaffold awareness - to comply on safety requirements -No smoking on siteROW -Smoking at designated smoking area or get penalties, -Plastic bag for food and drink are prohibited on site. Use Tupperware /container for food and drink or get penalties -Safety campaign(WAH) - Scaffold, FPP and Falsework Training & Awareness Participant : Solehin SSS SNAH, Abdul Samad SV SNAH, Aina PIC CIME, Razman Scaffolder Inspector, Liyana SHO AZRB ; Fag SRRFTSRTURTISE Bi | PROJeK MASS RAPIO TRANSIT LALUAN 2: suna |~~-->_—__| Sawin zoe = BULOH -SERDANG ~ PUTRAJAYA (SSP) PACKAGE | SH Form No. | SF-003-2 $202 RevisonNo__| 0 | Revision Date | WA Issue Dat id TOOLBOX TALK [Page i 1 ATTACHMENTS: PHOTO 1 E a PHOTO 2 PHOTO 3 - PHOTO 4 SN AKMIDA HOLDINGS SDN BHD ‘TOOLBOX TALK (Rh, |PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH ~ SERDANG ~ PUTRAJAYA (SSP), i Protect PACKAGE S202: CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AltD OTHER ASSOCIATED WORKS AT KEPONG SENTRAL, METRO PRIA, KEPONG BARU AND UINJANG croup of Work Suh woRWepy Jdoe. Ret. to. | suarstineTesao2rneri20%e- Location meds ste 24 10/3019 ‘Safety Toples No. ‘Atondance List ‘Signature 3 Rade Repatng P Hinione ; 3 |x wartcases, Saragnend | % ting Operatona Sartoard (Pf Nester Ws 5 |j¢ Cheniet Hesting weve aing ipa Ff Pamitiowerk = © Eerplag & Personal Protective 9. Ensen Coit Exlpment e Emergency Teas © Safe coets 9 Erironenel suse SefetyInepecton 2 Excaraton Works @ Teton! - 8 EyePiecton 1 Unra Act&Cenaion [> 7 Hersepay © Obers (esse Spec) If. Howeekepicg 7 [A wna Procedure we 1 Contng Actes ; © ledebon it © Hazard ndentiaten Pan 7 0 Potent Hazards 1" 2 2 Siohaand @ Htby Sta vetide © aring Atty 8 hing Hazards 7 © BurfedunderEerth 9 Lutsoat/O1 spitago jo Cherzal ee a 1. Collpse oftachnesy © Puttbvencies 3 © Oizees/necton 9. Shar Tecls = © Falfrom ielgt © Sip Tipe rel ‘ Feline Trenches 1 Wioking at ight Jo Fre/ Spans © Wg por igh © FootPuncre Cattes Heating Maca 0 Wertngneer Water fo Heat Sresses oe © HtbyNschne Sing i 8 Elctcal Safty a ‘Mate! Hondieg © Manvel titng 3 2 Environmental Concem a T) a conducted sy: checked By latimie 2 : Signs ey founanintay sAfwan Bi YWOF | rene NUNN eh HAG KL Tk SOPETY supeRGoR incall obra 34 fio f20m ete Forma: SFOS ‘SNAHISHIMRT2520 vote 2aMuBTi2018. = 1 RovsionDoio_| NA = TOOLBOX TALK IssueDate com 1 Pago ATTACHMENTS: PHOTOS — PHOTO ‘Weekly toolbox meeting at MEPS STATION WEDNESDAY (24/10/2019). -Start with doa’ and exercise. -Safety Awareness - safety everyone responsibility. Security checking for CIDB. -CIDB Green Card checking. -KVMRT passport - Must register to KVMRT passport and attend Blue Card Training. “Grey Card - to attend related Grey Card training. -Housekeeping before, during and after work to be maintain, and practices, -COMBI - Search & destroy. Everybody responsible. -Rest area - rest at designated rest area, if workers rest on illegal rest area will get penalties. -WAH to comply on safety requirements. “Scaffold awareness - to comply on safety requirements. -Smoking at designated smoking area or get penalties. Haze - drink more water regularly. Always wear mask during haze. Wash hand & face after any activities done. Environmental campaign - Put a stop to the drop. -SAFETY CAMPAIGN (WAH) SCAFFOLD, FPP AND FALSEWORK TRAINING & AWARENESS Participant : SAFWAN SSS, ROSLAN Sv, SN AKMIDA HOLDINGS SDN BHD TOOLBOX TALK frcaveic uss Rapto TRANSIT LALUAN 2: SUNGAI BULOH ~SERDANG ~PUTRAJAYA (SSP) 13 Emergency Coniact, Project Jpacsvec s202: covisrRUCTION AND COUPLETION OF ELEVATED STATIONS AID OTHER ASSOGIATED WORKS AT jkcPone searest, mcTROPRORA, KEFONG BARUAND JIANG. Grou orwomers _[SwakinioA ROLDWGS Son BHD ose. ret, [suanisnmnraiszoznerc019 Location kESS loate 95 [lo [2614 Safty Totes to ‘Atendance ist signature 2 ea ay a Tagine : 9. Baricades Signage and © fing Operations Sabon © Machinery Woe - © Chamiesls Hsing © Nona ensing el 3 ce © Pemitowork a Earplug (9 Petsonal Protective: Ms J\) Equprent 2 Emergency Tools 2 Sale Access = ctorlian (Reber 7 S ae tachment 3 & 7 s LS} 2 Bioharae 1 Blasting Actity 1 Buried under Ech 2 Cheical 1 Disease nection 2 Fallon Halt 9. Faint Tenens © Blectical 8 © Menval iting 8 Coliapesettachinary © ity len sua Refer Atfachwent 8] 1 EniiermentslConcart Hitby Sto Vehicts LUptning Horses Latveant/ Oi page = + 1g © Stap Teals 7 Sip, Toa Fate Wething sth 7 Working nes igh s crrers (ease Speci fooneucted By Ceriitiag: Checked oy IAD BYUKRI BIN i881" SITE SAFETY SUPERVISO: '8.N.AKMIDA HOLOING SDN BHO Desgnat [10/9019 bots fut I Bat bho ofFtbe- | oi wad WHC) a WA, 5 J ‘SNAHSHIMRT2S2 ee oawsrizots. = Bi | PRoJEK mass RAPIO TRANSIT LALUAN2: SUNGAI | BULOH ~SERDANG - PUTRAJAYA (SSP) PACKAGE | S'/Form No_| SF-003-2 | RevsionNo.[o A RovsionDale | NA | sve Dato cu TOOLBOX TALK ee ATTACHMENTS: "PHOTO 5. PHOTO 6 1|Page i Forno, | SNANSHIMIRT2S2 | . PROJEK MASS RAPIO TRANSIT LALUAN 2: SUNGAL | oem BT2018 = 'BULOH -SERDANG ~ PUTRAJAYA (SSP) PACKAGE | SHForm No_[ SF.00%:2 $202 RevsonNo [0 Rovsion Date | NTA ( Tesue Date cu TOOLBOX TALK ape ‘Weekly toolbox meeting at KEPONG SENTRAL STATION FRIDAY (25/10/2019) -Start with doa’ and exercise -Safety Awareness - safety everyone responsibility -Security - Must register at security post and record at logbook -Security checking for CID. -Securing of materials -Suspects of a stolen case that has been arrected by police -CIDB Green Card checking -KVMRT passport - Must register to KVMRT passport and attend Blue Card Training -Grey Card - to attend related Grey Card training -Material arrangement - not blocking access -Housekeeping before, during and after work to be maintain, and practise -COMBI - Search & destroy. Everybody responsible. -Rest area - rest at designated rest area, if workers rest on illegal rest area will get penalties. -WAH to comply on safety requirements -Scatfold awareness - to comply on safely requirements. -No smoking on site/ROW -Smoking at designated smoking area or get penalties. -Plastic bag for food and drink are prohibited on site, Use tupperwarelcontainer for food and drink or got penalties Safety campaign(WAH) - Scaffolf, Fpp and falsework Training & Awareness Participant : Syuk SSS SNAH, Rahimi PE SNAH, Faris SV SNAH, Nazirul SV SNAH, Razman SI SNAH, Aina PE CIME, Afiq SSS PPE, Nabeel SV PPE 2|Page SN AKIVIDA HOLDING SDN BHD {APID TRANSIT LALUAN 2 SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE $202: CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHERS ASSOCIATED WORKS AT KKEPONG SENTRAL, METRO PRIMA, KEPONG BARU AND JINJANG TLE: TPoLgox meenug eH DATE: 95 / to / 2014 ~ TIME =: 0Goo VENUE : KESS —S No NAME _[_pesignarion | COMPANY | CONTACTNNO, [SIGNATURE] [Adot |siem | SH Akinide a emi 3 au Ee : SHU a | DS Tm sn | |LoKrant— i tv = aa Wazpie Bown | SY A Lira Bélin_ or <7 (=| SABER PERCE LLLP le Shygr) = is SNP ; an SHAHN [ow t— | Sipul slam aw ascent Soloman Sw “| 7s: Fi ASogpoae 2 = | 1) L beat te ie a4 rasa TIPU SYY- SH PE part SS 0 SSA Tite SMO ARDY | ‘ ABD YVILSe BV a pee | Wat me : Sr ian MD IMRAN HRS AY | SPARMU hye SHAKER a Sm AU a au = [ BY BEL mai a SHB, RE Mohommed 89 0b Ss Ali Apt wv &sharai | oe BobulsnetA> A Be eS [a YERSIM : Sa sae ee Tanvir _| PPE He Harv) ari | PE Tag len Burhan PPE eb we mir | PPE Few Medic MeAr | Rubel 7 __| Raid pe | $n CW ABpyimn) nes Muhd- Rezate SN AKMIDA HOLDING SDN BHD ATTENDANCE FORM PROJEK MASS RAPID TRANSIT LALUAN 2 ‘SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) PACKAGE $202: CONSTRUCTION AND COMPLETION OF ELEVATED STATIONS AND OTHERS ASSOCIATED WORKS AT KEPONG SENTRAL, METRO PRIMA, KEPONG BARU AND JINJANG THLE ToolBox MEETING at DATE 25 fio 1 2019 a TIME 0%00 VENUE: KeSS 7 No NAME DESIGNATION [COMPANY | CONTACT NO. | SIGNATURE, Medal 13107 CMe. aims | SWefaen ame CME Be yen san ur ISAAAL OME AAR CINE = [ [afin __ $8 Pre i i Aina Pe CAME SN AKMIDA HOLDINGS SDN BHD PROJECT KVMRT2 SSP (S202) SCAFFOLD LOG SHEET _Eilins, JDIKeBs, CIMEPS, CIKEss. FROM 21/10/2019 - 25/10/2019 WP/17/03/115909 SL/19/03/135424 4 1 Kes OtTOBmsee+_ SCAFFOLDING LOG SHEET REVO T Se ee el ee ree 2[ S900 [ress cae] SH St foul [ufo [afe los/r Ke Tow 2[ S900 [ess tose [SUSE Lolo In fio [efe_[aslio Aan Tous 3] S009 __[kess ce $8 S86 [Ou [ro | : 7. Dismente (borane TaRIIe ol Song. 7 Restate sn Sap [eu [eolifib [76 losis ea ne | S| Sa09 |kess ce ww S3q [ou [| a] | Dismre| 1 monte sl Sea [xess ct SA Su% [ROA Dworie| I rt 2| Stor’ |kees sa sat [OU oY) 70 Dasrenttel THOR HE s| seo [ess ‘Sm_SST Ou [rol [te |e7© [as1P loneas s| Seog | kess Pe sa 855 Reo Td | Gaed| Pet Tas 0 S &e Kess pe Sw BSH lout io |y fio [Ped PF leg i 1] SQ00 | kess SN S5§ ou [eo [yr [7D [R7OV [95 [1d Ac Tawee, 2] Seo |Aess SN 865 ou [co] Red fea Desmony PORE. 3] Sooo [icess SN 86 & ou [el TON KT lo _ [os [2 Moar le ul Se0a [eess Sass OS/rolu fio [feo |o5 | Ag PWEL | So08 ICeSS sn stl Atte \is[te Jos fo Bean Tessa rent | 3908 ees mec | su S¥S [a /rd [Red fey Pitre pt fog i a] Seo [ess mee | Se S46 [Te [isi fos To Tne B ile | we] 6@e (C685 mee | SM ORE [ID [ool tobe | we] Soom | Keay & | SEF [TO lool AL TOWEL. | wa] Soom, | Ces Cap | SN SS [a5 7i0 [pote Bate: | { ¢ megs OcTeBen. Poiet BRE oe SCAFFOLDING LOG SHEET fesvnoe oI no] enoner | woemonanex | wenunom | SES, [| ag Ee S| titersenroune evans sf s900 | mens que | sn aeu 07 110 |reddee\_Drenonat | [ mans i=” | 2] S900 meps UBS | 0 506 37 io pane Pat [ee | 3[ seco |meps ora | sw 526 01/10 fred YA [Dorota | OBIE a] Sp Iméps tet | sw SSS or Jie | oss ICL Dyson [Ae Jowee. 5| Sooo |meps mye | sw 88% [er/ lack decy Art Teg S| Sdoa_ [ers _ PL e866 6777 [08/18 [U6 [te [a8 [eo Ae fee 7| S000 [mem Riso | SN S&C [2378 co Eb FTO | 23) [race [ e| So0e [megs SH S#6__[og/ie D3 he ORE 3| Soo megs SHE [ee [eo Mo8i le wo] Sooo. [mers SN BBD 99-[ 10 Put fod @ ! Kees: Pas CETORCE SCAFFOLDING LOG SHEET aS wa} eacueer orm ane tactumezn | yenenon [OTE RSS REET STE] _ PEO searrowG eran 2] soos. | keas cx wees | ovo [oslo [Ite [aslo Ae Towed 2] Saeo Kess co en sss [2776 losfo [le] |as) TROBE 3| Seon [Kees A Sw 60a» [07/7 low? [Damndle| TROBE +| Sees. [Kass PE SN SOS or f/10 |opféo_\\$/F6_|o3hio P7081 I s| Sooo [Aras SA See 07710 loxteo | Orenertl Tis = s| Seog. [xe@s PL SN S87 01778 [Deron | mop le ee Sw Sub 07/7 _|Dusnette| Tove Spor 2] Soo Kees SAI Sue Or 7o | ae Bird ge a] Soo. |Ke&Ss end | SN SCT [oi/7e lost ra [Drama Poy 10% wo] Seoe | ZeRs W_ 56a OL Jie _[Dsxeote eT =| sae [ees e& | SN SES alts [Jo [og tee | Bird Bae. ul S@e [tess ww | SN S86 ISTO fosyio | meee wl Sao [tess et Sn Stk as /to | Peet [ee | | _S@e- [eas SN SSS [3/10 mobi Te. | =| Sie [eeas SEE Dafeo moB/7e is] S00e— 708) |e | Sé0e~ ss] SGe~ | | ms OcTeReK Seth \ SCAFFOLDING LOG SHEET —— le ES SHS neorserons | means [z) seea 1 Sms ves | se ost lou /eo] 1 [isso led [re tasers | 2] seg Sms our | Sw SF% lou /olN 16 | e700 _beSie | [Ae mw | | [2] Saco ms Re PS GR4 Joule [Me lix/e sts | LAetooen, | | LL seo [Sw [x Be [ould [WAS | 127% [Devel | meerte I | [Is] S@e_ [Sins cu | sm 44s lou [70 [n\ lo loan I [Lmosve T [es] sae Tye MT SN 550 Tow Prol w Ve e [ef 16 Ipgwente | Tower i 7] Seo jSms a | SN S83 lou rol wite [edd Iolo | [me Be I 2] SOO [dings Ct | SN S55 [Orman I I [moa re 1 [2] Seen aise 1 SN 586 lou 16 | NTO te los ¥e_ I LACT. | [pi See Sis ce | SN ESA fou Jot nid Vin bs lie] | OSE T Tyns cco [ev see Joule tule Tavfo bev | [ meaie | [Sims OBS | SN 5S Loss ot Lisle _los\2 1 j se Rok | Paws Foon ee [io [eg i | I | Pak Tort | Taws Ge | S884 |v re [I IY ig 70_joewott [ mogte | {diss ou [sa SA] TP [os itd | 1 I [ Bid core | I I I 1 | | I i I 1 I | } I 1 ! { | | I I 1 I ! t I 1 I i I | I | { I I I | ! lL I 1 [ | 7126019 Reonex (WeC Use ony): Dear Gatekeeper, Herewith 1 attached the MST (MBE) submission for "Clezn Agent FH 200 Systema Installation" Revision O1 dated 08/04/2019. Kindly refer 0 the atuaciuinent Thank you. i Issued By ‘Approved By Name MUHAMAT PIZOOL, ZULASYRAP KADIR Designation — | OC PM. Department | QAQC PROJECT MANAGER, Please acknowledge receipt and return the acknowledgement copy. Signature: Date: Name: Department: Fromt V Gatekeeper Sent: 22/04/2019 12:07:07 PM HKT (GMT #08:00) Tot NUR RATHANA AMERUOIN ‘Mall Number: SP-PDP2-GCOM-066578 Sulbjects Re: $202 MST(MBE):Clsan Agent FM 200 System Inetalton(RevOt!) - REJECTION NOTES Dear Ms NUR RAIHANA, ‘Bocument cubmisslon vie Transmittal SSP-AZSB-TRANSMIT-012550 were REJECTED due to . 1) Wrong revision for subject title. ‘This submission will be rejected. Kindly make necessary amendment and submit back, In case you need further clarification, please don't hesitate to revert back. ‘Thank you and regerds, 202 PDP Gstekee SN AKMIDA HOLDINGS SDN BHD PROJECT KVMRT2 SSP (S202) PLANT & MACHINERY RECORD _AIINS, [AKEBS, CHMEPS, EIKESS. FROM 21/10/2019 - 25/10/2019 WP/17/03/115909 SL/19/03/135424 ‘SN AKMIDA HOLDINGS SDN BHD $202 PLANT & MACHINERY RECORD FROM 21/10/2018 TO 26/10/2019, machine pus |Pur | vear |anoearry | wamcor |. camer coMPeINCr Can “ PANY ae REMARK =a Oe ao eS ealoelaw oe eer eer es, ee cS ee eee ; soalalle com Jose ERE i caw [ewoo] [ie [am fan [ae aoe [p> [BE [ow eon Se z = eon Be [ows eee |aeees| oer = Hsu ae» [Bie anew vosoar [Banos a ‘SN AKMIDA HOLDINGS SDN BHD $202 PLANT & MACHINERY RECORD FROM 21/10/2019 TO 26/10/2019, KEPONG BARU STATION acrINE eual |r |vear [aro eaary |naucor |. commer] COMPETENCY Shr no | MGGIME | woos. |caracirr|neo.no.| Fir | i | MEME |NpeStion | Crem |RASSEORT |courany /Locanow |/Sennncate. | GeRTENe. |SAPR,, can Date ie ate z a [wa fa fay fa eu fava faa | NA wa Na wa [wa |x wa [Na METRO PRIMA STATION MACHINE Rec. Pim | year | ano parry |wawcor | Gowrerency | cowrerency | anevcaro No | MACHINE |uooe. | capacrry| RE Pur | YEAR SRD PARTY, | NAME OF _ | Passport |coupany |tocaTion Gemnmicare | Genrexe. "| Ranine | REMARK ; ee nO. teense Sate bate fae Na aan PPE eps Sttoned oe i ] j ‘oman 2 | Bey NA Na Na out | MES Suton Parana 2. | Barcuting wa [wa Na wa sun | ees Stoned 7 reste —| 4 | Boma Pia, | senso ondaye | ororecer2 | nan | mers beeeon ‘a Sone | Seamus ae | Bia | zenaz0 [aio womoun | BY Pee ers Suones ey fe [PMA etree | Stones Ss ey ce, | Beomune enroos | Pia | ever20 | 2x0 suiasos | axorsaos | pee ers Stones | isa) antes > | Seamuns | a [Fria | oraz | 2010 wom — |ceasarz [ere ers Same” | ec Ee | once one | RouGH cone ec orared | geararan | FAB wean] « |Gonezs |Tereaiw |2st — |MOX [Ba | awosao| aor | zrmano | Sour | 28070795 |Eutoers [ress | surmowczonsis |asoza: | szavtane | Beton Some" | Tabano cea Abdali 58 sates | ‘SN AKMIDA HOLDINGS SON BHD $202 PLANT & MACHINERY RECORD FROM 21/10/2018 TO 26/10/2019 EPONG SENTRAL STATON mar oY uns ‘ courerexey | couperencv no | MACHINE | one. | capacity REG.no. | pur | PMT NAME OF _,| PASSPORT | COMPANY | LOCATION | CERTIFICATE. ‘CERT EXP. a REMARK See ear | Ghetaton | PAS cermeecare |centee. | Franc oat “lee - ca anaes [a wx [ie | rere mee [acs | Sood : we t emcal 2 | wn [Bier | sonsne mee faces Sons er ero7ro44. | BMicrTY : eee cine : Tenens | avorore. | wor eneen a [eines [case urarso |wa |wa | 20s Fancra | syriose Jowory |ress tae oer wa | | wa wa man | Sanoees” + | Bang NA 8 ss Soe j } | Sar «| aeouting mn | we [uw enn [vee Soros = oF Semin Nu 9674 | Pama | o7s0420 RUBEL ‘BK 0592492 | PPE xe tationed [zene cnusore |B, [rsee ear . [ieemen envoor [ri | asnoze usu [2M [ere [ness Somened” | ea a Sees | | tere! | st ‘Temparaniy 1 « | oes Pua | 0403/20 nobel pkoss24e2 | PPE KESS Sioned | te ie | a. | pear | kare vexase Ja |m wan |" love [ess beer coe = |AZMAN in | 70425-05- Temporaniy | vo. |enees sot |ereszie [rm | onrazo ve [aes Saee Tone 51545, re ~ [Gomer ‘or on mowman [zee Tore |aess Saeed” | ee | | | Sv anal aa | 12 | soe fata | ssc Jrre | ness Sarees | ri SRean_| es |

You might also like