0% found this document useful (0 votes)
436 views

Inspection Electrical Storage Check List

The document provides an inspection checklist for electrical and instrumentation equipment preservation. It lists items to check such as proper storage, protection of openings, and tight fittings. Requirements covered include storage conditions, packing styles, permitted preservative products, and special requirements. Extended storage must be properly monitored and logs updated. Photographic evidence is required for any walkthrough activities.

Uploaded by

Zaini Achmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
436 views

Inspection Electrical Storage Check List

The document provides an inspection checklist for electrical and instrumentation equipment preservation. It lists items to check such as proper storage, protection of openings, and tight fittings. Requirements covered include storage conditions, packing styles, permitted preservative products, and special requirements. Extended storage must be properly monitored and logs updated. Photographic evidence is required for any walkthrough activities.

Uploaded by

Zaini Achmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION CHECK LIST

ELECTRICAL & INSTRUMENT (PICL-05)

PO No. : Inspected by :

PO Title : Inspection Date :

Supplier Name : Inspection Level (IL) :


Preservation Procedure :
Doc. No. / Rev. No.
0
Inspection Result
No Description
C NC NA Comment

The equipment shall be stored in cold room with segregation of the material as per specification and
1
preserve properly

2 All opening part and auxiliary shall be protected properly

3 Check instrument cabinet, marshalling, control panel and juction box are closed and fitted tighthly

4 Preservative product shall be applied before packing `

Preservation requirement summary of material and equipment as per approved preservation procedure :
Storage condition : – Outdoors with cover sheet
– Outdoors without cover sheet
– Indoor with air conditioning
– Indoor without air conditioning
Packing style : – Closed box
– Crate box
– Bare
Preservative product : – N2
5 – Dry air
– VpCI
– Rust presventive oil
– Space heater
– None
Special requirement : – Moisture proof pack
(If any) – Vacuum pack
– Sealed container
– Periodical rotation of shaft /
impeller

In case extend storage, all packing shall be stored in proper place, protected and the condition validity of
6
preservative product shall be monitored

7 Preservation log sheet shall be updated

Note:
1. Any activity during walkthrough shall be completed with picture as evidence for reporting
with
cover
sheet

Outd
- PRESERVATION INSPECTION
oors CHECK LIST
witho
ut
cover
sheet PHOTO INSPECTION REPORT

PO No. - : Inspected by :
Indoo
r with
PO Title : Inspection Date :
air
condi
Supplier Name : Inspection Level (IL) :
tionin
g
Preservation Procedure :
Doc. No. / Rev. No.
0

-
Indoo
r
witho
ut air
condi
tionin
g

Packi
ng
style :
Photo-1
- Photo-2
Subject
Close: Subject :
d box

-
Crate
box

-
Bare

Prese
Photo-3
rvativ Photo-4
Subject
e : Subject :
produ
ct : -
N2

-
Dry
air

-
Photo-5
Dessi Photo-6
Subject
cant: Subject :

-
VpCI

-
Rust
presv
entiv
e oil

Photo-7 Photo-8
Subject : Subject :
-
Spac
e
heate
r

-
None

Speci
al
requir

You might also like