Itp Plastering
Itp Plastering
PLASTERING WORKS
gr
ing bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bu
Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 1 of 7 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name : ABC PROJECT INSPECTION AND TEST PLAN
Project No. : 123-45-67 m Ref. No. : P07-F06a / Rev. 0 / Feb. 2012 (ITP)
Client Proj. Manager Consultant Contractor
PLASTERING WORKS
gr
ing bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bu
Prepared by (Contractor) : Reviewed and Approved by (AEB Discipline Engineer) : Noted by (AEB-PM or RE):
Name : VINODH.P Name : Name :
Inspection Test Plan (ITP)AEB - Construction Supervision Department Quality Forms Page 2 of 7 Form No.: P07-F06a / Rev. 0 / Feb. 2012gr
Project Logo
Project Name :
Project No. :
Client
arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab eng
1 MATERIAL
1.1
1.2
1.3
1.4
2 EXECUTION
2.1 Surface preparation and Setting out
2.2 Mortar Mixing for block work
2.3 Laying of block work
2.4 Curing and Protection
Project Name : ABC PROJECT
Project No. : 123-45-67
Proj. Manager
ering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engin
- Mandatory - work cannot proceed until inspection activity has been signed-off by relevant party.
Witness Point - Veryfying Party to witness. Evidence of witness shall be by signature of relevant Inspection Report.
- Inspection and Test documentation to be presented to Consultant or PM for review.
Surveillance - Monitoring of work activities, NO report required.
Reference Documents
Fr
(Specs/Procedures/Dwgs)
Consultant Contractor
ring bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engine
acteristic strength.
w block.
forced as indicated on drawing.
/ Rev. 0 / Feb. 2012
INSPECTION AND TEST
CONCRETE WO
gr
ng bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau arab engineering bureau
ITP Ref. No :
Date Prepared :
Material submittal
NA
Material Test certficates
Material Test Cetrficate NA
Manufacturers Test cetficates NA
Material inspection NA
• Area must be need sound cleaning.
•Shall
Line,belength
mixedand angles
in the etc…as
relevant per AFC drawing.
proportions Records/ Reports /RFI NA
As indicated in QCS
• All connections between block walls or partitions and concrete or steel Records/ Reports /RFI NA
Mortar
columnsshall
are be used
to be within 2 at
reinforced hours of mixing
maximum 400 mm centers by means of Records/ Reports /RFI NA
stainless steelbe
• Curing shall or maintained
zinc coatedfor
expanded
3 days metal Records/ Reports /RFI NA
ECTION AND TEST PLAN (ITP)
CONCRETE WORKS
Rev.
Verifying Party
SC MC CT PM
NA H R/S R/S
NA R R S
NA R R S
NA W R S
NA H W S
NA W S S
NA H W S
NA W S S