Sample Lump Sum Quotation
Sample Lump Sum Quotation
PROJECT
DATE
SUBJECT : BOQ
LOCATION
ATTENTION
MATERIAL LABOR
ITEM DESCRIPTION/PARTICULAR QTY UNIT TOTAL AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
A. PRELIMINARIES (General requirements)
1 ACCEPTANCE OF CONDITIONS
a Mobilization.Demobilization - -
b Project Management and supervision - -
c Temporary Facilities
2 MISCELLANEOUS PROJECT OVERHEAD
a - -
b Cleaning, Clearing of Debris - -
TOTAL AMOUNT OF PRELIMINARIES
B. CIVIL & ARCHITECTURAL WORKS
1 CEILING
a Supply and installation of gypsum perimeter ceiling
b Preparation and finishing of general paint on perimeter ceiling
a retouching of black paint on ceiling, new ducting, new wirings and tubings
2 WALLS
a Supply and installation of double face dry wall gypsum board on metal framing
b Supply and installation of insolation wool for sound proofing
c Supply and laying of chb concrete wall
d plastering of concrete wall
e Preparation and finishing of wall in skimcoat industrial finish
f finishing painting of black paint on perimeter walls
g Supply and installation of 12mm thk glass partitions with frame
3 FLOORING
a leveling and finishing of concrete cement flooring
4 DOORS
a fabrication installation of 800mm x 2100 flush door with ducco paint finish
b supply and installation of 12mm thk. clear glass double door with complete set of fittings
TOTAL AMOUNT OF ARCHITECTURAL WORKS 0.00 0.00 -
TOTAL AMOUNT OF CONSTRUCTION -