0% found this document useful (0 votes)
4K views

Sample Lump Sum Quotation

This document is a bill of quantities (BOQ) for a construction project. It lists various items of work divided into preliminaries, civil & architectural works. The preliminaries section includes mobilization, project management, and temporary facilities. The civil & architectural works section lists items like ceiling works, walls, flooring, and doors. Quantities, unit costs, and total amounts are provided for each item. The total amount for construction works is noted as pending, to be determined based on the costs of individual items.

Uploaded by

mj sj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4K views

Sample Lump Sum Quotation

This document is a bill of quantities (BOQ) for a construction project. It lists various items of work divided into preliminaries, civil & architectural works. The preliminaries section includes mobilization, project management, and temporary facilities. The civil & architectural works section lists items like ceiling works, walls, flooring, and doors. Quantities, unit costs, and total amounts are provided for each item. The total amount for construction works is noted as pending, to be determined based on the costs of individual items.

Uploaded by

mj sj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONTRACTOR

PROJECT
DATE
SUBJECT : BOQ
LOCATION

ATTENTION

MATERIAL LABOR
ITEM DESCRIPTION/PARTICULAR QTY UNIT TOTAL AMOUNT
UNIT COST AMOUNT UNIT COST AMOUNT
A. PRELIMINARIES (General requirements)
1 ACCEPTANCE OF CONDITIONS
a Mobilization.Demobilization - -
b Project Management and supervision - -
c Temporary Facilities
2 MISCELLANEOUS PROJECT OVERHEAD
a - -
b Cleaning, Clearing of Debris - -
TOTAL AMOUNT OF PRELIMINARIES
B. CIVIL & ARCHITECTURAL WORKS
1 CEILING
a Supply and installation of gypsum perimeter ceiling
b Preparation and finishing of general paint on perimeter ceiling
a retouching of black paint on ceiling, new ducting, new wirings and tubings
2 WALLS
a Supply and installation of double face dry wall gypsum board on metal framing
b Supply and installation of insolation wool for sound proofing
c Supply and laying of chb concrete wall
d plastering of concrete wall
e Preparation and finishing of wall in skimcoat industrial finish
f finishing painting of black paint on perimeter walls
g Supply and installation of 12mm thk glass partitions with frame
3 FLOORING
a leveling and finishing of concrete cement flooring
4 DOORS
a fabrication installation of 800mm x 2100 flush door with ducco paint finish
b supply and installation of 12mm thk. clear glass double door with complete set of fittings
TOTAL AMOUNT OF ARCHITECTURAL WORKS 0.00 0.00 -
TOTAL AMOUNT OF CONSTRUCTION -

NOTE: 30% Downpayment


40% - 100% progress billing