Contingency Plan Format
Contingency Plan Format
MAIN OBJECTIVES: DO NOT DELAY SHIPMENTS TO THE CUSTOMER/ DO NOT STOP THE CUSTOMER
In general terms, a safety stock has been established with a capacity to cover possible contingencies of a week's duration.
If the safety stock cannot be loaded, the actions to be taken will be the same as if the factory were shut down for more than a week.
If the factory were shut down for more than a week, please follow the
1. Identify the person responsible for managing the contingency: Plant Head(Respective user function will be the initiator & responsibility as per Contingency plan)
2. Notificación sentí to customer.
3. Give the customer the option to produce in external providers location.
4. Analyze the root cause of the shutdown.
5. Prepare the action plan (indicating actions, responsible and deadlines) to eliminate or minimize the risk of a repeat event. Agreed with the customer, if necessary.
6. Analyze the effectiveness and efficiency of actions taken during the contingency plan.
7. Prepare a summary report of the contingency.
8. Review the current Contingency Plan Evaluation.
9. Close the contingency.
Risk (R) = P x S x F
An action plan should be developed to minimize the risk of those risks detected that have a score equal to or greater than 18.
DOC NO
CONTINGENCY PLAN REV NO
REV DATE
Risk
DESCRIPTION/ CURRENT
S.No Contingency Factor RISK IDENTIFICATION AFFECTED FACILITY Reponsible Person P S F Comments/ Action Detailed action
MEASURES
R=PxSxF
Filled by: