The document is a review stamp from GHD Global Pty Ltd of electrical documents for a project. The documents were approved as noted, with two requests: to remove irrelevant documents from the method statement and provide a structured cabling ITP and checklist for review and approval. The review was checked by Baihram Majeed on 07-05-19.
The document is a review stamp from GHD Global Pty Ltd of electrical documents for a project. The documents were approved as noted, with two requests: to remove irrelevant documents from the method statement and provide a structured cabling ITP and checklist for review and approval. The review was checked by Baihram Majeed on 07-05-19.
DOCUMENT / DRAWINGS REVIEW STAMP Electrical: Status: Approved as Noted A Accepted 1.Remove irrelevant documents from method statement. 2.Structured cabling ITP and check list to be provided for review and approval B Accepted as noted Not Approved - Revise/ C Resubmit CHECKED BY: Baihram Majeed DATE: 07-05-19 Documents receiving an A or B status are considered to conform with the design intent but does not mean acceptance of dimensions, sizes or weights, nor does it relieve the Subcontractor/Consultant from any responsibility for errors, ommisions and/or compliance with obligations an/or responsibility of the Contract and/or Consultancy agreement.