The document provides a method statement and risk assessment for installing structural metal decking (SMDB) and decking (DB) on a construction project in Abu Dhabi. It details removing irrelevant documents from the method statement and providing an inspection and test plan (ITP) and checklist for review and approval.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

SMDB and DB

The document provides a method statement and risk assessment for installing structural metal decking (SMDB) and decking (DB) on a construction project in Abu Dhabi. It details removing irrelevant documents from the method statement and providing an inspection and test plan (ITP) and checklist for review and approval.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

McLAREN j

I GULF
RELATED
North and South Car Park Connectivity Corridors, and Concourse Link Bridge
Al Maryah Island, Abu Dhabi, United Arab Emirates

METHOD STATEMENT SUBMITTAL


FROM: Mclaren Construction Ltd. I TO: GHD

Reference Number
Subject: Installation of SMDB's and DB's
Project ID Client Ref. MCL•ME-A-MST-000030
M1467 Subcontractor
Note: Commerlts shall bf' noted on actual drawings with stamp GEMC·ME·A-MST-008
Ref.
Olsclp/Jne:
O Architectural 0 Structural ■ M,!,P. D lnterlor1 btemal works D Other (specify:)...........
Ii'•. Document Ref. No Rev Title
Ref.
Cont. Status
Drawing
Method Statement and Risk Assessment for Installation
1. GEMC-ME-A-MST-008 00
of SM DB's and DB's
Consultant Review Sign Off Returned to Contractor: Document Status
-···
Consultant's
Client Representative Approved Approved as Noted
Name:
Reviewer's
Name: Revise and Submit Records
Nome:
Reviewer's
Sign: Final Status/ Representative
Signotvre
07-05-2019
Date: Dote: Signature: Date:

This section to be completed by reviewer: Con1ult1nt'1 Received Date


Comments:
GHD Global Pty Ltd.
DOCUMENT / DRAWINGS
REVIEW STAMP

1.Installation of SMDB,s and DB,s to be done as per EWR A Accepted

.) 2.Remove irrelevant documents from method statement.


3.ITP and check list to be provided for review and approval B Accepted as noted
Not Approved - Revise/
C
Resubmit
CHECKED BY: Baihram Majeed DATE:
07-05-19
Documents receiving an A or B status are considered to
conform with the design intent but does not mean acceptance
of dimensions, sizes or weights, nor does it relieve the
Subcontractor/Consultant from any responsibility for
errors, ommisions and/or compliance with obligations an/or
responsibility of the Contract and/or Consultancy agreement.

Baihram Majeed
I Site Engineer
Name: I Designation: Signature: Company Stamp & Date
On behalf of McLaren Construction Ltd.: / /
Signature: Signature: Signature: s·1gnatur•A�
/ · �" .A
/1 //
,,.--.....;::::

Safety Manager: Joby John HSQE: Jamie Selway Construction Manager: Prabhu Project'M'anag'e'r: Luke Watson
Originator Genfocus Electromechanlcal Contractln1 LLC Mel Received Datt Stamp McL Distribution
Name: Syed Faisl Ahmed Client Others:
Designation MEP Manager I Consultant J
Date: 07.03.2019 I Signature Originator
Corrections or comments made receive to submlttals during this review do not relieve the ,cmtractor from comp/lance with the requirements of the ,ontract
documents