100% found this document useful (1 vote)
505 views

Third Party Inspection For Valve - Procedure

Third Party Inspection for Valve - Procedure

Uploaded by

Abhay Karande
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
505 views

Third Party Inspection For Valve - Procedure

Third Party Inspection for Valve - Procedure

Uploaded by

Abhay Karande
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

11/22/2019 Third Party Inspection for Valve - Procedure

Inspection-for-
Industry.com

Home General I4I Academy Fix Equipment Rotary Equipment

E & I Equipment Get in Touch

Did you find this Third Party Inspection for Follow on


article useful? Valve - Procedure
Click on below
Like and G+1
buttons! Share on  Facebook  Twitter Search this
Site! More than 300
The Third Party Inspection for Valve article
Articles!
Home provides you with a sample valve inspection
and testing procedure in the manufacturing
shop. It is particularly suitable for the
GENERAL inspection of Gate, Globe, Ball and Check
Valves. This article should be reviewed in
Pre-Shipment conjunction with valve inspection and valve I4I Academy -
Inspection inspection and test plan articles. Video Training

Third Party
Inspection

Vendor
Inspection

Commodity
Inspection

Inspection and API 510 Training -


Test Plan Exam Prep Course

Factory
Acceptance Test
This content guides you through all
Industrial necessary stages in the production of the
Inspection industrial valves, including the inspection
https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 1/13
11/22/2019 Third Party Inspection for Valve - Procedure

Quality Control of manufacturing material, casting,


fabrication, dimensional inspection, NDE,
Plant Inspection
final inspection, preservation, packing,
Coating and dispatch to site.
Inspection
You need to take this point into account: this
article is written for a typical valve and might API 510 Exam
I4I not be detailed for special cases. Questions Package
ACADEMY
All valve inspection and testing is done
I4I Academy against the approved drawings, purchase
Courses order specifications, purchasers or company
standards, and within the practices and rules
API 510 Training
of the country, state or province and any
- Prep Course
government decrees, laws, ordinance or
API 510 Exam regulation as may apply.
Questions API 570 Training -
Package As a general guide, all valves over 8" NB will Exam Prep Course
normally be individually witnessed on test.
API 570 Training
With very large or special valves, such
- Prep Course
inspection may be extended to detailed
API 570 Exam component inspection of major components.
Questions
Package Such detail inspection will always apply to
valves intended for high pressure steam,
CWI
cryogenic, nuclear or other critical service,
Endorsement API 570 Exam
and in such instances, will extend to valves
Course Questions Package
smaller than 8" NB.
ASME Training
Course The applicable codes and specifications for a
ASME IX valve that is under the construction process
Training Course is:

Design code
FIX Purchase order specification
Purchaser's standards
EQUIPMENT Approved drawings
CWI Endorsement
Training - Prep
Pressure Vessel and the applicable codes and standards are:
Heat Exchanger
API 598
https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 2/13
11/22/2019 Third Party Inspection for Valve - Procedure

Piping System API 6D


API 594
Industrial Valve
ASME / ANSI B16.5
Steam Boiler API 600, 602, 603, 604

Storage Tank The applicable codes and standards may be


Process Heater based on other international standards. This
ASME Training
content is general and can be useful even if
Course
the design code is different from the API
ROTARY Code.

EQUIPMENT Required Documents for Third Party


Inspector Review:
Centrifugal
Pump
The list of documents normally is agreed
Centrifugal upon in the Pre-Inspection meeting, which is
Compressor held several weeks before the actual ASME IX Training
commencement of the inspection work. Course
Reciprocating
Compressor
The parties that participate in this meeting
Gas Turbine are the manufacturer, purchaser and third
party inspection agency representatives.
Steam Turbine

Fan & Blower This is already explained in the Inspection


and Test Plan for Valve article.

E&I These are the list of documents that are


EQUIPMENT normally agreed upon to be presented to the
inspector:
Electric
Generator Valve Purchase Order or Contract
Valve Manufacture Quality Control Plan
Electric Motor
Valve Inspection and Test plan
Power Valve Data Sheet
Transformer Valve Approved Drawings
Control Panel Valve Material Test Reports
Valve Welding Specification
Switchgear Procedures (WPS) and Procedure
Power Cable Qualification Records(PQR)
Valve Welders Qualifications Reports

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 3/13
11/22/2019 Third Party Inspection for Valve - Procedure

GET IN Valve NDE Procedures ( Dye


Penetration, Magnetic Particle,
TOUCH Radiographic, Ultrasonic , PMI Testing,
etc. )
About Me
Valve NDE Personnel Qualifications
Contact Reports
Valve Heat Treatment Procedure
I4I Academy
Valve Calibration Certificates for Test
Contact
Equipment
Services Valve Hydrostatic Testing (shell)
Blog Procedure, Closure Testing Procedure,
Backseat Testing Procedure and Water
Privacy Policy Quality Document
Valve Preparation and Painting
Procedure
We will be updating Valve Preservation, Packing and
and growing this Shipping Procedure
site with more and Valve Packing List
more of industrial
inspection related Third Party Inspection for Valve - Material
articles. Inspection

Please subscribe to The first actual inspection work in the valve


my monthly is the materials inspection. The original or
newsletter so you authenticated copies of mill certificates of
don't miss a thing.
material normally are available at the
manufacturer's premises.
Email
The third party inspector examines these
certificates for compliance with
specifications, and where appropriate,
Enter Your First
drawings.
Name (optional)

The review includes checks on:

I am at least 16 Certificate No.


years of age. Heat or cast No.
Chemical composition.
I have read
Mechanical properties.
and accept the
privacy policy. Heat treated condition.
NDE applied and results.
https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 4/13
11/22/2019 Third Party Inspection for Valve - Procedure

Surface finish
I understand
that you will use
This covers body stem material, shell
my information to
send me a material, trim materials, gland materials, anti-
newsletter. friction materials, ball, wedge or flap
materials, operating components, support
Subscribe material, well end, flanges and any other
specified component.

Then the inspector witnesses the materials


identification on the certificates against the
materials marking. It is also necessary to
check these with the valve drawing
datasheet, material list and other
specifications as appropriate.

Visual inspection for surface finish and


probable defects is done and dimensional
compliance with specification need to be
controlled, as well.

When third party inspector carries out the


material inspection, then provides the
inspection visit report (IVR), the report
contains the following items:

Confirmation of satisfactory document


review
Record of the endorsement of
certification reviewed/witnessed
Record of all non-conformities
Record of any tests witnessed and the
result

Third Party Inspection for Valve - Welding


Inspection

When the valve material inspection is carried


out, and the results were satisfactory or non-
conformities were closed by remedial action,

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 5/13
11/22/2019 Third Party Inspection for Valve - Procedure

then the valve manufacturer will start


fabrication.

The third party inspector checks the


following points on the valve based on the
inspection and test plan (ITP), which has
already been agreed upon between the
purchaser and the valve manufacturer.

The inspection scope is determined in the


ITP. Some purchasers prefer to have
stringent controls and assign the TPI for
more “hold or witness points” for inspection
and test activities, and some others prefer
less “hold or witness points” and assign the
TPI much more work in the “review
document.”

This depends in the inspection budget, which


purchasers assign for inspection. Much more
inspection will have a much larger cost and
less risk, and conversely, less inspection will
have less cost but more risks.

The third party inspector carries out visual


and dimensional check to ensure compliance
with WPS and specification. Where
specified, weld bevels need to be examined
by MT or PT after grinding/machining.

Edges and weld bevels need to be clean, dry


and free from surface defects, laminations,
cracks, voids, notches, etc.

These are causes for rejection unless


suitable/satisfactory remedial action can be
taken. Welding repairs to bevels are not
permitted, without approval from the client.
Inspectors need report excessive or serious
defects.

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 6/13
11/22/2019 Third Party Inspection for Valve - Procedure

Following items are taken into account when


third party inspector making inspection on
the valve welding:

Cleanliness and fit up accuracy of


preps.
Roundness of form of components.
Application of preheat.
Welding in progress.
Cleaning of welds.
Completion of test coupons, (where
specified)
NDE. Results shall meet specifications
or code requirements.
Hardness tests - when specified in the
contract
Impact tests- when specified in the
contract

Third Party Inspection for Valve - Post


Weld Heat Treatment

Third party inspector carries out dimensional


check and PWHT control as specified. When
PWHT has been completed then portable
hardness measurement may be used to
establish hardness of material, heat affected
zone or welds, as may be specified.

Third Party Inspection for Valve - Visual


and Dimensional Checking

Third party inspector controls following


points:

To verify that the model and various


features and components comply with
the purchase order description and
valve specification and drawings as
applicable.

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 7/13
11/22/2019 Third Party Inspection for Valve - Procedure

To verify that the dimensions of valves,


flanges, flange drilling, bore, stem,
threading, wall thickness and any other
dimensions, as applicable, comply with
the requirements of the specification
and other.
Witnessing required pressure tests.
Witnessing functional test of actuator
on valve, when actuators are specified.
Radiographic examination and other
NDE in accordance with the applicable
references noted above.

Third Party Inspection for Valve - Low


Pressure Air Test

when required by the contract or purchase


order, the third party inspector witnesses low
pressure air test and pays attention to the
following points:

Specialized testing of seats, the seals,


by-passes, etc., may be required by
purchase order.
A minimum of 2 gauges with correct
working ranges are used. The
calibration of the gauges needs to be
checked.

Third Party Inspection for Valve -


Hydrostatic Testing

The third party inspector checks all previous


items have been accepted by authorised
bodies and witness hydrostatic test and
verify following points:

Body tests, high pressure closure tests,


back seat tests as detailed in
applicable procedure and code
specification.
https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 8/13
11/22/2019 Third Party Inspection for Valve - Procedure

Calibration status and correct working


ranges of gauges. A minimum of 2
pressure gauges are attached to item
under test.
Adequate provision for venting of high
points and draining of the test medium
are provided.
Test pressure is applied as directed by
procedure or code until test limiting
pressure is reached. During hold
period, a methodical check for leaks is
conducted.
Test pressures, metal and water
temperatures are recorded.
Water quality is as specified.

These test normally are on "Hold Point" or


"Witness Point"

Third Party Inspection for Valve – Post


Hydrostatic Testing

After depressurisation, valve


components are drained and dried to
meet specified requirements.
Stamping of Inspection authority
stamps, are carried out in approved
area, as required by client/code.
Stamps used need to be low stress
type.
Application of desiccant/preservative
need to be as directed in client's
specification.

Third Party Inspection for Valve – Final


Inspection

All valves need to be checked for cleanliness


and dryness by third party inspector. Nozzle,
outlets, flanged or butt welded, saddle,
bracket locations and orientations against

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 9/13
11/22/2019 Third Party Inspection for Valve - Procedure

assembly drawings are controlled and


operation of valve indicator and correct
functioning also be checked.

Third Party Inspection for Valve - Name


Plate Checking

The third party inspector checks the content


in accordance with the approved drawings
and specifications and make sure it is
stamped in accordance with the code
requirements.

Third Party Inspection for Valve - Painting


and Coating

Surface preparation for painting is checked


for the following points, according to
specification by third party inspector:

Solvent Cleaning and Chloride Test


Cleaning method (brush-off blast
cleaning, commercial blast cleaning,
near-white blast cleaning, etc.)
Surface Profile measurements
Freedom from weld spatter, blow-holes
and other defects
Dry film thickness is checked according
to specification

Surface condition need to be free from pin-


holes, runs damage and other discontinuity.

Third Party Inspection for Valve - Spare


Parts, Loose Items and Accessories

Spare parts, loose items and accessories


are checked visually for their dimensions,
materials, workmanship and quantity,
according to the purchase order
specification.
https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 10/13
11/22/2019 Third Party Inspection for Valve - Procedure

Test marks and tags are checked for correct


identification.

Third Party Inspection for Valve -


Reporting:

TThe third party inspector provides an


Inspection Visit Report (IVR) after each
visit, as well as a final report summarizing
the activities carried out during the valve
production in accordance with the contract
requirements and circulated within the
time limits specified in the contract.

The report is in the format required by the


client and clearly indicates final acceptance
or rejection of the valve.

Third Party Inspection for Valve - Release


Note:

When required by the contract or purchase


order, a release note is issued by the third
party inspection agency and given to the
manufacturer when the valves have been
accepted.

Third Party Inspection for Valve -


Packing, Marking and Shipping:

The following points are checked by the third


party inspector:

Cleanliness and dryness of


components
Rust prevention for all machined
surfaces
Protection for cover for all opening and
protruding parts

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 11/13
11/22/2019 Third Party Inspection for Valve - Procedure

Packing style and suitably for overseas


transportation
Shipping marks and other markings

Third Party Inspection for Valve


- Final Book (Dossier)

The following final documents are reviewed


and signed off by the third party inspector:

As built drawings, Manufacturer's data


reports, Material certificate or certified mill
test reports for all pressure parts, Material
list or map, Welder record for each
weld, Heat treatment records (Temperature-
time record chart during
PWHT), Dimensional record, NDE
records, Pneumatic test record, Hydrostatic
test record, Hardness test record, Final
assembly checks, Marking inspection
report, Packing list, Spare parts list

Return to Third Party Inspection

Related Articles:

Third Party Inspection for Reciprocating Compressor,


Third Party Inspection for Centrifugal Pump, Third Party
Inspection for Gas Turbine, Third Party Inspection for
Steam Turbine, Third Party Inspection for Fan and
Blower, Third Party Inspection for Water Tube Boiler,
Third Party Inspection for Fire Tube Boiler, Third Party
Inspection for Shell and Tube Heat Exchanger, Third
Party Inspection for Fin Tube Heat Exchanger, Third
Party Inspection for Pressure Vessel, Third Party
Inspection for Storage Tank, Third Party Inspection for
Line Pipe, Third Party Inspection for Centrifugal
Compressor, Third Party Inspection for Steel Structure,
Third Party Inspection Services, Third Party Inspection

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 12/13
11/22/2019 Third Party Inspection for Valve - Procedure

Agency, Third Party Independent Inspection, Third Party


Quality Inspection

Did you find this article useful? Click on


below Like and G+1 buttons!

New! Comments
Have your say about what you just read!
Leave me a comment in the box below.

Share on  Facebook  Twitter

inspection-for-industry.com
Copyright © 2012-2013 Inspection-for-Industry.Com

https://www.inspection-for-industry.com/third-party-inspection-for-valve.html 13/13

You might also like