Common Activity : Piling Rig Equipment Operation.
Piling Rig
1 Equipment
Operation
Ensure sufficient protection to avoid
Underground and overhead Electric burn/Shock/ DE impact on utilities. Ensure diversion and Checking , Tool Box
P D R N - LC IPC 1 4 4 H proper protection of Identified utilities/ In- Charge - Viaduct,
utilities Major Injuries Talk
services lines. Barricading against
movement under OH Utilities.
Inspection at
regular intervals /
Hydraulic or break failure P ID R A Major Injuries/ - .- .- IPC 1 4 4 H Preventive maintenance of equipments. In- Charge - P&M
Preventive
Major Damage Daily Inspection of equipments. Maintenance of
Equipments
Inspection at
regular intervals / Incharge Viaduct, Incharge P&M
Wire rope / Chain Block failure P D R A Loss of property, - .- .- - 1 3 3 VL Wire rope / chain block assembly Preventive
& Execution Engineer
should be inspected for any damage Maintenance of
before loading. •. It should not have any Equipments
sign of worn out, broken strands,
reduction in diameter etc.
Inspection at
regular intervals /
Loose Electrical connections P D R A Major Injury due to - .- LC - 2 4 8 H Incharge Viaduct, Incharge
Electrical motor to be properly earthed. Preventive
Electrical shock Maintenance of P&M &Electrical Engineer
The electric panel and terminal box to
meet the electrical safety requirement Equipments
and protected from rain / possible
water splash. • The wire route should
be proper to avoid trip hazard or getting
crushed below possible equipment
movement. There should be no cuts or
temporary joints in Electrical cables.
Page 1
Piling work
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
High slipping hazard
for motorists, Fall of - Bentonite slurry to be collected in the RY017-QAC-MST- Incharge Viaduct, Incharge P&M
Piling work Bentonite slurry leakage C ID NR A .- .- IPC 2 2 4 H barricaded pit and transported to
person may cause 001,Rev 00 & HSE Engineer
suffocation planned location for disposal .Inspect
for cracks in the pipe. Ensure joints are
proper. Any leakage observed needs to
be arrested on priority.
Cage Lapping Injury to person, loss of property P D R A Minor Injury - - - - 3 2 6 L Use hand gloves as PPE, The cage In Charge - VIA DUCT
should be rested on the stand / skids
before starting cage lapping. Lapping to
be done as per design and ensure it
does not fall into the bored hole..
Soil should be tested and proper(wet or
dry) boring should be used depending
on type of soil. • Heavy equipment
should not be permitted near the bored
Collapse of bored pile pit P D R E Loss of time - - - - 1 2 2 VL pile pit. Soil properties for stability to be In Charge - VIA DUCT
considered in advance.
LOI/IECCL/ITNL/RM
Unapproved Methodology PS D R A Property Damage , - - - - 2 3 6 L Work shall be conducted as per the RG-II/2013-14/03 In Charge - VIA DUCT
Major Injury approved methodology.
(R-1)
Page 2
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Illumination shall be ensured at all work
Poor illumination / work in dark P D R A Property Damage , - - LC - 2 3 6 H area. No work shall be allowed in dark In Charge - VIA DUCT,In Charge -
Major Injury hours, in evening &in night without P & M & Electrical Engineer.
adequate lighting arrangement.
3 Soldier Piling
work
Operator
does not Tool Box talk /
Open Rototing Part(Cutting M/c) P D R A Property Damage , - - LC - 2 3 6 H like to Training on In Charge - VIA DUCT & Charge
Major Injury work with powered tools to be -P&M
Machine conducted
guards
All rotatory Part of cutting M/c shall be
covered to protect the cutting risk
Water
leakage Cross-checking of
Loose soil without compaction P ID NR E Soil collapse - - LC - 1 4 4 H Work shall be conducted as per the from utilities/ soil In Charge - VIA DUCT,In Charge -
approved methodology. nearby compaction shall be P & M & Site Engineer.
agencies done regularly
pipeline
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Water
leakage Cross-checking of
Loose soil P ID NR E Soil collapse - - LC - 1 4 4 H Work shall be conducted as per the from utilities / adequate In Charge - VIA DUCT,In Charge -
approved methodology. nearby soil compaction P & M & Site Engineer.
agencies shall be done
pipeline
Common Activity : Material Handling ( Lifting and shifting of pile heads and other materials etc )
Page 4
Manual
Material
Handling
5 ( lifting & HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
shifting of
Pile heads & Condition Over riding factor Likelyhood Seve Risk Adequacy of Measure
Type of Hazards
rity Score
other related)
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d n Authority
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
New
Joinee
w/o Regular monitoring
by HSE / HR-Admin
Fracture / Major Safety induction / Repeat Induction and health
Unsafe Act / Condition PS ID NR A Injuries/ Impact - - - - 2 2 4 L regular safety awareness drive for all check up staff to be vigilent In- Charge - Viaduct, Incharge
enough to stop any HR, SHE Engineer
Damage workers. Training on material handling. . with prior
disease such unsafe act /
condition at site
may be
present
Not
followin
g
Ensure safe lifting shifting of steel. instructi
on of Check-up & Tool
Vertical Ensure work is being done in
Long Vertical bars P D R N Site Box Talk and
Reinforcement fall - - - IPC 3 3 9 H supervision of site engineer with good Specific Training for
In- Charge - Viaduct
on sides and sturdy supports provided all times Forema
n supports.
against fall of vertical rebars.
6 Pier
Rejected
Safe handling of structural steel
Heavy Staging material including members. Adequate trained manpower lifting Always destroy
structural members, Bottom P D R N Major Injury - - - IPC 3 3 9 H slings is In- Charge - Viaduct
for work. Ensure inspection of lifting rejected slings
Shuttering Beams equipments with 3rd Party. being
used
Page 5
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Experienced personnel for
reinforcement cage erection work. Safe
Fall of Man Material techniques for erection, safe access,
complete platform. Cage Lowering to be
Cage lowering process P D R N on man working - - - - 3 2 6 L RY017-QAC-MST- In- Charge - Viaduct
underneath and done only when all person are clear of 004 (R-1)
any danger from being hurtEnsure
nearby authorized person at site. Employ
workers who are Medically fit for height
7 Pier Cap work
Fire in Hassian cloth P ID R E Property damage, - - - - 3 2 6 L Hot work safety to be maintained near Tool Box Talk. In- Charge - Viaduct
Hessain cloth fixing for any spark.
Page 6
8 Portal work
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d n Authority
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
8 Portal work
Experienced personnel for Boom Placer
Hit by Boom placer operation work. For holding chute rope Rope not
guide must be used. Check ground available
Concreting by Boom Placer P D R A pipe, fall of boom - - - - 4 4 16 H Check-up & Tool In- Charge - Viaduct / Site
placer, Hit by ball condition to be sound before with Box Talk. Incharge for Portal Erection
placement of Boom Placer. Ensure Boom
passing
authorized person at site & Medically fit Placer
for height work
Work to be done
Experienced personnel for Portal over portal with
erection work. Safe techniques for adequate fall
Fall of Man Material
erection, safe access, complete arrestor devices
Public if allowed under Portal P ID R E onPublic moving DE - - IPC 5 3 15 H platform. Ensure authorized person at under Site Engineer In- Charge - Viaduct / Site
underneath Portal Incharge for Portal Erection
site. No one is allowed to work over supervision only
and nearby Portal w/o Safety Net to arrest smallest once Public is
possible material to fall. allowed underneath
Portal
Not visible
signal
Synchronized operation of both cranes from Always place crane
shall be performed by competent
Unsafe operation of Cranes PS D R E Major Injury, Severe - - - - 1 4 4 M rigger due with active In Charge Casting yard & Lifting
damages operator. Competent Operator shall be to physical involvement of Engineer
engaged to operate both Gantries.
Banksman to be deployed all the times. obstacle/ crane operator
direct Sun
over head
Unaware
Handling of tool & tackles shall be with man
Fall of material P D R A Major Injury, Severe - - - IPC 2 3 6 H Keep an eye on In Charge Casting yard & Lifting
safe manner and throwing of material passing
Girder Lifting damages shall not allowed at all. underneat such person by HSE Engineer / HSE
9
& Loading h
Page 7
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
Girder Lifting n
Gap (if
9 L S LXS Existing Control Control Measure
IPC
DE
CE
LC
& Loading any)
N/A/E
R/ NR
D/ ID
Traffic Marshal shall be available with
Crush hazards P ID R N Major Injury Severe - - - - 2 2 4 VL In Charge Casting yard & Lifting
Gantry cranes to control the unsafe
damages movement of people Engineer
New
No person to be allowed to operate joining Never do trial w/o
Unauthorised operation P ID NR A De-railing - - - IPC 1 4 4 H In Charge Casting yard, Incharge
gantry crane other than Authorised operator presence of P&M P&M, Lifting Engineer
Person doing trial Engr
on GC
Gantry
Inspection through Operator for any
crane
defect on rail shall be performed on positioned
daily basis and before start the shift. Gantry operator to
De-railing P ID R N Major Injury, Severe - - - IPC 1 4 4 H in any In Charge Casting yard, Incharge
damages Daily cranes to be locked at parking other double check P&M, Lifting Engineer
position or during WIP to be hold with locking condition.
place than
Heavy load to avoid any derailing due to designate
heavy wind.
d
Banksman to be
Girder
Before leaving from casting Yard, Girder hitting by vigilant enough to
shall be tied through the choker belt or find ways to avoid
Tilting & falling of Girder P ID R A Minor damages - - - - 2 2 4 VL rash & In Charge Casting yard & P&M,
webbing slings. Execution In charge negligent such occurences/ & Viaduct, Traffic Supervisor
shall ensure the stability of Girder on Tool Box talk to be
driving by
Trailer. public conducted before
every trip.
Communi
Erection team, Execution In Charge shall cation gap Prior clear
visit of all site location in advance for between communication to
Wrong movement of crane PS ID R A Major Injury, Severe - - - IPC 2 4 8 H Viaduct In charge , Erection
damages, Time Loss transportation of Cranes and then only Crane be passed by Lifting Engineer, Lifting Supervisor
plan fro actual crane placement based operator Incharge to Crane
on best possible action.. and Operator
banksman
Page 8
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
after
testing
Soil Compaction test to be conducted condition
Condition of ground P ID R A Major Injury, Severe - - - - 2 4 8 M chaged Regular monitoring In Charge - VIA DUCT
and approved as OK for Crane
damages positioning due to by site supervisor
weather
or utility
failure
Sufficient warning
Banksman / Traffic Marshal & No light / lights to be Viaduct In charge , Erection
Hiting to person and piers PS D R N Major Injury, Severe - - - IPC 3 4 12 H
damages Supervisor shall be available all the time Dark provided for Engineer, Lifting Supervisor,
to guide during trailer movement. road /area marking Girder Traffic Incharge
circumference
Sub-Activity - Lifting Applinace. Gears, Tools & Tackles fixing with Girders
Page 9
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Lifting in field of OH shall not allowed.
No work shall be permitted to work
without work permit/ shutdown taken Wrong OH
from Government authority near OH Actual deenergising
P ID R A Major Injury - - LC IPC 1 4 4 H line process to be Viaduct In charge , Lifting
Electrocution due to OH Line line. deenergis Supervisor
verified by HSE
ed
Sub-Activity - Work At Height, Fixing / Resting of Girder on Bearing and Removal of Lifting Tools & Tackles
Work At
Height, Fixing Banksman shall be available all the time
/ Resting of Major Injury, Severe -
to guide during such activities specially
Viaduct In charge , Lifting
Girder on Crush Hazards P D R N - - IPC 1 4 4 H at night. Do not sit between dead end
11C damages Supervisor
and moving load, always wait for load to
Bearing and stabilize.
Removal of
Lifting Tools
& Tackles
Required level of illumination shall be
maintained at work location.
Page 10
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Do not throw any material from height,
ensure area under is safely barricaded
with 1 person watching deshuttering
Deshuttering hazard P D R N Major Injury by _ _ _ IPC 1 4 4 H process all the times at all cost. Ensure
material hit all required PPEs for workers at site.
Keep barricading board at distance with
reflective taped warning message man
at work for night work
On site Girder
12 stitching Do not throw any material from height,
activity ensure area under is safely barricaded
Fall of Men & Material P D R N Major Injury by _ _ _ IPC 1 4 4 H with 1 person watching Tools Tackles RY017-QAC-MST- Viaduct In charge , Site
material hit removal process all the times at all cost. 009, Rev 00 Supervisor
Ensure all required PPEs for workers at
site.
Page 11
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/
DiaphragmService/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d Authority
13 Concreting n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
Work any)
N/A/E
R/ NR
D/ ID
Concreting work and any other activities
shall not allow in dark hrs. During night
Work in dark P D R A First Aid, LTI - - - IPC 2 3 6 H shift adequate level of illumination shall In- Charge -Viaduct & P&M,
be maintained. Traffic Marshal with
adequate Safety Batons/ Torch to guide
away public from hazards
Unnecessary Work delay PS ID NR A Fall of lifting tools - - - - 3 2 6 M Plan work so that no unnecessary delay Check-up & Tool In- Charge - Viaduct
Tackles / Cranes in work is allowed Box Talk.
Page 12
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio
Implementation Competent
Product d n Authority
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Railing
15 fixing /
Painting
activity
Page 13
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Type of Hazards
rity Score
Risk
S. No Activity/ Service/ H&S Hazard Activity
Hazar H&S Risk Classificatio Implementation Competent
Product d Authority
n
L S LXS Existing Control Gap (if Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Railing Experienced personnel for Parapete
erection & Parapet fixing by casting in
15 fixing / situ(Manual) work. Safe techniques for
Engineers
All personal
Painting Flying nails by nearby carpenter, P D R A Property Damage , - - etc.
unskilled worker - IPC 4 2 8 H erection, welding, safe access, complete
inspecting
working nearby to Viaduct In charge , Incharge HSE
Major Injury
activity platform. Ensure authorized person at
work
wear safety goggles
site. Employ workers who are Medically
fit for height work
Distance
All the time egress route to be made between
Not able to reach point of Always ensure
Person feeling drowsy or fit attack PS D R E availableMock Drill to be conducted
Hospital within Golden - - LC - 4 2 8 H
identify all possible gaps in rescue work and shortest possible Viaduct In charge , Incharge HSE
hour egress distance for egress
arrangement.
ladder is
very far
Regular Checking
Protection to avoid shock on Failure of of welding
Electrical shock P D R N Electric burn/Shock/ - .- LC - 2 4 8 H equipments is to be ensured. Only safety equipments for any In- Charge - Viaduct,
Major Injuries trained welder to work who is aware of gadget on insulation related
Electrical hazards machine failures , Tool Box
Talk
Abbrevations:
D/ID Direct/Indirect Likelyhood Rating Severity Rating Risk Score Level Control Plan Categories of Hazards
Probability
R/NR Routine/Non Routine Exposure of Score Severity Score Risk 1 <=4 Very Low Normal Precaution Adhered P Physical Hazards
Risk Score
=
N/A/E Normal/Abnormal/Emergency Continuous 5 Several Fatality 5 Likely 2 05 <=08 Low Prepare OCP if not there, Training & Strict Supervision C Chemical Hazards
hood
Score
DE Domino Effect Daily 4 One Fatality 4 X 3 09 <=12 Medium Follow OCP + Step 2 E Ergonomical Hazards
Severi
IPC Interested Party Concern Monthly 3 Serious Injury 3 ty 4 13 <=16 High Prepare Riask Control + step3 & bring to Level 3 B Biological Hazards
Score
CE Chronic Effect Yearly 2 Major Injury 2 5 17 <=25 Very High Alternative: Safe Process / outsource / +Step 4 PS Psycho-Social Hazards
Signature/ Date
Page 14
PROJECT SHE MANAGEMENT SYSTEM
ITNL-KMB (JV) UAA09 HAZARD IDENTIFICATION AND RISK ASSESSMENT FOR CHENNAI METRO RAIL PROJECT.
SLICING / DEMOLITION WORKS.
JOB : Design Validation and Construction of works of underground station (Excluding Station Diaphragm Walls) & Associated Structures at Concourse, Platform Level, Entry/Exit, Ancillary Building, Pump house, Water
Tanks, Ventilation Shafts, Plumbing and Earthmat etc., and Architectural Finishes, Signage's etc. at Sir Thiyagaraya College & Korukkupet Station, including cut & cover tunnel and Ramp (UG & Elevated CH.2052 TO CH.
2869)
Common Activity :
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
Common Activity: ( Initial Survey, Slicing works)
Protecting of Surface
encumbrances, Safe access and
egress. Adequate lighting Method
Falling/ slip / Trip No prior-
Fractures/ Major arrangement, Identification of Statement MS-
Hazards/ Open drain & P ID R A - - - IPC 4 2 8 H drawing Station In- Charge.
Injuries underground utilities and 01 Slicing
holes, Electrocution available
protection to avoid any damage. attached
Work under overhead line with
proper shutdown permit.
Prolonged
1. Hold firm
exposure
2.secure chisel firm to the jack. Mandatory
Dismantling concrete causes New
P D R A - - - IPC 4 2 8 M 3.Rotation of work force to avoid PPEs with all Station In- Charge.
Foundations occupational location
prolonged exposure workers
disease called
white finger
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Likeliho Severit Risk
Condition Over riding factor od y Score Adequacy of Measure
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
1. Employ trained operator.
2. Careful operation.
Using Excavators
3. Keep 15 M away from the Always work
breaker:-Fall of Major Injuries / New
P ID R A - - LC - 5 2 10 H overhead lines. cautiously and Station In- Charge.
hammer, Overhead Electrical shock location
4.strict adherence of work remain vigilant
lines
permit.
Water sprinkling
should be done,
Pulmonary
Dust P D R A - - LC IPC 4 2 8 M Use nose mask. if dust Station In- Charge.
disorders
generated is
1
more
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
Provision of cautioning and
barricading boards to avoid
Un-noticed hazards Public interference. Ensure
( after work hrs) at P ID R A Major Injuries - - - - 2 2 4 VL administrative control by Station In- Charge.
incomplete work Security. Designated exit / entry.
Checking to ensure no person is
sleeping after duty hrs.
Initial
Survey, Ensure work permit near over
Slicing & head line. Prior Identification and Pre Inspection
diversion of utilities to be made. of work Site for
Demolition Damage to Local
Protection to avoid any damage verification with
works, underground, overhead Warning
Major Injuries/ of utilities, during operation. Drawings & in
utilities (elect. Telecom, P ID R A - - LC IPC 3 2 6 H marking Station In- Charge.
Impact Damage Work under experienced Client's
Gas & water pipe line got
supervision. Always consult with presence.
etc.) damaged
Client and related authorities Training on
before taking into any type of excavation.
excavation work.
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
FENCING WORK- WORK AREA BARRICADING
Always keep in
touch with
Don’t Allow Dogs at work area
Hospital about
and site. In case of any Dog
No Anti- anti venom kits
biting immediate treatment to be
Dog biting, Snake venom kit availability.
Illness/ Death/ provided. Control to stray I Station In- Charge., HSE
biting, stray animal P ID R A DE - - - 2 3 6 H available Avoid dark
Fractures animal to enter at site and on in charge
getting under vehicles. with areas long
snake biting immediately shift
Hospital grass to work.
patient to Hospital after first aid
Work Area Wear tall boots,
treatment work area.
Barricading long pants and
/ Fencing / leather gloves
Board
cleaning
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
Always wear
your safety
reflective
Rash and
Always keep safe distance from jackets to be
negligent
Muscle approaching public vehicles. more visible.
Hitting/ Impact during behavior of
P ID R N strain/Fractures, - - - IPC 5 4 20 H Keep safety cones at the time of Never try to
board cleaning Public /
major Injury board cleaning. Never work stop a vehicle
Company
alone for board cleaning. by standing in
Drivers
Work Area front of
Barricading speeding
/ Fencing / vehicle.
Board
cleaning
Common Activity : SCAFOLD ERRECTION and HEIGHT WORK (e.g. Repairing and strengthening of concrete structures)
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
Always be
vigilant for any
leaking water
pipeline nearby
base of
Leaking
Ensure good soil compaction for scaffolding
Ground soil condition, water Respective In charges,
P ID R A Major Injuries - - - IPC 2 4 8 M scaffold verticals positioning. All Check-up &
missing components pipeline P&M, SHE Supervisor
components to be ensured with Tool Box Talk
nearby
and Specific
scaffold
erection
Training by 3rd
party.
directly
supervisor
Always look for
Always plan in advance for any decided to
such unsafe
No preplanning for height work to reduce risk and work w/o Respective In charges,
PS ID R A Major Injuries - - - - 2 4 8 L acts and inform
height work do as much work at ground level information P&M, SHE Supervisor
to respective in
as possible. to
charges
respective
in charge
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Likeliho Severit Risk
Condition Over riding factor od y Score Adequacy of Measure
Type of Hazards
Activity/ Hazar Risk
Activity d Implementation Competent
S. No Service/ H&S Hazard H&S Risk Classificati
Product on Authority
L S LXS Existing Control Gap (if any) Control Measure
IPC
DE
CE
LC
N/A/E
R/ NR
D/ ID
Security to be
During instructed to act
Security to be vigilant for all holidays accordingly
Some mentally Respective In charges,
ladders for such unsafe acts. If some emergency
disturbed person climbs PS ID R E Major Injuries - - - IPC 2 4 8 H P&M, HR&Admin In
no work is underway remove person situation and
on top of girder charges, SHE Supervisor
such ladders doing inform
unsafe act HR/Admin/Hse
SCAFOLD immediately
ERRECTION
AND
HEIGHT
WORK
Sick
Always look out
person Respective In charges,
Proper Illumination. Medical for such unsafe
height phobia, Poor coming at P&M, HR & admin
PS D R A Major Injuries - - - - 3 2 6 L checkup of all workers to avoid condition of
illumination. site to Incharges, Security Person,
any sickness of height phobia. worker at entry
avoid SHE Supervisor
point level.
absents
Abbreviations:
D/ID Direct/Indirect Likelyhood Rating Severity Rating Risk Level Control Plan Categories of Hazards
Probability
R/NR Routine/Non Routine Exposure of Score Severity Score 1 <=4 Very Low Normal Precaution Adhered P Physical Hazards
Risk
Risk Score
N/A/ Normal/Abnormal/Emergency Continuous 5 Several Fatality 5 = 2 05 <=08 Low Prepare OCP if not there, Training & Strict Supervision C Chemical Hazards
E Likelyhoo
d Score X
Severity
DE Domino Effect Daily 4 One Fatality 4 Score 3 09 <=12 Medium Follow OCP + Step 2 E Ergonomically Hazards
IPC Interested Party Concern Monthly 3 Serious Injury 3 4 13 <=16 High Prepare Risk Control + step3 & bring to Level 3 B Biological Hazards
CE Chronic Effect Yearly 2 Major Injury 2 5 17 <=25 Very High Alternative: Safe Process / outsource / +Step 4 PS Psycho-Social Hazards