This refers to the Environmental Compliance Certificate (ECC) application for the
proposed Bissayot Resort to be located at Brgy. Comillas North, Cervantes, Ilocos Sur.
After satisfying the requirements of the said application, this Bureau has decided to grant
an ECC for the above-mentioned project.
With the issuance of this ECC, you are expected to implement the measures presented in
the Initial Environmental Examination Checklist (IEEC), intended to protect and mitigate the
project’s adverse impacts on community health, welfare and the environment. Environmental
considerations shall be incorporated in all phases and aspects of the project.
This Certificate does not create any right nor shall be used as an authorization to
implement the project, you may proceed with the implementation only after securing all
necessary permits and/or clearances required by other pertinent Government
Agencies/Offices that have administrative jurisdiction over such projects/operations (i.e.
DENR, EMB, LGU, DOT, NWRB, etc.). This Office shall be monitoring the project
periodically to ensure strict compliance with the stipulations in the attached ECC.
SUBJECT ONLY to the conditions and restrictions set in this ECC and
in the attached documents labelled as Annexes A and B.
PROJECT DESCRIPTION
The ECC covers the construction and operation of a 4,772 - Square
Meter Resort Project consisting of three (3) units cottage,
lobby/reception area two (2) units public washroom/toilets, five (5)
units swimming pool (2-kiddie pool, 2-adult pool & 1-natural hot
spring pool), convenient store, bar & restaurant, kayaking/boating,
fish spa, fish pool therapy, fish pond, parking area, multi-purpose
hall/admin building, gazebo and other support facilities. [Edit project
description]
Recommending Approval:
Approved:
ENVIRONMENTAL MANAGEMENT
GENERAL CONDITIONS
10. The Proponent shall notify the EMB Regional Office and submit an
abandonment mitigating plan for approval at least three (3) months prior
to project abandonment;
11. The Proponent shall allow DENR-EMB Personnel with valid identification
card and travel/mission order to conduct inspection/monitoring in the
entire premises even without prior notice to monitor compliance with
ECC conditions and other environmental laws, and implementation of
approved EMP. Further, on-the-spot monitoring and inspection can be
initiated by the DENR any time in coordination with concerned parties;
II. RESTRICTIONS
12. No other activities shall be undertaken other than what were stipulated
in the IEEC. Any expansion of the project beyond the project description,
or any change in the activity or transfer of location shall be the subject of
a new Environmental Impact Assessment;
14. Transfer of ownership of this project shall carry the same conditions and
restrictions and the transferee shall be required to notify the EMB RO1
within fifteen (15) days from the transfer of ownership to allow the