100% found this document useful (1 vote)
646 views

Plant Operator PDF

Hafiz Haris Naeem has over 5 years of experience operating large petrochemical plants and power plants in Pakistan. He has experience operating critical equipment like CO2 compressors, pumps, reactors, and turbines. Currently he is a commissioning and plant operator at ICI Pakistan's polyester plant where he helped commission a 15MW coal power plant and operates their 240 ton/day polymer plant. He is seeking new opportunities as a plant operator where he can use his skills in operations, troubleshooting, and process monitoring and control.

Uploaded by

Haris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
646 views

Plant Operator PDF

Hafiz Haris Naeem has over 5 years of experience operating large petrochemical plants and power plants in Pakistan. He has experience operating critical equipment like CO2 compressors, pumps, reactors, and turbines. Currently he is a commissioning and plant operator at ICI Pakistan's polyester plant where he helped commission a 15MW coal power plant and operates their 240 ton/day polymer plant. He is seeking new opportunities as a plant operator where he can use his skills in operations, troubleshooting, and process monitoring and control.

Uploaded by

Haris
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

mianharis721@gmail.

com

PLANT OPERATOR
Name: HAFIZ HARIS NAEEM
Mobile: +923146886788/ 03081934804
Email /Skype Id: [email protected]
Muslim / Pakistani
HOUSE #209, STREET #4 Naimat colony No 1 Faisalabad, Pakistan

Career Objective:
 I have more than 5 Years of Professional Experience in commissioning and operating of large
Petrochemical Industry, Power Plant and Fertilizer Sector also having 2 years Apprenticeship
from well reputed Process Industry Fatima Fertilizer Limited.
 I am Expert in Operating Large HP Multi Stages CO2 Compressors 3200psig, Air Compressors, PD
Pumps, Centrifugal Pumps, BFW Pumps, Hydrolyser Stripper Unit, Urea Decomposition Unit, CO2
Absorbers, Vacuum Concentrator Unit, Polymerization Reactor (UFPP), H2O separation column
UREA REACTORS, Multistage Steam Turbines, Condensers, Cooling Tower, RO Plant and EDI Unit.
 My Experience includes operating, controlling, monitoring, commissioning, pre commissioning, start up,
shut down, emergency handling, and troubleshooting.
 Excellent skills of monitoring and controlling the Process from Field, PLCs and DCS HMIs.
 I’m a Computer literate & Good Spoken English Language.
Currently working on 240tons/day capacity CP Polymer Plant of ICI Polyester Ltd Pakistan
Industrial Job History: 5 Years
01/2019 until now Commissioning & DCS Plant Operator - ICI Pakistan ltd Polyester Business.
Commissioning of 15MW coal Fired Power Plant and working on 240ton/day CP Polymer Plant.
5/2018 to 1/2019 Power Plant Control Room Operator - Sitara Chemical Industries ltd (CFPP)
40MW Coal Fired Power Plant, operating 35MW Condensing Steam Turbine & Cooling Tower.
12/2015 to 5/2018 Chemical Plant Operator - Fatimafert Ltd (Ammonia & Urea Plant) Pakistan.
Responsible for safe operation of Critical Equipment's and Sections of 1650ton/day Urea Plant.
Work Experience

ICI Pakistan limited - Polyester Business Lahore Road


Designation: Commissioning & Plant Operator From 01/2019 until now

ICI Polyester is one of the world's largest & most successful producers of Polyethylene terephthalate.
 Start-up, shut-down and troubleshoots handling of 240tons/day capacity of CP Polymer Plant.
 Monitoring & control the process reactions TPA Slurry Preparation, Esterification, Polymerization by
safe operation of process equipment ( Esterifier, H2O separation column, Up-Flow Pre-Polymerizer
(UFPP), spray condenser, hot well, final reactor Finisher, Polymer Pump by defined SOPs procedures.
 Taken part in erection, commissioning, testing and starting up of the 15MW coal Fired Power Plant.
[email protected]

Sitara Chemical Industries Ltd Pakistan Coal Fired Power Plant 40MW.
Designation: Control Room Operator From 5/2018 to 1/2019

I had performed duty as a Central Control Room DCS Operator of Sitara Chemical Coal Fired Power Plant
(CFPP) 40MW on Steam Turbine and Cooling tower. Monitoring/ controlling of 35MW Steam Turbine, its
Auxiliaries from Field & DCS HMIs. This Plant having 40MW condensing Steam Turbine & High Pressure
CFB water Tube Boiler of capacity 150T/h and 99bar.
Steam Turbine 40MW Unit:
 The turbine is a single casing Multi-stage impulse, Reaction, Extraction and condensing Type HNK
50/80/32, has a reduction gearbox FLENDER & a generator Jinan Power Equipment.
 Maximum Inlet Steam Conditions 9.5Mpa/5400C, Flow 146.8t/h, 5114 r/min & Power 40MW.
 Multi Stages Boiler Feed Water Pump Capacity 163m3/h Pressure 120 bar.
 Deaerator Capacity 79t/h LP heater HP Heaters 1 & 2 for pre heating of BFW to 2150C.

Cooling Tower: Induced Drat Type


 Cooling Tower Induced draft Type, 3 cells having capacity of 12000 Ton/h.
 Cooling water Circulating High Flow Rate Pumps each 4000m3/h. Driven by 11000V Motors.

Fatimafert Ltd (Ammonia & Urea Fertilizer Plant) Pakistan.


Designation : Chemical Plant Operator From 12/2015 to 5/2018

 Fatima Fert Company Ltd is the huge Urea fertilizer producer of Pakistan having capacity 1,500 MTPD
of Urea, 890 MTPD of Ammonia (NH3). The first fertilizer manufacturing company to obtain ISO-
9001:2000 certification in Pakistan.
 OHSAS 18001:2007 Safety Management System Certified by TUV Austria
 ISO 14001:2004 Environment Management System Certified by TUV Austria
 ISO 9001:2008 Quality Management System Certified by TUV Austria

 Responsible for safe operation of Critical Equipment's and Sections of 1,500MTPD Urea Plant
Urea Synthesis Section High Pressure Critical Equipment: 3200psig
Operate High Pressure UREA REACTORS 3830F/ 3200#, HP Reciprocating 5 Stages CO2 Compressors
350000 SCFH, 3500Hp, Air Compressors, 6 HP PD Plunger type 3200psig Ammonia & Carbamate Feed
Pumps. Back Pressure Steam Turbines, Heaters, Let down valves & Moto Yama Valve

High Pressure and Low Pressure Decomposition Section:


HP Decomposers & CO2 Absorbers, Liquid distributor, First Separator, LP Decomposers & LP Absorbers,
Liquid Distributors, First Separators, HPAC & LPAC, Degasser & NH3 condensers.
Urea Concentration and Hydrolyser Stripper Section:

Urea Concentrator under Vacuum by steam jet ejectors, barometric Condenser & Hot well,
Hydrolyser Stripper having 40 Bubble caps trays for Purifying waste water and recover NH3 & CO2.
[email protected]

Achievements:
 Successfully involved plant Turnarounds activities and many startup/shutdowns activities performed
 Take part in Pre commissioning, testing and startup activities of 15MW coal Fired Power Plant. 2019
 Handling different type of plant Emergencies i.e. Power Failure, Air Failure, CW failure, NH3 Leakage.
HSE Training Courses and Safety Awareness:
 DuPont Process Safety Management (PSM).22 Elements Complete Training.
 Permit to work System (PTW). Accept of all Kind o Work Permits.
 Fire Safety Management. Using of Fire extinguishers & Monitor Nozzles Also Member of ERT.
 Rescue Training at Petrochemical Plant by First Aid, CPR & Self Contained Breathing Apparatus.
 Work Shop and Weekly Safety Drilling for Emergency Response Team during Emergency.

Responsibilities & Role as a Plant Operator:


 Ability to start-up, shut-down, troubleshoots and carries out routine operation of Plant.
 Monitor the safe operation of process equipment with defined standard operating procedures.
 Very Good Knowledge of DCS/PLC systems/Control Panels/Control Loops & its Interlocking.
 Reporting to Shift Engineer about the field equipment condition to keep the plant at full load.
 Log sheets fillings and startup and shutdown checklist preparation.
 Routine check-up of all stationary and rotary equipment in the unit.
 Able to work collaborate in team with USE, SEIC & Section Operators.
 Perform (LOTOTO) before doing any job as per PTW procedures at Plant.
 Hand over & Takeover of all kind of work permits including JSA or TRA.
 Basic Knowledge of Control Valves, Transmitters, P&ID, PFD’s, work instructions and SOPs.
 I Have the Member of Emergency Response Team (ERT) in Fatimafert Ltd- 2018.
 Ensures all required PPE’s at Plant & Read MSDS before using any Chemical.
 Inspect and upkeep the safety showers, fire extinguisher, firefighting equipment in the field.
Language and Computer Skills:
 Fluent in English both speaking and writing also good communication and human relations skills.
 Very good knowledge of Using MS-Office, word, windows, operating system & Explorer browsers
Education:
FSC (Pre-Engineering) 2015
Passed the FSC from Superior College Faisalabad. With the percentage of 66% and got 1st division
Matriculation 2013
Passed the matriculation in Science from Govt A.V Modern High School with 87% and got “A+” Grade

Personal Information:
Father’s Name Naeem Akhtar
Date of Birth 24-12-1994
Nationality Pakistani
Marital Status unmarried

You might also like