Plant Operator PDF
Plant Operator PDF
com
PLANT OPERATOR
Name: HAFIZ HARIS NAEEM
Mobile: +923146886788/ 03081934804
Email /Skype Id: [email protected]
Muslim / Pakistani
HOUSE #209, STREET #4 Naimat colony No 1 Faisalabad, Pakistan
Career Objective:
I have more than 5 Years of Professional Experience in commissioning and operating of large
Petrochemical Industry, Power Plant and Fertilizer Sector also having 2 years Apprenticeship
from well reputed Process Industry Fatima Fertilizer Limited.
I am Expert in Operating Large HP Multi Stages CO2 Compressors 3200psig, Air Compressors, PD
Pumps, Centrifugal Pumps, BFW Pumps, Hydrolyser Stripper Unit, Urea Decomposition Unit, CO2
Absorbers, Vacuum Concentrator Unit, Polymerization Reactor (UFPP), H2O separation column
UREA REACTORS, Multistage Steam Turbines, Condensers, Cooling Tower, RO Plant and EDI Unit.
My Experience includes operating, controlling, monitoring, commissioning, pre commissioning, start up,
shut down, emergency handling, and troubleshooting.
Excellent skills of monitoring and controlling the Process from Field, PLCs and DCS HMIs.
I’m a Computer literate & Good Spoken English Language.
Currently working on 240tons/day capacity CP Polymer Plant of ICI Polyester Ltd Pakistan
Industrial Job History: 5 Years
01/2019 until now Commissioning & DCS Plant Operator - ICI Pakistan ltd Polyester Business.
Commissioning of 15MW coal Fired Power Plant and working on 240ton/day CP Polymer Plant.
5/2018 to 1/2019 Power Plant Control Room Operator - Sitara Chemical Industries ltd (CFPP)
40MW Coal Fired Power Plant, operating 35MW Condensing Steam Turbine & Cooling Tower.
12/2015 to 5/2018 Chemical Plant Operator - Fatimafert Ltd (Ammonia & Urea Plant) Pakistan.
Responsible for safe operation of Critical Equipment's and Sections of 1650ton/day Urea Plant.
Work Experience
ICI Polyester is one of the world's largest & most successful producers of Polyethylene terephthalate.
Start-up, shut-down and troubleshoots handling of 240tons/day capacity of CP Polymer Plant.
Monitoring & control the process reactions TPA Slurry Preparation, Esterification, Polymerization by
safe operation of process equipment ( Esterifier, H2O separation column, Up-Flow Pre-Polymerizer
(UFPP), spray condenser, hot well, final reactor Finisher, Polymer Pump by defined SOPs procedures.
Taken part in erection, commissioning, testing and starting up of the 15MW coal Fired Power Plant.
[email protected]
Sitara Chemical Industries Ltd Pakistan Coal Fired Power Plant 40MW.
Designation: Control Room Operator From 5/2018 to 1/2019
I had performed duty as a Central Control Room DCS Operator of Sitara Chemical Coal Fired Power Plant
(CFPP) 40MW on Steam Turbine and Cooling tower. Monitoring/ controlling of 35MW Steam Turbine, its
Auxiliaries from Field & DCS HMIs. This Plant having 40MW condensing Steam Turbine & High Pressure
CFB water Tube Boiler of capacity 150T/h and 99bar.
Steam Turbine 40MW Unit:
The turbine is a single casing Multi-stage impulse, Reaction, Extraction and condensing Type HNK
50/80/32, has a reduction gearbox FLENDER & a generator Jinan Power Equipment.
Maximum Inlet Steam Conditions 9.5Mpa/5400C, Flow 146.8t/h, 5114 r/min & Power 40MW.
Multi Stages Boiler Feed Water Pump Capacity 163m3/h Pressure 120 bar.
Deaerator Capacity 79t/h LP heater HP Heaters 1 & 2 for pre heating of BFW to 2150C.
Fatima Fert Company Ltd is the huge Urea fertilizer producer of Pakistan having capacity 1,500 MTPD
of Urea, 890 MTPD of Ammonia (NH3). The first fertilizer manufacturing company to obtain ISO-
9001:2000 certification in Pakistan.
OHSAS 18001:2007 Safety Management System Certified by TUV Austria
ISO 14001:2004 Environment Management System Certified by TUV Austria
ISO 9001:2008 Quality Management System Certified by TUV Austria
Responsible for safe operation of Critical Equipment's and Sections of 1,500MTPD Urea Plant
Urea Synthesis Section High Pressure Critical Equipment: 3200psig
Operate High Pressure UREA REACTORS 3830F/ 3200#, HP Reciprocating 5 Stages CO2 Compressors
350000 SCFH, 3500Hp, Air Compressors, 6 HP PD Plunger type 3200psig Ammonia & Carbamate Feed
Pumps. Back Pressure Steam Turbines, Heaters, Let down valves & Moto Yama Valve
Urea Concentrator under Vacuum by steam jet ejectors, barometric Condenser & Hot well,
Hydrolyser Stripper having 40 Bubble caps trays for Purifying waste water and recover NH3 & CO2.
[email protected]
Achievements:
Successfully involved plant Turnarounds activities and many startup/shutdowns activities performed
Take part in Pre commissioning, testing and startup activities of 15MW coal Fired Power Plant. 2019
Handling different type of plant Emergencies i.e. Power Failure, Air Failure, CW failure, NH3 Leakage.
HSE Training Courses and Safety Awareness:
DuPont Process Safety Management (PSM).22 Elements Complete Training.
Permit to work System (PTW). Accept of all Kind o Work Permits.
Fire Safety Management. Using of Fire extinguishers & Monitor Nozzles Also Member of ERT.
Rescue Training at Petrochemical Plant by First Aid, CPR & Self Contained Breathing Apparatus.
Work Shop and Weekly Safety Drilling for Emergency Response Team during Emergency.
Personal Information:
Father’s Name Naeem Akhtar
Date of Birth 24-12-1994
Nationality Pakistani
Marital Status unmarried