Piping Calculations
Piping Calculations
AREA 3817.8
PIPE ID 69.7
Total Flowrate = 750 GPM Density= 64 lb/ft3 Kinematic Viscosity = 1.15 centistokes
= 170.33 m3/hr = 1.24E-05 ft2/s
= 1.15E-06 m2/s
Pump Suction
Total Flowrate = 750 GPM Density= 64 lb/ft3 Kinematic Viscosity = 1.15 centistokes
= 170.33 m3/hr = 1.24E-05 ft2/s
= 1.15E-06 m2/s
Summary
Total Presure Drop Due to friction and fittings 4.726 m
Elevation 2.5 m
Total Head Loss 7.226 m
= 0.722584 Bar
Schedule Schedule Schedule Schedule Schedule
Nominal Nominal 10 20 30 Standard 40 60
O.D.
Pipe Size Pipe Size
mm
(Inches) (mm) Wall. Wt. Wall. Wt. Wall. Wt. Wall. Wt. Wall. Wt. Wall. Wt.