QAQC Form
QAQC Form
: P15-3B
PESTECH SDN BHD Rev. No. : 1
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
: PLS 150129
:
_________ (date)
ALLATION WORK
:
:
Witness By:
Client Representative
Requested by : Received by :
Date/Time : Date/Time :
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
_ (date)
Witness By:
nt Representative
Requested by : Received by :
Date/Time : Date/Time :
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
_ (date)
Witness By:
nt Representative
Requested by : Received by :
Date/Time : Date/Time :
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
_ (date)
Witness By:
nt Representative
Requested by : Received by :
Date/Time : Date/Time :
The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)
B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action
Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative
_ (date)
Witness By:
nt Representative