Design and Engineering Manual - DEM2
Design and Engineering Manual - DEM2
Basic Requirements
Purpose
To prevent re-occurrence of known major Process Safety Incidents by focussing on their
main causes and key Barriers.
Assets owned or operated by a Joint Venture in which Shell does not have a
Controlling Interest,
if the Joint Venture partners adopt this Manual following promotion by the Shell
Shareholder Representative as stated in JV HSSE Requirements;
contracted 3rd party Assets, including temporary boilers, liquid nitrogen storage, and
power generators; and
land transport activities by vehicles used to transport Hazardous Substances.
1
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Requirements
The Asset Manager is Accountable for requirement 1 below:
1. Meet the Process Safety Basic Requirements that are specified in Table 1.
1.1 Derogation of the application of Process Safety Basic Requirements
requires approval by the Royal Dutch Shell Chief Executive Officer.
1.2 Derogation of the application of Process Safety Basic Requirements for
Assets owned or operated by a Joint Venture in which Shell does not have a
controlling interest, and where the Joint Venture partners have adopted this
manual, requires approval by those Joint Venture partners.
2
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Explanation to Table 1
Purpose
To manage the Risk of harm to people that are occupying portable buildings.
Onshore Assets that have process Hazards with RAM red Risks and yellow 5B Risks.
Requirements
2. Their location shall be assessed and approved in accordance with DEP 34.17.10.33-Gen.
“Portable blast resistant modules”.
3. Their design shall be in accordance with DEP 34.17.10.33-Gen. “Portable blast resistant
modules”.
4. All other portable buildings shall be located in accordance with draft DEP 34.17.10.35-
Gen. (under development and based on DSM 2500005-1 August 2005 Siting of Occupied
Portable Buildings and will be written in the form of amendments and supplements to the
new API RP 753:2007 Management of Hazards Associated with Location of Process Plant
Portable Buildings).
BP Texas City Isomerisation Unit Explosion, Texas, USA, March 23, 2005
3
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
Offshore pipelines or production installations that have process Hazards with RAM red Risks
and yellow 5B Risks.
Requirements
1. For offshore pipelines containing flammable or toxic fluids an ESD valve shall be located
at the top of each riser connected to a manned offshore installation. The ESD valve shall
be located in a position:
o subject to the above, such that the distance from the ESD valve to the base of the
riser is as short as reasonably practicable.
2. For pipelines containing flammable or toxic fluids and connected to a manned offshore
installation, an additional subsea isolation valve (SSIV) located on the seabed close to the
installation shall be installed if required by the installation’s HSSE Case. The distance of the
SSIV from the installation should be such that the combined Risk associated with the
installation activities and the pipeline fluid inventory between the SSIV and the installation is
ALARP.
3. Flammable and toxic fluids are Category B, D, and E fluids as defined in ISO 13623:2000
Petroleum and natural gas industries – Pipeline transportation systems.
4
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
Offshore installations that have process Hazards with RAM red Risks and yellow 5B Risks.
Requirements
2. The main function of the TR is to provide a place where the total personnel on board
(POB) can muster without undue Risk and still have access to the communications,
monitoring and control equipment necessary to ensure their personal safety, and from
where, if necessary, safe and complete evacuation can be effected.
3. The escape and evacuation routes and the embarkation areas provide:
5
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
To control hazardous work and work that could interfere with other hazardous operations,
using a written procedure that establishes and communicates the controls necessary for safe
working.
Hazardous work that does not have established control measures; and
Work that could adversely affect the control of HSSE Risk in other hazardous operations
occurring at the same time or that could itself be adversely affected by those operations.
Requirements
1. Meet the requirements for the Permit To Work systems specified in Permit to Work.
2. Verify the effectiveness of the Permit To Work system of the Asset using a tiered
approach ranging from daily monitoring to less frequent self-assessments.
3. Make the effectiveness of the Permit To Work system and the Permit To Work verification
process part of each Independent HSSE MS audit.
6
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
Applies to:
Procedural Changes;
Organisational Changes.
Requirements
2. Verify the effectiveness of the Management Of Change system of the Asset using a tiered
approach ranging from daily monitoring to less frequent self-assessments.
3. Make the effectiveness of the Management Of Change system and the Management Of
change verification process part of each independent HSSE MS audit.
7
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
To manage the Risk of harm to people due to release and ignition of flammable
hydrocarbons.
Assets that have process Hazards with RAM red Risks and yellow 5B Risks and that are used
for producing, processing, transporting or storing hydrocarbon liquid above its flash point.
Requirements
1. Create for each Asset an inventory of all atmospheric vents that have the potential to
release hydrocarbon liquid above its flash point.
2. Assess the Risk of each of these vents and define the Risk mitigation in accordance with
Managing Risk.
BP Texas City Isomerisation Unit Explosion, Texas, USA, March 23, 2005
8
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
To manage the Risk of harm to people due to release and ignition of flammable
hydrocarbons.
Assets that have process Hazards with RAM red Risks and yellow 5B Risks and that are used
for producing, processing, transporting or storing fluids that have the potential to form a
vapour cloud.
Requirements
1. Create for each Asset an inventory of all storage tanks containing fluids that have the
potential to overfill resulting in a vapour cloud explosion. Examples of such fluids are
finished gasoline, gasoline components, naphtha(s), benzene, methyl ethyl ketone,
MTBE, acetone, pentane, special boiling point solvents SBP1 and SBP2, and natural gas
liquids (condensates) and crude oils with a Reid Vapour Pressure RVP > 2.5 psi.
2. Assess the Risk of each tank and define the Risk mitigation in accordance with Managing
Risk.
9
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
To manage the Risk of harm to people due to release and ignition of flammable
hydrocarbons.
Assets that have process Hazards with RAM red Risks and yellow 5B Risks and that are used
for producing, processing, transporting or storing liquefied gas (LPG, LNG) or compressed
flammable low molecular weight hydrocarbon gas.
Requirements
1. For each Asset, determine the lower design temperature (LDT) or alternatively the
minimum allowable temperature (MAT) for all unfired pressure vessels, heat exchangers,
piping, piping components and valves (including control valves) or rotating equipment,
containing liquefied gas or compressed flammable low molecular weight hydrocarbon
gas.
2. Take measures to prevent the equipment being at pressure below the LDT or
alternatively ensure the equipment metal temperature is not below the appropriate MAT
at any given operating pressure. Consider scenarios in which equipment temperature can
drop such as blow-downs, as well as scenarios of subsequent (re-)pressurization of
equipment.
3. The definitions of LDT and MAT as well as appropriate brittle fracture assessment
methods are described in DEP 30.10.02.31-Gen “Metallic materials - prevention of brittle
fracture”
10
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
To manage the Risk of harm to people and the environment due to lack of control in
abnormal operational situations.
Assets that have process Hazards with RAM red Risks and yellow 5B Ri sks and that are used
for exploring, drilling, producing, processing, transporting or storing Hazardous Substances
or energy.
Requirements
1. Each Asset shall have an alarm management system that provides the operator with an
adequate set of warnings against excursions beyond its safe operating limits both during
normal operation and during abnormal situations (startups, shutdowns and upsets),
whilst minimizing and where necessary suppressing, standing alarms, nuisance alarms,
repeating alarms and alarm floods.
Three Mile Island Nuclear Reactor Core Meltdown, Pennsylvania, March 28, 1979
11
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Purpose
To manage the Risk of harm to people and the environment by exposure to Sour Gas.
Requirements
2. Assess the safety Risks for Sour Gas operations, including non-routine
operations, Concurrent Operations and Confined Space entry.
4. Base Emergency incident scenarios on Sour Gas dispersion modelling and take into
account local regulations.
5. Include identification of evacuation sites and evacuation activities in the testing of the
Emergency Response Plans and Procedures.
Chuandongbei gas well blow-out, Gao Qiao, China, December 23, 2003
12
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.
Shell HSSE & SP Control Framework Mandatory
Process Safety Manual Restricted
Version 5, December 2009
Implementation Deadlines
Background
While process safety incidents are rare, we know about their potential to cause injury and
even death, as well as damage to the environment, our business and our reputation.
Avoiding a major process safety-related incident within our asset base is a priority and
requires a Group-wide approach.
The Group Asset Integrity-Process Safety Management Standards (AI-PSM) are part of the
new HSSE Control Framework and are applicable across all Businesses for ventures under
operational control. The HSSE Control Framework will give line management practical tools
to help with risk identification, drive the implementation of associated controls and provide
the means to assess the effectiveness of these controls.
The initial set of requirements will be created in consultation with the Businesses and the
HSSE function using learning from significant process safety incidents such as BP Texas City,
Longford and Piper Alpha. The PSBRs will include important elements of design and
construction and/or operation. In addition to their full application in the design of new
facilities, they will be required at all existing facilities within the shortest practical
timeframe.
The initial set of PSBRs will include a timeline for conducting gap analyses and developing
gap closure plans to address any discrepancies. This timeline will be defined by the
Businesses. The final date for developing gap closure plans for the initial set of requirements
is 31 December 2010.
After gap analyses are complete, the Business head must agree a suitable work plan and
timeline with the Royal Dutch Shell Chief Executive for implementing the PSBRs in that
Business.
If you have any queries regarding the Design and Engineering Standards, Process Safety
Basic Requirements or the HSSE Control Framework, please contact:
13
Defined terms can be found in the HSSE & SP Control Framework Glossary.
This document is not controlled when printed. See the Change Log for version control information.