The document outlines a process design training course covering 16 natural gas processing package and skid topics. Each topic will be covered over 1-4 days and include typical process diagrams, equipment lists, design guidelines, and safety considerations. The training aims to provide an overview of natural gas processing and design guidance for solid and liquid desiccant dehydration, separation, sweetening, mercury removal, nitrogen handling, NGL recovery and fractionation, tail gas treatment, chemical injection, flaring and other packages.

Uploaded by

rutuja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
264 views5 pages

Process Skid Training

The document outlines a process design training course covering 16 natural gas processing package and skid topics. Each topic will be covered over 1-4 days and include typical process diagrams, equipment lists, design guidelines, and safety considerations. The training aims to provide an overview of natural gas processing and design guidance for solid and liquid desiccant dehydration, separation, sweetening, mercury removal, nitrogen handling, NGL recovery and fractionation, tail gas treatment, chemical injection, flaring and other packages.

Uploaded by

rutuja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Date: 4th Oct 2014

SUBJECT: PROCESS DESIGN TRAINING COURSE ON NATURAL GAS PROCESSING PACKAGES/SKIDS

1) Overview of Natural Gas Processing (One Day)


 Production of Natural Gas
 Typical Composition of Raw Natural Gas
 Need for Processing (liquid removal, impurities removal ETC)
 Briefing of Various Processes Involved
 Typical Sales Gas Composition
 Other products with typical composition from gas processing plant

2) Natural Gas Solid Desiccant Dehydration Skid (2 to 2.5 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
 Advantages of Solid Desiccant Dehydration

3) Natural Gas Liquid Desiccant Dehydration Skid (3 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
 Advantages of Liquid Desiccant Dehydration

4) Gas/Liquid Separation Skids (2 to 2.5 days)


 Types of separation equipment
 Design Guidelines of Two Phase Separator (Gas/Liquid)
 Design Guidelines of Two Phase Separator (Liquid/Liquid)
5) Low Temperature Separator Skid (2 to 2.5 days)
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering

6) Amine Sweetening Process Skid (H2S & CO2 Removal) (2 to 2.5 days)
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

7) Mercury Removal Skid (1 to 1.5 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

8) Nitrogen Removal & Reinjection Skid (1 to 1.5 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

9) NGL Recovery Skid (1.5 to 2 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

10) NGL Fractionation Skid (3 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

11) Treatment Process for NGL Fractionation Products Skid (2 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
12) Fuel Gas/Natural Gas Conditioning Skid (2 to 2.5 days)
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

13) Sulfur Recovery Package (SRU) (4 days)


 Purpose of SRU
 Technologies Available
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

14) Tail Gas Treatment Package (TGTU) (1.5 to 2 days)


 Purpose of TGTU
 Technologies Available
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
15) Chemical Injection Skid (typically for one chemical injection) (1.5 to 2 days)
 Purpose of Chemical Injection
 Types of Chemical Injection
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

16) Flare Package Skid (2 to 2.5 days)


 Purpose of Flaring
 Types of Flares
 Typical PFD/PID
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification