Continuity Testing
Continuity Testing
CIVIL WORKS
QC-CW-001A CONCRETE POURING REQUEST FOR BEAMS AND SLABS
QC-CW-002A CHB LAYING WORKS
QC-CW-003A PLASTERING WORKS
QC-CW-004A PIPE CHASE CLOSURE
QC-CW-005 WATERPROOFING (T&B, ROOFDECK, PLANTBOXES)
QC-CW-006 CONCRETE POURING REQUEST FOR FOUNDATION, FOOTING TIE BEAM AN
QC-CW-007 CONCRETE POURING REQUEST FOR SLAB ON FILL / GRADE
QC-CW-008 CONCRETE POURING REQUEST FOR ROAD PAVEMENT / WALKWAYS / SIDEW
QC-CW-009 CONCRETE POURING REQUEST FOR WALLS / COLUMNS
QC-CW-EWT ELEVATED WATER TANK CHECKLIST
FINISHING WORKS
QC-FW-001 DRYWALL CLOSURE
QC-FW-002B SUSPENDED CEILING / CLADDING CLOSURE
QC-FW-003 TOILET AND BATH TILE INSTALLATION
QC-FW-004 FLOOR FINISHES INSTALLATION
QC-FW-005A INTERIOR PAINTING APPLICATION (SKIM COAT)
QC-FW-006A INTERIOR PAINTING APPLICATION (INTERMEDIATE PAINT)
QC-FW-007A EXTERIOR PAINTING
QC-FW-008 KITCHEN CABINET INSTALLATION
QC-FW-009 GRANITE COUNTER INSTALLATION
QC-FW-010 ALUMINUM DOORS & WINDOWS INSTALLATION
MEPF WORKS
QC-MEPF-001B ELECTRICAL CHECKLIST (PRE-CONCRETING)
QC-MEPF-002B PLUMBING/SANITARY CHECKLIST (PRE-CONCRETING)
QC-MEPF-003A FIRE PROTECTION WORKS CHECKLIST (PRE-CONCRETING)
QC-MEPF-004B ELECTRICAL CHECKLISTS (PRE-MASONRY)
QC-MEPF-005A PLUMBING/SANITARY CHECKLIST (PRE-MASONRY)
QC-MEPF-006 CONTINUITY TEST OF WIRES (PRIOR TO TOG/PMO ACCEPTANCE)
QC-MEPF-006A-DU CONTINUITY TEST OF WIRES (PRIOR TO TOG/UNIT OWNER ACCEPTANCE)
QC-MEPF-007A INSULATION RESISTANCE TEST OF WIRES AND BUSBAR (PRIOR TO TOG/PM
QC-MEPF-007A-DU INSULATION RESISTANCE TEST OF WIRES AND BUSBAR (PRIOR TO TOG/UN
QC-MEPF-008 LIVE TEST OF ALL CIRCUITS (PRIOR TO TOG/PMO ACCEPTANCE)
QC-MEPF-008A-DU LIVE TEST OF ALL CIRCUITS (PRIOR TO TOG/UNIT OWNER ACCEPTANCE)
QC-MEPF-009 TORQUE TEST OF PANELBOARD (PRIOR TO TOG/PMO ACCEPTANCE)
E BEAM AND PILE CAP
AYS / SIDEWALKS
EPTANCE)
TO TOG/PMO ACCEPTANCE)
TO TOG/UNIT OWNER ACCEPTANCE)
EPTANCE)
NCE)
ANNEX "A"
DMCI PROJECT DEVELOPERS, INC.
ACCOMPLISHED WORK CHECKLIST
Reference No. :
Period Covered :
Project Name :
CHECKLIST
REFERENCE NO. DATE DESCRIPTION LOCATION
FORM NO.
QC-CW-001 001 31-Jan-12 SUSPENDED SLAB LVL 5 G.L. A-C/1-3
002 1-Feb-12 COLUMNS (L5-L6) G.L. A/1, B/1
003 2-Feb-12 SUSPENDED SLAB LVL 5 G.L. C-D/3-5
QC-CW-002 060 30-Jan-12 CHB LAYING LVL 2, UNIT 201
061 31-Jan-12 CHB LAYING LVL 2, UNIT 202
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI -MEPF T&C
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI -MEPF T&C
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - Area MEPF
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
QC-MEPF-007
INSULATION RESISTANCE TEST OF WIRES & BUS
( PRIOR TO TOG/PMO ACCEPTANCE )
Project : Ref. No. :
Building : Subcontractor :
Unit/Level: Date of Reques :
Location : Time of Reques :
Panel Nam: Test Instrumen :
Applied Test Voltage : Date of Calibra :
Serial No. / Model : Date of Expirat :
Circu
Description of Wire Size andInitial Reading (MΩ)
it AT AF Pole Volts Specification Remarks
Loads Description L1-L2 L1-G L2-G
No.
Not lower
than
1.0 MΩ
under test
voltage
D.C. above
500V up to
1000V
( ANSI/ATS
2009,
Article
7.3.2.2.2 )
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - Area MEPF
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
INSULATION RESISTANCE TEST OF WIRES & BUSBAR QC-MEPF-007A-DU
( PRIOR TO TOG/UNIT OWNER ACCEPTANCE )
Project : Ref. No. :
Building : Subcontractor :
Unit/Level: Date of Request :
Location : Time of Request :
Panel Nam: Test Instrument :
Applied Test Voltage : Date of Calibratio :
Serial No. / Model : Date of Expiration :
Not lower
than
25.0 MΩ
under test
voltage
D.C. above
500V up
to 1000V
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI -MEPF & T&C
Not lower
than
1.0 MΩ
under test
voltage
D.C. above
500V up to
1000V
( ANSI/ATS
2009,
Article
7.3.2.2.2 )
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI -MEPF & T&C
Circu
Description of Wire Size andInitial Reading (MΩ)
it AT AF Pole Volts Specification Remarks
Loads Description L1-L2 L1-G L2-G
No.
Not lower
than
25 MΩ
under test
voltage
D.C. above
500V up to
1000V
NETA
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - Area MEPF
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
LIVE TEST OF ALL CIRCUITS QC-MEPF-008A-DU
( PRIOR TO TOG/UNIT OWNER ACCEPTANCE )
Project : Ref. No. :
Building : Subcontractor :
Unit/Level: Date of Request :
Location : Time of Request :
Panel Nam: Test Instrument :
Applied Test Voltage : Date of Calibrat :
Serial No. / Model : Date of Expirati :
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - MEPF T&C
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - MEPF T&C
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - Area MEPF
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
TORQUE TEST OF PANELBOARD QC-MEPF-009A-DU
( PRIOR TO TOG/UNIT OWNER ACCEPTANCE )
Project : Ref. No. :
Building : Subcontractor :
Unit/Level : Date of Request :
Location : Time of Request :
Panel Name: Test Instrument :
Applied Test Voltage : Date of Calibrat :
Serial No. / Model : Date of Expirat :
Circu
Bare Unit Acceptance Dressed Unit Acceptance
it Thread Size Specification Initial Test Result (N-m) Remarks Final Test Result (N-m) Remarks
No.
L1 L2 L3 L1 L2 L3
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - MEPF T&C
Conducted by: Witnessed and Attested by: Witnessed and Attested by: Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - MEPF T&C
Conducted by: Witnessed and Attested by: Witnessed and Attested by:Noted by:
Subcon Representative Subcon QC Engineer DMCI - MEPF Coordinator DMCI - Area MEPF
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
FLUSHING AND DECLOGGING TEST QC-MEPF-010
( PRIOR TO TOG/PMO ACCEPTANCE )
Project : Ref. No. :
Building : Subcontractor :
Unit/Level: Date of Request :
Location : Time of Request :
II. SYSTEM
Conducted by: Checked by: Witnessed and Attested by: Noted by:
Subcon Representative DMCI - MEPF Coordinator Subcon QC Engineer DMCI - Area MEPF
DMCI - MEPF QC
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
FLUSHING AND DECLOGGING TEST QC-MEPF-010A
( PRIOR TO TOG/PMO ACCEPTANCE )
Project : Ref. No. :
Building : Subcontracto :
Unit/Level : Date of Reque:
Location : Time of Reque:
II. SYSTEM
Conducted by: Checked by: Witnessed and Attested by: Noted by:
Subcon Representative DMCI - MEPF Coordinator Subcon QC Engineer DMCI - Area MEPF
DMCI - MEPF QC
II. SYSTEM
Gravity
Hydropneumatic
Others (Pls. Specify) _______________
VII. READING
Initial Reading: ______________________________ Time: ___________________
Final Reading: _______________________________ Time: ___________________
Conducted by: Checked by: Witnessed and Attested by: Noted by:
MATT MATEO
DMCI - MEPF QC
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
EXPOSED MEPF UTILITIES QC-MEPF-012
Project : Ref. No.
Building : Date of Request
Unit/Level : Time of Request
Location :
Subcontracto:
D. Installation
D.1. Civil Works Date Finished
1. Intermediate Painted
2. Louver Door with Master Key
Deadbolt Lockset
3. Concreting of Busduct Zocallo
3. Telephone
a. Wooden Backboard n/a if FOC
b. Correct # of pairs of Terminal n/a if FOC
4. Lighting Fixture
5. CO & Switches
6. Heat Detector
7. FDAS
a. Control / Repeater Panel
b. Power Booster / Transformer
D.7 termination
1. Meter Center
a. From Unit (Line Side) to Meter Center's CB (Load Side)
b. From Meter Center's CB (Line Side) to Meter Base (Load Side)
c. From Meter Base (Line Side) to Busbar
d. Grounding Interconnection
e. Correct Tagging
f. Excess Cable Tie Cutting
E. As-built Drawing
Approved by:
QC Engineer-Electrical Subcon Project In-charge
MEPF QC
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
PLUMBING AND SANITARY SYSTEM QC-MEPF-015A-DU
(PRIOR TO TOG/QMD/UNIT OWNER ACCEPTANCE)
Project : Ref. No. :
Building : Time of Request :
Unit/Level : Date of Request :
Location :
Subcontracto:
YES NO N/A
A. Approved Construction Plans Date Issued
1 One-line Diagram
2 Electrical Load Schedule
3 Busduct Layout
4 Power Layout
5 Lighting Layout
6 FDAS Layout
7 CATV Layout
8 Telephone Layout
9 CCTV Layout
B. Approved Shopdrawings Date Approved
Electrical Room (Boxes and Cabinets
1
Orientations incl. Conduit Layouts)
2 Busduct Block-out
3 Meter Center
4 Admin Panels
C. Approved Materials Brands / Supplier
1 IMC Conduits
2 IMC Fittings
3 Pullboxes and Gutters
4 Building Wires
5 Telephone Cable
6 CATV Cable
7 FDAS Wires
8 Lighting Fixtures
9 Wiring Devices
10 Heat Detectors
11 KW-HR Meter
D. Installation
D.1 Civil Works Date Turned-Over
1 Intermediate Painted
Louver Door with Master Key
2
Deadbolt Lockset
3 Concreting of Busduct Zocallo
4 Turn-over of EE-room for EE works
(from DMCI to Elect'l Subcon)
+3 Working Days upon
D.2 Roughing-in Works turned-over of items
under D.1
1 Admin Panel Enclosure
a Correct Mounting
b No Excess Holes
c Posting of Admin Panels Load Sched
2 Pull boxes, Splice Boxes and Cabinets
a Correct Dimension
b Correct Location and Mounting
c Correct Door Opening
d No Excess Holes
3 CB & BB Gutters
a Correct Sizes
b Correct Mounting
c No Excess Holes
d Posting of Meter Center Load Schedule
4 Conduiting
a Correct Sizes
Page 45 of 107
b Correct Fittings
c Sufficient Support
d Pull Wires
5 KW-HR Meter
a Meter Base
b Nipple
6 Turn-over of Block-outs for Concre Date Turned-over
(From Elect'l subcon to DMCI)
D.3 Civil Works Date Finished
Unit's Main Door with Lockset
1
and Windows
Concrete Restoration of Conduit
2
Block-outs
3 Painting of Restored Block-outs
Page 46 of 107
+2 Working Days upon
D.7 Termination and Completion
turn-over of item D.3.1
1 Meter Center
a From Unit (Line Side) to Meter Center's CB (Load Side)
b From Meter Center's CB (Line Side) to Meter Base (Load Side)
c From Meter Base (Line Side) to Busbar
d Grounding Interconnection
e Correct Tagging
f Excess Cable Tie Cutting
2 Admin Panels (if floors covered are ready)
a Feeder
b Branch Circuits
c Excess Cable Tie Cutting
3 Telephone
a From Unit to Terminal Block
b Correct Tagging
E. As-built Drawings
Page 47 of 107
OJECT DEVELOPERS, INC. FORM NO.:
QC-MEPF-15-EE
TRICAL ROOM CHECKLIST
PECTION OF BARE UNITS BY TOG)
REMARKS
Page 48 of 107
REMARKS
Page 49 of 107
Noted by:
Area MEPF
Project In-charge
Page 50 of 107
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
CONCRETE POURING REQUEST QC-CW-001A
FOR BEAMS AND SLABS
Project : SHERIDAN TOWERS Ref. No. :
Building : SOUTH TOWER Date of Reques: January 7, 2015
Level : FOURTH FLOOR Time of Reques: 8:00AM
Location : SEE ATTACHMENT
Strength (psi: 6000PSI
POST-MASONRY CHECKLISTS
17. Correct alignment of shower valve
18. Correct alignment & squareness of utility boxes
19. Correct alignment & squareness of Panelboard
20. Correct alignment of stub-outs for Plumbing / Sanitary (tolerance: not greater than 5mm)
stub-outs (Kitchen, Washing Machine Drain,
and ACU/FCU Drain, Water heater stub-out)
21. Electrical pipes free from clog
22. Fire Protection Piping penetration
(not embedded & free from laitances)
23. Ventillation Pipe / Duct penetration
(not embedded & free from laitances)
arks
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
CONCRETE POURING REQUEST QC-CW-008
FOR ROAD PAVEMENT / WALKWAYS / SIDEWALKS
Project : Ref. No. :
Building : Date of Reques:
Structure : Time of Reques:
Location :
Strength (psi:
Electrical QC Engineer
marks
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
CONCRETE POURING REQUEST QC-CW-009
FOR WALLS / COLUMNS
Project : SHERIDAN TOWERS Ref. No. :
Building : SOUTH TOWER Date of Reques: January 6, 2015
Structure : RETAINING WALL Time of Reques: 4:00PM
Location : GROUND FLOOR(SEE ATTACHMENT)
Strength (psi: 5000PSI
YES NO N/A Remarks
A. Rebar Works Date Issued at Site
1. Approved "For Construction" Plan
2. Approved Rebar Cutting Lists
3. Representative samples passed the required tests
4. Free from scaling, laitances and other impurities
5. Concrete spacer minimum concrete cover
a. If above ground : 38mm
b. If below ground and formed : 50mm
c. If cast against Earth : 75mm
d. For Columns
Longer
Side
1.0
(LS)
meter
1.0 1.0 meter
meter
1.0 meter
Shorte
r Side SS (maximum 0.4m) : 2 pcs at every 1.0m height
(SS) LS (0.4m to 1.0m) : minimum of 3 pcs every 1.0m height
LS (greater than 1.0m) : minimum of 4 pcs every 1.0m height
e. For Walls : 1.20m on center both ways (Vertical / Horizontal)
6. Correct splice location / length and development length
7. Correct quantity and spacing
B. MEPF Works
8. Lightning Arrester
9. Electrical Conduit MEPF Signature
a. Annunciator
b. Local combination box
c. Remote monitoring and intercom
of elevator to lobby
d. Automatic operation of EWT
e. Switches and outlets
10. Sleeves for Reinforced Concrete (RC) wall
11. Perforated pipes with filter cloth and drain boards
for retaining wall
12. Embedments
a. Approved anchor bolts (Gondola brackets, elevator beam
separator, roof framing, and elevated water tank
b. Approved ladder rung
13. As builts provided
C. Formworks
14. Correct elevations / layout
15. Required dimension / thickness satisfied
16. Squareness, plumbness, levelness achieved
17. Adequate / appropriate shoring, braces and supports
18. Approved form oil applied
a. Wax based for steel form
b. Resin based for phenolic plywood
19. Cleanliness (free from saw dust, concrete laitances,
loose tie wire, debris and the like)
20. Aproved construction key
21. Approved water stop installed
Observations and Comments:
FirePro/Plumbing/Sanitary QC Engineer
NOTE: Signature Over Printed Name is Required
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
DRY WALL CLOSURE CHECKLIST QC-FW-001
POST-INSTALLATION CHECKLISTS
13. Correct Slope to Drain
14. Flood Test (only for cementitious waterproofing)
a. 24-hours floor test conducted
15. Checking of all pipes and declogging conducted
16. Flushing of all waterline stub-outs
17. Plumbness of Wall Tiles
18. Checked for "KAPAK" and chipped edges
19. Checked for squareness, levelness and alignments
POST-INSTALLATION CHECKLISTS
20. Correct Slope to Drain
21. Checking of all pipes and declogging conducted
22. Checked for "KAPAK" and chipped edges
23. Checked for squareness, levelness and alignments
24. Check for blind spots and continuity for wash-outs
PRE-INSTALLATION CHECKLISTS
A. Approved Submittal (By Aluminum Doors / WindowsDate Issued
Shop drawing (to Site)
Sample Board of Accessories (to DMCI H.O./Proj.Site)
Aluminum Doors / Windows Subcon DMCI - Wetworks Engineer DMCI - Project in Charge
]R
DIANNE SABADO
DMCI - MEPF Coordinator
Remarks
Remarks
Remarks
Date / Time
CHERRY LYN DATAYLO
DMCI - Project in Charge
DMCI PROJECT DEVELOPERS, INC. FORM NO.:
ELEVATED WATER TANK CHECKLIST QC-CW-EWT
Verified and Inspected by: Verified and Inspected by: Approved by:
Remarks
Remarks
Remarks
Date / Time