Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
87 views
Procedure - Critically Rating
Procedure - Critically Rating
Uploaded by
jabpun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Procedure - Critically Rating For Later
Download
Save
Save Procedure - Critically Rating For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
87 views
Procedure - Critically Rating
Procedure - Critically Rating
Uploaded by
jabpun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Procedure - Critically Rating For Later
Carousel Previous
Carousel Next
Save
Save Procedure - Critically Rating For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 7
Search
Fullscreen
F-NC-174 Cas om (Elephant) Development Project - GOSP frehnostaa| usrarogon “AGIP Contract No MFI Jb No. F-174/010-04 PROJECT MANAGEMENT PROCEDURE 520 02 21270 PROCEDURE NO. GS-MO-Q-PR-00-015-C1 CRITICALITY RATING CONTENTS 1.0 PURPOSE... 2.0 SCOPE. 7 3.0 DEFINITIONS AND ABBREVIATIONS... 4.0 RESPONSIBILITIES 5.0 PROCEDURE. 6.0 REFERENCE DOCUMENTS 7.0 DISTRIBUTION... RRONNHHHD ATTACHMENT AQ CRITICALITY RATING CRITERIA. se ATTACHMENT A02_ SAMPLE CRITICALITY CALCULATION SHEET ATTACHMENT A03_ SAMPLE PROCUREMENT QUALITY PROGRAMME. 1 Page AGF Ot ENT PROJECT ement Team _| Team J me OLY | Mee Fe ADASA. Signature Sele Dete: eM se iL COMPANY UMITED Page 1 of 4 ——————— 01 | 10.03.09 | F.kunstein |W. Stumpf “| Dr. Suckut! | For Implementation Rev| Date Prepared Chocked ‘Approved | Desaipton of Revision OPRECTCRITICALITY RATING Revision C1, dated 21.07.2003 ndubaranse Procedure No. GS-MO-Q-PR-00-015 Page 2 of 4 faa 1.0 2.0 3.0 34 32 40 PURPOSE, ‘The purpose of this procedure is to describe how Criticalty Ratings are calculated and assigned to equipment items/materials to be supplied for the LASMO Elephant Development Project - GOSP. The procedure also describes how Criticality Ratings determine the quality programmes to be applied during the procurement of such equipment. SCOPE This procedure relates to equipment items purchased for the LASMO Elephant Development Project- GOSP, DEFINITIONS AND ABBREVIATIONS DEFINITIONS Criticality The likelihood and severity of possible failures during the manufacture, transport, installation, commissioning or normal operation of a piece of equipment which is to be procured for the Project. These failures may relate to safety, function, cost, schedule impact or a combination of these factors. Criticalty Rating: Decision making process by a team of specialists to determine the effort to be expended in QA/QC activities based on assessing the criticality (q.v.) of the piece of equipment in ques- tion, QA Requirements (QAR): Is a listing of quality requirements linked to specific Criticality Ratings which the supplier or ‘sub-contractor must take into account when providing items within the scope of supply. ABBREVIATIONS. cR Criticality Rating PEM — - Project Engineering Manager PQM — = Project Quality Manager QAR — = Quality Assurance Requirements VDRL - Vendor Data Requirements List RESPONSIBILITIES The preparation, review and approval of the subject management procedure is described in Project Quality Management Pian GS-MO-Q-QA-00-001 section 7.0 ‘The PEM is responsible for the implementation and maintenance of and adherence to this procedure, GPROECTCRITICALITY RATING Revision C1, dated 21.07.2003 natn | Procedure No. GS-MO-Q-PR-00-015 Page 3 of 4 Lowe) rch 5.0 51 52 53 54 55 PROCEDURE CRITICALITY RATING TEAM The Criticality Rating Team consists of: ‘+ the Discipline Lead Engineer + the Process Engineer * the Project Engineering Manager (Taking the lead) * the Project Quality Manager. CRITICALITY RATING CRITERIA Table 1 in Attachment AO1 of this procedure details the six criteria to be considered by the Criticality Rating Team when determining CR for equipment items. Each criterion is ‘sub- divided into four levels of severity with an appropriate points allocation from one to four. Although it is intended that subject criteria remain standard for the duration of the project, it may be necessary for Engineering to revise the criteria for individual cases to suit particular project circumstances. CALCULATION OF CRITICALITY RATINGS When awarding CR points, the CR Team shall consider the equipment against the six critical- ity rating criteria Reliability is implicitly included with the design maturity and complexity criteria because they are strongly correlated, l.e. high reliability is achieved by proven designs of minimal complex- ity. The criticality of poor reliabilty is included in criteria E and F. When the appropriate level has been selected against each criterion, the assigned point val- es, (1, 2, 3 or 4) shall be entered in the applicable boxes of the CR Calculation Sheet (Form LGM-EF-07-0, Attachment A02). The summation of awarded points shall be converted into a criticality rating level using Table 2 In Attachment A0t. ‘The CR Calculation Sheet shall be signed and dated by the CR Team. CRITICALITY RATINGS, fan override in CR is deemed necessary, then the revised value is to be entered in the over- ride.column under Section B of the CR Calculation Sheet, together with the reason for change. For example, a high score under Criterion E (Personal Safety) may warrant an over- ride in CR, PROCUREMENT QUALITY PROGRAMMES. Procurement Quality Programmes have been developed for all CRs. It is intended that such Programmes be used as a guide when completing the QA Requirements document (QAR). See Attachment A03 “Procurement Quality Programme” (Form LGM-EF-07-0) and Project Procedure GS-MO-Q-PR-00-016 Requisition Preparation - Vendor. GPROECTCRITICALITY RATING Revision C1, dated 21.07.2003 ‘ndurbnnonen Procedure No. GS-MO-Q-PR-00-015 Page 4 of 4 cay rckitstan 56 87 60 7.0 The final QAR shall be produced by means of reprinting all applicable clause numbers identi- fled by the relevant Procurement Quality Programme. ‘The original CR Calculation Sheet shall be retained within the Project File and the PQM shall include the finalised QAR within the requisition, ensuring that the unique QAR number is in- serted on the document front sheet. For numbering of documents, refer to Section 5.6 of this procedure, To avoid any clashes of QA and/or QC requirements in the requisition package, the POM shall crosscheck the QAR with the related codes on the VDRL. ‘Any conflict must be resolved with the responsible lead engineer prior to release of the requi- sition package. The QAR, which is included as a separate document within the requisition package, shall be signed and dated by the originator prior to issue. NUMBERING OF CRITICALITY RATING CALCULATION SHEETS ‘The numbering of CR Calculation Sheets is the responsibility of the originating discipline en- gineer. ‘The number shall be the requisition number. NUMBERING OF PROCUREMENT QUALITY PROGRAMMES The numbering of the Procurement Quality Programme shall be the complete requisition number preceded the abbreviation “QAR™. REFERENCE DOCUMENTS Procedures: GS-MO-Q-QA-00-001 Project Quality Management Plan GS-MO-Q-PR-00-016 Requisition Preparation - Vendor Forms: LGM-EF-07-0 Criticality Rating Calculation Sheet LGM-EF-06-0 Procurement Quality Programme LGM-EF-05-0 Technical Requisition (Cover sheet) DISTRIBUTION Originals (signed paper copies) of the procedure will be kept at DCC in Geisenheim Availability to project members as follows: * Geisenheim : Electronic files under H:\Project\Lasmo_gosp\Quality.pqm\Procedures * Site Office: Issue of controlled copy documents to Site DCC. GPROIEGTProcedure No. GS-MO-Q-PR-00-015 Attachment A01, Page 1 of 1 F-NC-174 (Ga (Elephant) Development Project - GOSP FERROSTAAL| cm ue Y FI Job No Patraioto-o1 CRITICALITY RATING se Table 1 - Criticality Rating Criteria Points A DESIGN MATURITY: ‘+ Proven design used frequently Hl ‘© Modification to proven design... 2 + Extrapolation of proven design a ‘+ New, innovative... 4 B_ DESIGN COMPLEXITY: ‘© Design effort is minimal and simple 1 ‘© Design effort is significant and simple 2 © Design effort is significant with some complexity. 3 * Design effort is extensive andlor complex. sh © PRODUCT CHARACTERISTICS: * Innocuous. ia 4 * Low hazard/toxicityitemperature/pressure. 2 ‘+ Medium hazard/toxicity/temperature/pressure... “8 + High hazarditoxicitytemperaturelpressure..... my MANUFACTURING COMPLEXITY: + Few simple processes 1 * Many simple processes... 2 + Alleast one complex process. 3 + Large number of complex processes... 4 E PERSONNEL SAFETY: ‘+ Norisk to health and safety 7 1 + Low risk to health and safety of operators. 2 + Significant risk to health and safety of operators. 3 Considerable risk to operator and/or public... 4 F FINANCIAL CONSEQUENCE - FAILURE WOULD RESULT IN: ‘+ Negligible cost. , oe 4 ‘© Small total cost, both di ‘consequential... 2 ‘+ Moderate total cost, both direct and consequential 3 * Excessive total cost, both direct and consequential 4 Total Points | Gritcality Rating | Level of Critcaty 2010.24 H Highest Level of Critcalty 18019 u . - toto 18 tl = 6109 v Lowest Level of Griteality _ @PROTS-CL-ADT 21.07-2003, foprocatachmentProcedure No. GS-MO-Q-PR-00-015 Attachment A02, Page 1 of 1 F-NC-174 (Elephant) Development Project - GOSP eahhostan haste ‘Petraioi0-01 CRITICALITY RATING sree SAMPLE: CRITICALITY RATING CALCULATION SHEET @le |, it ‘t i ai HH EES iF S| i be lel [Pe i TBE If i A, i i | i Ha la i le a EI vie Use form LGM-Ef apRois.cr.acz 2.072003, Lomer-o7-0.0003Procedure No. GS-MO-Q-PR-00-015 Attachment A03, Page 1 of 4 F-NC-174 (Elephant) Development Project - GOSP (sos havent Tip Contact No: F-1741010-01 CRITICALITY RATING 82002 21270 ‘Sample: Procurement Quality Plan TURKMENNEFT / TURKMENISTAN Gas COMPRESSOR STATION KORPEDJE frckhostia “Tweennat ee ae PROCUREMENT QUALITY PROGRAMME ae Pant = Equipment ‘Requiston No. D0 Quarty's oF siGniricanT wPORTANCE Dt quatrry is oF MODERATE IMPORTANCE (DIV NORMAL COMMERCIAL QUALITY IS ACCEPTABLE Ths equpmet and rio eovared by bis purchase oder haa boon raed athe critcalyndcated above und maractoraoupply wl be subjected to re gusty rogram deated below es marked nine appleabe colunn tyou}miyv {sch soul be taken rt acsoun byte Vent) + |Paaras seers! vars Quy Stn Nay iavaveomctane | Pr-anar review of Vendors comporie GA Warval lay be waned Bared oa pe ? [css ator acerestedaptaier = = [3 |Fosceerdrevew of Vener pests Proje Guay Plan Oanval and POSE rsa aoc Ouay Pan [a | SubvendorGomiy an paso ln ecapanc by Purchane’s Spent Engcaae Design cats accarianos by Purchasers Sposa geet 5 [6 | Postewardyomnw oC epaion Pan 7 | Pretpecion mothe fe 2 als[sfs s [GC sono in arctan wh GS rapacon Pa Ge wape no poe winastod by Purchesar GO and Spat Engen [10 | Fost eward audio my be conducted by Puchavors Oh en Vendor Gnd SB VER fo) sfs{stsfstsfs]s s [i |r Senate hacka 7 72 | Fontona/paarmance tes wineeod by Pursans?s OG ard Speci ema | peer approves procedure [3 | Funcionl/pomance st Wapsiaie winsated by Purchase? GOT manctacre’s tot posse viv [inspection Release Crieat by Puchavers GS ra Aa 188 | Goring Aatoriyirdepandent Tad Pony desbn epporat Vondorcoat]_Purchauer Soa] (ek 7) 180 [Cerin Auorvindonedent Ti Party epecion suey Vendor Cost] Purchaser Gout] (kk 7) — eee ee — arin TSO RE Compressor Station Korpasie| 51002 10080 | | 4 | | tort OIRCTSEO arom prom POPSET areas Use form LGM-EF-06-0 QPRONS-Cr.A03 21.07.2008, LoM-EF 060-0308
You might also like
Procedure - Bid Evaluation - Technical
PDF
No ratings yet
Procedure - Bid Evaluation - Technical
8 pages
Procedure - Design Change PDF
PDF
No ratings yet
Procedure - Design Change PDF
5 pages
Procedure - Concrete Pouring & Curing
PDF
No ratings yet
Procedure - Concrete Pouring & Curing
12 pages
Procedure - Testing and Calibration For Process Instrument
PDF
0% (1)
Procedure - Testing and Calibration For Process Instrument
10 pages
Procedure - Tie-In To Existing Facilities
PDF
100% (2)
Procedure - Tie-In To Existing Facilities
8 pages
Procedure - Engineering Queries
PDF
No ratings yet
Procedure - Engineering Queries
6 pages
Engineering Work Flow Process
PDF
No ratings yet
Engineering Work Flow Process
1 page
Plumbnes Strake 3 TK-012 - (12 Koordinat)
PDF
No ratings yet
Plumbnes Strake 3 TK-012 - (12 Koordinat)
2 pages
Consumable Spec Rev 12
PDF
No ratings yet
Consumable Spec Rev 12
24 pages
ENV-SPV-DR-B-011 Dimensional Inspection Procedure-Rev - A
PDF
No ratings yet
ENV-SPV-DR-B-011 Dimensional Inspection Procedure-Rev - A
9 pages
Scope of Test and Inspection For Insulating Work
PDF
No ratings yet
Scope of Test and Inspection For Insulating Work
5 pages
Gas Power Plant
PDF
No ratings yet
Gas Power Plant
10 pages
QAP
PDF
No ratings yet
QAP
6 pages
EFCO Maschinenbau India Private Limited: Job Card - Isolation Valve
PDF
No ratings yet
EFCO Maschinenbau India Private Limited: Job Card - Isolation Valve
2 pages
Stack Fabrication: NIOEC-SP-20-04
PDF
100% (1)
Stack Fabrication: NIOEC-SP-20-04
8 pages
Approved ITP - RTN - VS215B-101-A-PLN-7001 - 05 - Code A
PDF
0% (1)
Approved ITP - RTN - VS215B-101-A-PLN-7001 - 05 - Code A
131 pages
Pages From g446 0828 2810 Itp 0100 0046 Rev 05 Final Approved 2
PDF
No ratings yet
Pages From g446 0828 2810 Itp 0100 0046 Rev 05 Final Approved 2
4 pages
CTR 001 WWT Rev 1 (Without Pump, Tank, and Pipe Spec) Rev.1
PDF
No ratings yet
CTR 001 WWT Rev 1 (Without Pump, Tank, and Pipe Spec) Rev.1
11 pages
CR Qap
PDF
No ratings yet
CR Qap
2 pages
Inspection and Test Plan
PDF
100% (1)
Inspection and Test Plan
6 pages
FSK-E290-006-A4-0 Quality Control Plan (QC Plan)
PDF
No ratings yet
FSK-E290-006-A4-0 Quality Control Plan (QC Plan)
4 pages
ITP
PDF
No ratings yet
ITP
1 page
Toc PL381
PDF
No ratings yet
Toc PL381
5 pages
5113-QAP-001 - QAP Skid Fabrication - Rev-B0
PDF
100% (1)
5113-QAP-001 - QAP Skid Fabrication - Rev-B0
4 pages
Jacobs: Equipment Inspection Code: A
PDF
No ratings yet
Jacobs: Equipment Inspection Code: A
2 pages
Dokumen - Tips - Project Packing and Preservation Procedure
PDF
No ratings yet
Dokumen - Tips - Project Packing and Preservation Procedure
27 pages
ATTACHMENT 1-TECHNICAL BID EVALUATION FOR VALVES ATTACHEMENT Camtech Rev 1
PDF
No ratings yet
ATTACHMENT 1-TECHNICAL BID EVALUATION FOR VALVES ATTACHEMENT Camtech Rev 1
4 pages
Itp For Storage Tank PDF
PDF
No ratings yet
Itp For Storage Tank PDF
6 pages
PQ 2015-Korea Urethane PDF
PDF
No ratings yet
PQ 2015-Korea Urethane PDF
135 pages
FQP For Chimney 3 Mechanical
PDF
No ratings yet
FQP For Chimney 3 Mechanical
4 pages
Foam Tank Installation Inspection Report
PDF
No ratings yet
Foam Tank Installation Inspection Report
13 pages
Inspection & Test Plans
PDF
No ratings yet
Inspection & Test Plans
3 pages
What Is "Static Head" in ASME Section VIII Vessels?
PDF
No ratings yet
What Is "Static Head" in ASME Section VIII Vessels?
2 pages
Inspection and Test Plan (ITP) (Pressure Vessel)
PDF
No ratings yet
Inspection and Test Plan (ITP) (Pressure Vessel)
1 page
CC ITP Sample PDF
PDF
No ratings yet
CC ITP Sample PDF
4 pages
Procedural Manual Pipeline
PDF
No ratings yet
Procedural Manual Pipeline
20 pages
Responsibility Matrix
PDF
No ratings yet
Responsibility Matrix
1 page
189-11!23!2022-1-Static and Rotating Equipment Installation
PDF
No ratings yet
189-11!23!2022-1-Static and Rotating Equipment Installation
11 pages
Field ITP for Installation Overhead Crane Turbine Building_Rev 0 (AWC)
PDF
No ratings yet
Field ITP for Installation Overhead Crane Turbine Building_Rev 0 (AWC)
28 pages
Alpha-Ecc - Southern Petroleum Construction Company: Seq. VDRL Code Note
PDF
No ratings yet
Alpha-Ecc - Southern Petroleum Construction Company: Seq. VDRL Code Note
11 pages
Harouge Oil Operations: Project Quality Plan
PDF
No ratings yet
Harouge Oil Operations: Project Quality Plan
19 pages
NPK 000 Q0 in 6001 K Nonconformance Inspection Procedure Rev 3 For
PDF
No ratings yet
NPK 000 Q0 in 6001 K Nonconformance Inspection Procedure Rev 3 For
11 pages
17-05 Dimensional Control
PDF
No ratings yet
17-05 Dimensional Control
1 page
Itp Jib Crane Rev.1
PDF
No ratings yet
Itp Jib Crane Rev.1
1 page
UIG Specifications For AWWA D103 Glass Fused To Steel Storage Tanks 08.05.14
PDF
No ratings yet
UIG Specifications For AWWA D103 Glass Fused To Steel Storage Tanks 08.05.14
13 pages
Procedure For Static Equipments Erection.
PDF
No ratings yet
Procedure For Static Equipments Erection.
6 pages
Inspection and Test Plan: Fabrication / In-Process Inspection
PDF
100% (1)
Inspection and Test Plan: Fabrication / In-Process Inspection
17 pages
Pre-Mobilization Inspection Checklisit-Generator Set
PDF
No ratings yet
Pre-Mobilization Inspection Checklisit-Generator Set
2 pages
EC-SRC-0003 Non-Destructive Test (NDT) and Non-Destructive Evaluation (NDE) Requirements Rev 3.0
PDF
No ratings yet
EC-SRC-0003 Non-Destructive Test (NDT) and Non-Destructive Evaluation (NDE) Requirements Rev 3.0
21 pages
Inspection and Test Plan (ITP) For Spherical Storage Tanks: Dehloran Olefin Plant
PDF
100% (1)
Inspection and Test Plan (ITP) For Spherical Storage Tanks: Dehloran Olefin Plant
9 pages
Oil Storage Facilities
PDF
No ratings yet
Oil Storage Facilities
2 pages
Pressure Vessel Dimension Inspection
PDF
No ratings yet
Pressure Vessel Dimension Inspection
17 pages
CP-190 Rev 2.0 Quality Management System For Project Delivery (Aug-14)
PDF
100% (1)
CP-190 Rev 2.0 Quality Management System For Project Delivery (Aug-14)
40 pages
Design Basis - ATF Storage Nepal
PDF
No ratings yet
Design Basis - ATF Storage Nepal
12 pages
Inspection & Test Plan: Doc N°: Irps Qc-001-01/28-02-20
PDF
No ratings yet
Inspection & Test Plan: Doc N°: Irps Qc-001-01/28-02-20
8 pages
Badak Central Plant Exhibit 4 - Vendor Data Register List (VDRL)
PDF
No ratings yet
Badak Central Plant Exhibit 4 - Vendor Data Register List (VDRL)
12 pages
A05-004 - Inspection Test Plan - Shell & Tube Heat Exchangers - 5-210D-HA-01 A B C D
PDF
100% (4)
A05-004 - Inspection Test Plan - Shell & Tube Heat Exchangers - 5-210D-HA-01 A B C D
14 pages
Annexure 6 - Storage and Preservation Procedure
PDF
No ratings yet
Annexure 6 - Storage and Preservation Procedure
9 pages
G446-0828-2810-QA-0100-0050 PMI Procedure
PDF
100% (1)
G446-0828-2810-QA-0100-0050 PMI Procedure
9 pages
1622-DES-CR-01 - Gas Cylinder Basket Design Report - R0
PDF
100% (2)
1622-DES-CR-01 - Gas Cylinder Basket Design Report - R0
25 pages
VD2103-FIT-ME-QCP-K00-0007-01 - Metallic Tank QCP
PDF
100% (1)
VD2103-FIT-ME-QCP-K00-0007-01 - Metallic Tank QCP
3 pages
ITP FOR PILING WORK
PDF
No ratings yet
ITP FOR PILING WORK
14 pages
9200 9P 005 - R2
PDF
100% (1)
9200 9P 005 - R2
23 pages
000.200.0077 Criticality Rating System
PDF
100% (1)
000.200.0077 Criticality Rating System
8 pages
03.01.03-Specification For Criticality Rating of Materials and Equipment-Specification
PDF
No ratings yet
03.01.03-Specification For Criticality Rating of Materials and Equipment-Specification
23 pages
Commissioning-General Check For Pumps
PDF
No ratings yet
Commissioning-General Check For Pumps
3 pages
Procedure - Expediting
PDF
No ratings yet
Procedure - Expediting
10 pages
Procedure - Concrete Mix Design
PDF
No ratings yet
Procedure - Concrete Mix Design
23 pages
Procedure - AsBuilt Documentation
PDF
No ratings yet
Procedure - AsBuilt Documentation
4 pages
Procedure - Contract Variation Order
PDF
No ratings yet
Procedure - Contract Variation Order
8 pages
Procedure - CO2 Fire Fighting System
PDF
No ratings yet
Procedure - CO2 Fire Fighting System
1 page