Inspection Checklist

This document is a request for inspection form submitted to Sarawak Energy Berhad for the Sibiyu 132/33 kV Substation Project. It lists inspection items for sewerage works including material, setting out, excavation, pipe handling, jointing, backfilling and compaction. Upon inspection, the response will indicate if works pass and can proceed, if remedial work is required without reinspection, or if remedial work and reinspection are necessary. The form must be signed by the site supervisor, clerk of works, and client representative.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
596 views

Inspection Checklist

This document is a request for inspection form submitted to Sarawak Energy Berhad for the Sibiyu 132/33 kV Substation Project. It lists inspection items for sewerage works including material, setting out, excavation, pipe handling, jointing, backfilling and compaction. Upon inspection, the response will indicate if works pass and can proceed, if remedial work is required without reinspection, or if remedial work and reinspection are necessary. The form must be signed by the site supervisor, clerk of works, and client representative.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PESTECH SDN BHD Form No.

: P15-1N
Rev. No. : 0

Project : Sibiyu 132/33 kV Substation Project Contract No. : PLS 150129


Client : Sarawak Energy Berhad Date :
REQUEST FOR INSPECTION FORM
To : Sarawak Energy Berhad
Requested by : Received by :
Date/Time : Date/Time :

The following works are/ will be ready for inspection at ______________________ (time) on _____________________ (date)

INSPECTION CHECKLIST - SEWERAGE


Zone : Structure :
Gridline : Element Level :
A Inspection Items
Acceptability
Item No. Description Remarks & Rectification
Yes No
1 Material
2 Setting out
3 Excavation and leveling
4 Shoring/Slope
5 Pipe handling/Laying/Cutting
6 Pipe joint
7 Backfilling and compacting

B Inspection Response
Inspection passed, works are allowed to proceed.
Remedial work listed to be carried out. No further inspection required.
Remedial work listed to be carried out. Re-inspection required.
C Remedial Action

Inspected By : Review/Surveillance By : Witness By:

Site Supervisor / Site Engineer Clerk of Work (C.O.W) / QAQC Engineer Client Representative

Name: Name: Name:


Date: Date: Date:

Effective Date: 1/12/2014