This document contains a register of method statements for the Al-Bustan II Infrastructure (CP400) Project in Riyadh, Saudi Arabia. It lists 17 infrastructure-related construction methods, including deep well drilling, earthworks, precast boundary wall installation, waterproofing, utility pipe laying, concrete pouring, grounding, cable testing and commissioning, and more. Each method statement is referenced with a number, description, responsible discipline, submittal date, review code, reply date, and remarks.

Uploaded by

elbarani
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
230 views

08.2 Method Statement

This document contains a register of method statements for the Al-Bustan II Infrastructure (CP400) Project in Riyadh, Saudi Arabia. It lists 17 infrastructure-related construction methods, including deep well drilling, earthworks, precast boundary wall installation, waterproofing, utility pipe laying, concrete pouring, grounding, cable testing and commissioning, and more. Each method statement is referenced with a number, description, responsible discipline, submittal date, review code, reply date, and remarks.

Uploaded by

elbarani
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Al-Bustan II Infrastructure (CP400) Project (S36)

Riyadh, KSA

METHOD STATEMENT REGISTER

DISCIPLINE
S/N DESCRIPTION J&P DATE ACTION REPLY REMARKS
ARCH'L.
STRUCT'L./
MECH'L.
ELECT'L
PLUMBING
Reference No. SUBMITTED CODE DATE
CIVIL .

INFRASTRUCTURE
Method Statement for Deep Well
X 23-Oct-11 B 02-Nov-11 Approved as Noted
Drilling
1
Method Statement & Technical JPR/R6/04/267
X 21-Dec-11 B 03-Jan-12 Approved as Noted
Specs for Drilling a Well (Rev. 1) dtd 21-Dec-11

JPR/R6/04/098
2 Method Statement for Earthworks X dtd 24-Oct-11 24-Oct-11 B 12-Nov-11 Approved as Noted

Method Statement for Precast Included on the Civil Material


3 Boundary Wall Production and X JPR/R6/04/028 26-Oct-11 B 30-Oct-11 Submittal C-003 (Precast
dtd 26-Oct-11 Boundary Wall)
Installation at Site

Method Statement for Precast


Boundary Wall Production and Risk Assessment
JPR/R6 - BW/293
4 Installation at Site/Risk X 31-Dec-11 C 11-Jan-11
dtd 31-Dec-11 (Resubmit)
Assessment/ CV of Safety Officer
(Rev. 1)

Method Statement for Included on the Civil Material


JPR/R6/04/040 Submittal C-004
5 Waterproofing System of X dtd 29-Oct-11 29-Oct-11 B 01-Nov-11 (Waterproofing System for UG
Underground Water Storage Tank Water Tank)

Method Statement for Jointing PVC JPR/R6/04/144 Comments on the Civil Material
6 Aquastop Waterstop X dtd 29-Nov-11 29-Nov-11 B 07-Dec-11 Submittal C-001 (Masterflex
Aquastop - ICJ 250)

Method Statement for Excavation,


7 Trenching, Backfill & Fill Materials & X JPR/R6/04/144 06-Dec-11 B 12-Dec-11 Approved as Noted
dtd 06-Dec-11
General Grading Works

8 Method Statement for Pre-Casting of X JPR/R6/04/284 29-Dec-11 B 05-Jan-12 Approved as Noted


Concrete Manholes dtd 29-Dec-11

Weekly Progress Report (Week 47) Page 1 of 3 455957717.xls


Al-Bustan II Infrastructure (CP400) Project (S36)
Riyadh, KSA

METHOD STATEMENT REGISTER

DISCIPLINE
S/N DESCRIPTION J&P DATE ACTION REPLY REMARKS
ARCH'L.
STRUCT'L./
MECH'L.
ELECT'L
PLUMBING
Reference No. SUBMITTED CODE DATE
CIVIL .

Method Statement for Laying UG


9 Utility Pipes (Sewer Line, Potable X JPR/R6/04/294 31-Dec-11 B 05-Jan-12 Approved as Noted
Water, Irrigation/Fire & Raw Water dtd 31-Dec-11
Line)

Method Statement for Underground


JPR/R6/04/425
10 Water Storage Tank (Pump Room) X dtd 23-Jan-12 23-Jan-12 B 25-Jan-12 Approved as Noted
Concrete Pouring
Method Statement for Underground
JPR/R6/04/480
11 Water Storage Tank (Irrigation/Fire X dtd 01-Feb-12
01-Feb-12 B 02-Feb-12 Approved as Noted
Tank) Concrete Pouring

Installation of Substations JPR/R6/04/516


12
Grounding X dtd 11-Feb-12
11-Feb-12 B 15-Feb-12 Approved as Noted

Testing & Commissioning of MV JPR/R6/04/522 Submitted for Review &


13
Cables X dtd 11-Feb-12
13-Feb-12
Approval

Installation of Substations , Feeder JPR/R6/04/523


14
Oillars and KWh Meter Enclosures X dtd13-Feb-12
13-Feb-12 B 20-Feb-12 Approved as Noted

Erection & Pouring of Concrete to JPR/R6/04/530


15
Water Tank (Retaining Walls) X dtd 14-Feb-12
14-Feb-12 B 23-Feb-12 Approved as Noted

Testing & Commissioning of LV JPR/R6/04/557


16 Cables X dtd 19-Feb-12 19-Feb-12 B 26-Feb-12 Approved as Noted

JPR/R6/04/568
17 MV Cable Termination and Joints X dtd 20-Feb-12 20-Feb-12 B 26-Feb-12 Approved as Noted

Testing & Commisioning of JPR/R6/04/569


18 Substation Grounding X dtd 20-Feb-12 20-Feb-12 B 26-Feb-12 Approved as Noted

Installation of MV & LV Cables in JPR/R6/04/820


19 Trench X dtd 02-Apr-12 02-Apr-12 B 18-Apr-12 Approved as Noted

Weekly Progress Report (Week 47) Page 2 of 3 455957717.xls


Al-Bustan II Infrastructure (CP400) Project (S36)
Riyadh, KSA

METHOD STATEMENT REGISTER

DISCIPLINE
S/N DESCRIPTION J&P DATE ACTION REPLY REMARKS
ARCH'L.
STRUCT'L./
MECH'L.
ELECT'L
PLUMBING
Reference No. SUBMITTED CODE DATE
CIVIL .

Underground Water Tank (Roof Slab JPR/R6/04/870


20
& Precast Slab Installation) X dtd 10- Apr-12
10-Apr-12 B 16-Apr-12 Approved as Noted

Underground Water Storage Tank


(Waterproofing) Internal Lining, JPR/R6/04/951
21
External Vertical Concrete Wall and X dtd 01-May-12
01-May-12 B 10-May-12 Approved as Noted
Top of Roof Slab Application

Installation of Precast Boundary JPR/R6/04/964


22 Wall - North Side X dtd 03-May-12 03-May-12 C 12-May-12 Reviewed and Resubmit

Installation of Precast Boundary JPR/R6/04/1019


23
Wall - North Side (Rev. 1) X dtd 19-May-12
19-May-12 B 03-Jun-12 Approved as Noted

Weekly Progress Report (Week 47) Page 3 of 3 455957717.xls