100% found this document useful (6 votes)
9K views

BSJ SK Team-Building 2019 Program of Works

The document outlines a program of works for a 2-day team-building workshop on meat processing for 200 youth participants from Barangay San Jose, Antipolo City. The workshop aims to improve teamwork, leadership, coordination and stress management among the Sangguniang Kabataan and Katipunan ng Kabataan youth organizations. A variety of indoor and outdoor activities are planned, along with objectives, schedule, legal basis and budget requirements totaling over PhP 200,000.

Uploaded by

Murphy Red
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (6 votes)
9K views

BSJ SK Team-Building 2019 Program of Works

The document outlines a program of works for a 2-day team-building workshop on meat processing for 200 youth participants from Barangay San Jose, Antipolo City. The workshop aims to improve teamwork, leadership, coordination and stress management among the Sangguniang Kabataan and Katipunan ng Kabataan youth organizations. A variety of indoor and outdoor activities are planned, along with objectives, schedule, legal basis and budget requirements totaling over PhP 200,000.

Uploaded by

Murphy Red
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Republika ng Pilipinas

LALAWIGAN NG RIZAL

PROGRAM OF WORKS
A. PROJECT TITLE:

BASIC TRAINING WORKSHOP ON MEAT PROCESSING

B. TARGET DATE AND VENUE:

DATE : ________________________________
VENUE : ________________________________
BRGY. SAN JOSE, ANTIPOLO CITY

C. TARGET PARTICIPANTS:

200 PARTICIPANTS FROM MEMBERS OF KATIPUNAN NG KABATAAN


(KK) FROM ALL SITIOS OF BARANGAY SAN JOSE, ANTIPOLO CITY.

D. PROPONENT:

THE SANGGUNIANG KABATAAN (SK) OF BARANGAY SAN JOSE


HEADED BY HON. SK CHAIRMAN MONTERO AZUR TOLENTINO,
THROUGH THE INITIATIVE OF SK KAGAWAD HON. ____________________,
CHAIRPERSON OF SK COMMITTEE ON ______________________________,
IN COORDINATION WITH THE KATIPUNAN NG KABATAAN (KK)
OFFICERS OF ALL SITIOS OF BARANGAY SAN JOSE AND THE
SANGGUNIANG BARANGAY.

E. RATIONALE:

Barangays being the smallest political units in local governance play significant
role in the delivery of social services, sustaining civic infrastructures and
organizations, and maintaining peace, order and safety to communities within
their areas of jurisdiction.

On the part of officials representing the youth of barangays and their respective
youth leaders in every community of each barangay discharge their respective
functions not simply as individuals. Team work is essential in terms of managing
and implementing executive, legislative and social functions and in doing so, it is
important to constantly sharpen teamwork among youth officials and their
sectoral constituents.

The team-building activities inclusive in this BARANGAY SAN JOSE SK AND KK TEAM-
BUILDING ACTIVITY program of works are designed to provide the salient
requirements in strengthening the Sangguniang Kabataan (SK) and the
Katipunan ng Kabataan (KK) as a dynamic political unit of Barangay San Jose
while allotting some time for relaxation and forging camaraderie among the
participants.
Program of Works for SK & KK Team-Building and Leadership Training 2019

F. WORKSHOP DESCRIPTION:

This teambuilding program, a 2-day STRUCTURED TEAM ENHANCEMENT and


LEADERSHIP WORKSHOP, consisting of combined indoor and outdoor activities will
be done in order to attain its set objectives. The team-building workshop is aimed
at reinforcing commitment to their public service direction of the SK and KK
leaders of Barangay San Jose and strengthening camaraderie among its present
organizational structure.

This is undertaken through the establishment of strong leadership model and


language shared by every individual in the SK and KK and the facilitation of
mobility for the whole youth administrative structure as one team, with the end in
view of providing enhanced convenience to internal and external clients to
whom services are directed.

On top of it all, the activities incorporated in this program is designed to enable


the participants in contributing their individual significance for the development
of youth programs, projects and activities in the barangay, all of it in an
atmosphere of activity and fun.

G. WORKSHOP OBJECTIVES

At the end of the 2-day event, the participants would have been able to:

 Identify pointers to improve working relationships, coordination, and


teamwork.
 Recognize actions that can diffuse stress toward more productive ends.
 Realize the importance of leadership and leading a team for utmost
output.
 Spend time to relax and have fun.

H. WORKSHOP FLOW OUTLINE


D A Y O N E
TIME ALLOTMENT MODULE OBJECTIVE HIGHLIGHTS METHODOLOGY
6:00 – 7:30AM Breakfast /Registration
WELCOME BRIEFING
BARANGAY SAN JOSE SK-KK
Opening Program TEAMBUILDING COMMITTEE
WELCOME REMARKS from
BARANGAY SAN JOSE
7:30 – 9:00AM SANGGUNIANG KABATAAN Plenary
Levelling-off of Participants and Presentation of
Workshop Objectives
Establishing of House Rules, Announcement of
Workshop Policies and Team Quarters Designations
9:00 – 9:30AM AM Snacks
9:30 – 11:00AM Activity that enhance
 Activity 1 (Outdoor) Team enrichment workshop.
working relationship
11:00AM – 12:00NN Billeting Check-in and Free Time Venue familiarization.
12:00NN – 1:00PM Lunch
1:00 – 3:30PM  Activity 2 (Indoor) Team innovation workshop.
Activity that enhance *PM snacks will be served
(Announcement of the
leadership and creativity during the activity
mechanics for Activity 3)
3:30 – 7:00PM Free Time & Dinner Preparation for Activity 3
7:00 – 9:00PM Activity that enhance
 Activity 3 (Outdoor) Team socialization workshop.
teamwork
9:00 – 10:00PM Socials

2
Program of Works for SK & KK Team-Building and Leadership Training 2019

D A Y T W O
TIME ALLOTMENT MODULE OBJECTIVE HIGHLIGHTS METHODOLOGY
6:00 – 7:00AM Morning Exercise Zumba
7:00AM – 8:00AM Freshening Up and Breakfast
8:00 – 9:00AM  Recap of Day 1 Plenary
9:00 – 9:30AM AM Snacks
9:30AM – 11:00AM Skills activity to promote
greater coordination and  Activity 4 (Outdoor) Team proficiency workshop.
synchronicity
11:00AM – 12:00NN Group Processing and Closing Activity Plenary
12:00 – 1:00PM Lunch
1:00 – 3:30PM Swimming and Socials
3:30 – 4:3oPM Packing up and boarding
4:30PM Home Sweet Home

I. LEGAL BASIS

The BARANGAY SAN JOSE SK AND KK TEAM-BUILDING ACTIVITY is pursuant to the provision
of the Local Government Code of the Philippines, in Title Three - Human Resources
And Development, Particularly Section 77 (Responsibility for Human Resources
and Development), which states that “every local government unit shall be
responsible for human resources and development in his unit and shall take all
personnel actions in accordance with the Constitutional provisions on civil service,
pertinent laws, and rules and regulations thereon…”

Likewise, it is in consonance with the strategic thrusts of the barangay as detailed


in the Development Administration of the BARANGAY Agenda for Governance
And Development (BARANGAY AGAD) as mandated by and submitted to the
Department of the Interior and Local Governments (DILG), particularly in the
Human Resources and Development section, which states: “Initiation of staff
development activities/conduct of trainings,” among which is Team-Building
Workshop for barangay officials and employees, aimed at upgrading of delivery
of social services through improved teamwork among barangay officials and
staff.

J. BUDGETARY REQUIREMENTS:

Budgetary requirements for the BARANGAY SAN JOSE SK AND KK TEAM-BUILDING ACTIVITY
includes expenses for the following:

A. Transportation:
@ PhP 200.00 head X 200 SK, KK and staff = PhP 40,000.00

B. Food and Accommodation:


@ PhP 350.00 head X 200 pax X 2 days = 140,000.00

C. Technical Requirements:

1. Workshop Materials:

a. Team banners:
8 color banners @ PhP 50.00 = PhP 400.00
b. Team color bands per team member:
8 colors X 22 each @ PhP 5.00 = 880.00
c. Inflatable rubber round floaters:
16 pcs. @ PhP 100.00 (rental) = 1,600.00
Program of Works for SK & KK Team-Building and Leadership Training 2019

d. 3 ft. whole bamboo poles:


20 pcs. @ PhP 5.00 = PhP 100.00
e. Straw strings: 10 rolls @ PhP 30.00 = 300.00
f. Empty sacks: 22 pcs. @ PhP 5.00 = 110.00
g. Large jigsaw puzzles
2 pcs. @ PhP 100.00 = 200.00
h. Whistles (w/ necklaces):
@ PhP 47.50 X 4 pcs. = 190.00 Php 3,780.00

2. Prizes for event winners:

a. Cash Prizes for Special Awards


5 Special Awards @ PhP 2,000.00 = Php 10,000.00
b. Cash Prize for Overall Champion Teams:
2nd Runner-Up - PhP 3,000.00
1st Runner-Up - 4,000.00
Champion Team - 5,000.00 12,000.00 22,000.00

D. Office Supplies (Workshop Kits):

1. Brown envelopes @ PhP 5.00 X 200 pcs. = PhP 1,000.00


2. Photocopy of workshop flow & policies,
house rules @ PhP 1.50 X 600 sheets = 900.00
3. Ball pens @ PhP 5.00 X 200 pcs. = 1,000.00
4. Bond papers @ PhP100.00 X 2 reams = 200.00
5. Masking tape @ PhP 32.50 X 16 rolls = 520.00
6. Score Sheets (5 sets @ 3 pcs.) = 30.00 3,650.00

E. Professional Fees (Team-Building Facilitators):

1. Program Design = PhP 3,000.00


2. Preparation, Conduct and Facilitation:
a. Training Facilitators: 3 pax
@ PhP 1,500.00 X 2 days = PhP 9,000.00
b. Training Documenter: 1 pax
@ PhP 1,000.00 X 2 days = 2,000.00 11,000.00
3. Post-Activity Evaluation Report = 1,500.00 15,800.00

TOTAL BUDGETARY REQUIREMENTS = PhP 225,230.00

K. BUDGET SOURCE:

Inclusive financial requirements for the activity shall be drawn from the General
Fund of the Sangguniang Kabataan, particularly from the Training Expenses as
detailed in the Maintenance and Other Operating Expenses (MOOE).

Prepared by: APPROVED:

ARMAN GERALD GO HON. MONTERO AZUR M. TOLENTINO


SK Secretary SK Chairman

You might also like