STI SP001 Standard (6th Edition, January 2018)
Inspection and evaluation criteria required to determine suitability for continued service.
Inspect to identify the condition of and changes to AST.
• ASTs storing flammable and combustible liquids at atmospheric pressure
• Can be applied to AST storing other liquids following proper evaluation
Applicability
• Shop-Built/Fabricated AST – Horizontal or Vertical, Single or
Double Walled
• Steel Diked AST – Open or Closed
• Concrete Exterior AST
• Field-Erected AST – Limited Size
• Portable Containers – Drums, Totes (IBCs) – Plastic, Steel, Stainless
4
STI SPOO1 Inspection Components
Primary tank – thickness determination
Secondary tank (if present)
Tank foundation, supports and anchors
Tank gauges and alarms
Overfill valves and alarms
Insulation covering
Tank appurtenances
Normal vents
Emergency vents
Release prevention barriers
Spill control systems
Tank valves and connections (piping)
5
Shop-Fabricated AST
6
Evidence of Shop Fabrication
7
Steel Diked ASTs
8
Concrete Exterior ASTs
UL 2085
• Steel Tank
• Integral containment liner
• Concrete Shell
9
Smaller Field-Erected ASTs
Limited in size:
• Greater than 75,000 gallons
• 50 feet maximum height
• 30 feet maximum diameter
• Equates to ~264,000 gallons
• Shell thickness less than ½ inch
and bottom thickness equal to ¼ inch
AST
Category 1 Category 2 Category 3
Type and Capacity
Field-erected AST P, E(5), I (10) P, E&L (5), I (10) P, E&L (5), I (10)
10
STI SPOO1 Inspection Frequency
Inspection Matrix
AST Type and Size (Us Category 1 Category 2 Category 3
Gallons)
0 – 1100 gal. P P P, E & L (10)
[P, E & L (5), I (10)]
R 1101 – 5000 gal. P P, E & L (10) OR
I Shop / Fabricated
[P, L (2), E (5)]
S [P, E (10), I (20)] [P, E & L (5), I (10)]
ASTs 5001 – 30,000
P, E (20) OR OR
K gal.
[P, E (5), L (10)] [P, L (1), E (5)]
30,001 – 75,000
P, E (20) P, E & L (5), I (15) [P, E & L (5), I (10)]
gal.
Portable Containers P P P**
11
STI SPOO1 Definitions
12
AST Category Chart (from STI SP001 Table A2.2):
Tank has Spill Tank has
Tank Configuration AST Category
Control? CRDM?
Single wall vertical AST in contact with ground and no spill control No No 3
Single wall vertical AST in contact with ground in an earthen dike Yes No 2
Single wall vertical AST in concrete dike with concrete floor. Concrete
Yes Yes 1
floor extends under tank completely
Single wall vertical AST in dike with elastomeric liner. Liner extends
Yes Yes 1
under tank completely
Single wall vertical AST installed on gravel and no spill control No No 3
Single wall vertical AST installed on gravel in an earthen dike Yes No 2
Elevated AST with spill control Yes Yes 1
Elevated AST without spill control No Yes 3
AST with double-bottom and spill control Yes Yes 1
Double-wall AST with overfill prevention Yes Yes 1
Double-wall AST without overfill prevention No Yes 3
Concrete exterior AST with overfill prevention Yes Yes 1
Concrete exterior AST without overfill prevention No Yes 3
13
STI SPOO1 Inspection Types
(#) indicates maximum inspection interval in years. For example, E(20) indicates formal
external inspection every 20 years
14
STI SPOO1 Inspection Frequency
Inspection Matrix
AST Type and Size (Us Category 1 Category 2 Category 3
Gallons)
0 – 1100 gal. P P P, E & L (10)
[P, E & L (5), I (10)]
R 1101 – 5000 gal. P P, E & L (10) OR
I Shop / Fabricated
[P, L (2), E (5)]
S [P, E (10), I (20)] [P, E & L (5), I (10)]
ASTs 5001 – 30,000
P, E (20) OR OR
K gal.
[P, E (5), L (10)] [P, L (1), E (5)]
30,001 – 75,000
P, E (20) P, E & L (5), I (15) [P, E & L (5), I (10)]
gal.
Portable Containers P P P**
15
API 653 Standard (5th Edition, November 2014)
16
API 653 Inspection Components
• Tank Foundation
• Bottom – flaw and thickness detection
• Shell – flaw and thickness detection
• Brittle Fracture/Failure Assessment
• Structure
• Roof
• Attached Appurtenances
• Nozzles to face of 1st flange, 1st threaded
joint, or 1st welding-end connection
17
Field-Erected AST
Applicability
• Capacity greater than 75,000 gallons
• Size greater than 50 feet in height and 30 feet in
diameter
• Welded or Riveted
18
API 653 Inspection Frequency
19
API 653 Inspection Frequency
Max. Initial
Tank Safeguard
Interval
Initial Internal
i) Original nominal bottom thickness 5/16 in. or greater 12 years Inspections
ii) Cathodic protection of the soil-side of the primary tank bottom per Note 1 12 years Intervals
iii) Thin-film lining of the product-side of the tank bottom per Note 2 12 years
• 10 years from
date of initial
iv) Fiberglass-reinforced lining of the product-side of the tank bottom per Note 2 13 years service, or
v) Cathodic protection plus thin-film lining 14 years • According to
Risk-Based
vi) Cathodic protection plus fiberglass-reinforced lining 15 years
Inspection
vii) Release prevention barrier per Note 3 (when similar service assessment performed) 20 years (RBI)
Assessment
viii) Release prevention barrier per Note 3 (when RBI assessment performed) 25 years
criteria
NOTE 1 For the purposes of 6.4.2.1, effective cathodic protection of the soil-side of the primary tank bottom means a system
installed and maintained in accordance with API 651.
NOTE 2 For purposes of 6.4.2.1, lining of the product-side of the tank bottom means a lining installed, maintained and inspected
in accordance with API 652.
NOTE 3 For purposes of 6.4.2.1, a release prevention barrier means an under-bottom leak detection and containment system
designed in accordance with API 650, Appendix I.
20
API 653 Inspection Frequency
Subsequent Internal
Procedure Used Max. Interval
Inspection Intervals
i) Corrosion rate procedures in 6.4.2.3 20 years
• Determined in
ii) RBI assessment per 6.4.2.4 25 years accordance with
iii) RBI assessment per 6.4.2.4 and a release prevention barrier per Note 30 years
corrosion rate
procedure
calculations
NOTE For purposes of 6.4.2.2, a release prevention barrier means an under-bottom leak detection and
containment system designed in accordance with API 650, Appendix I. • RBI procedures
• Not to exceed
maximum intervals
21
Comparison STI SP001 vs. API 653
Regulatory Compliance
• Both Standards provide compliance for tank integrity inspection for SPCC and local environmental
regulations
Applicability
• STI SP001 – All configurations of shop-built tanks and smaller field-erected tanks.
• API 653 - Field-erected tanks (welded or riveted). Also includes guidance for repair, alteration, relocation.
Cost
• STI SP001 - $700 to $2,000 depending upon tank configuration, insulation, economy of scale
• API 653 - $3,500 to $5,500 depending upon tank configuration and economy of scale