Checklist

The document is a report on the condition of chiller water pumps (CHWP) for a project. It provides data on 5 CHWP units, including the motor, pump, voltage, amps, rpm, and bearing numbers. Notes are included for CHWP 1-3 and a new motor for CHWP 4. The customer and executor signatures are at the bottom.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views

Checklist

The document is a report on the condition of chiller water pumps (CHWP) for a project. It provides data on 5 CHWP units, including the motor, pump, voltage, amps, rpm, and bearing numbers. Notes are included for CHWP 1-3 and a new motor for CHWP 4. The customer and executor signatures are at the bottom.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

LAPORAN KONDISI POMPA CHILLER ( CHWP )

PROYEK :
PERIODE :

NO DESCRIPTION CHWP 2 CHWP 3 CHWP 4 CHWP 5 KETERANGAN


1 BEARING MOTOR
2 BEARING POMPA
3 COUPLE
4 KARET COUPLE
5 MOUNTING BASE PLATE
6 PRESSURE GAUGE IN
7 PRESSURE GAUGE OUT
8 AMPERE MOTOR
9 SEAL POMPA
10 IMPELLER POMPA

CATATAN

DATA CHWP 1,2, DAN 3 DATA CHWP 4 DAN 5

MOTOR POMPA CHILLER MOTOR POMPA CHILLER


MERK : ELEKTRIM MERK : EBERA PUMP MERK : ELEKTRIM MERK : TERAL
MODEL : EM 160 L TYPE : P 111 692 - 18 MODEL : EMA 1325 - 4 TYPE : SB 4 -65 X 50 K 55 - 5
KW : 15 / 20 HP MODEL : 125 X 100 FS S4 KA KW : 15 / 20 HP RPM : 6305 ZZ
VOLT : Y : 660 V / 380 V CAP : 360 VOLT : Y : 660 V / 380 V RPM : 1500
AMPERE : 17,3 A HEAD : 35 M / 1450 RPM : 1440 TOTAL HEAD : 20 M
RPM : 1460 BRG NO : 6307 ZZ BRG NO:

CUSTOMER EXECUTOR

( ) ( )
LAPORAN KONDISI POMPA CHILLER ( CHWP )
PROYEK :
PERIODE :

NO DESCRIPTION CHWP 1 CHWP 2 CHWP 3 CHWP 4 KETERANGAN


1 BEARING MOTOR
2 BEARING POMPA
3 COUPLE
4 KARET COUPLE
5 MOUNTING BASE PLATE
6 PRESSURE GAUGE IN
7 PRESSURE GAUGE OUT
8 AMPERE MOTOR
9 CONTACTOR
10 SEAL POMPA
11 IMPELLER POMPA

CATATAN

DATA CHWP 1,2, DAN 3 MOTOR NO 4 ( BARU )

MOTOR POMPA CHILLER MOTOR POMPA CHILLER


ELEKTRIM MOTOR MERK : EBERA PUMP MERK : WESTERN ELEKTRIC MERK : EBERA PUMP
MODEL : SG 200 L 4 MODEL : 125 X 100 FS S4 4 LA MODEL : 1 D - 200 L - 4 MODEL : 125 X 100 FS S4 4 LA
KW : 30 / 40 HP CAP : 660 US GPM KW : 30 KW CAP : 660 US GPM
VOLT : Y : 660 V / 380 V HEAD : 40 M VOLT : Y : 660 V / 380 V HEAD : 40 M
AMPERE : 33 / 56 A KW : 30 KW/ 1450 RPM RPM : 1440 KW : 30 KW/ 1450 RPM
BRG NO : 6311 / 6211 BRG NO : 6309 ZZ X 2 BH BRG NO: 6312 C3 / 6212 C3 BRG NO : 6309 ZZ X 2 BH

CUSTOMER EXECUTOR

( ) ( )
TEHNIK UTAMA PRIMA
PERUMAHAN TAMAN ALAMANDA BLOK C 2 NO 44 RT 04/013 KELURAHAN KARANGSTRIA - TAMBUN - BEKASI
TLP : 0812 9410 867 / 0813 1671 2272

SERVICE WORK ORDER


NUMBER : DATE : DAY :
CUSTOMER WORK PERFORMED STATUS
NAME : [ ] SERVICE [ ] CHARGE
ADDRESS : [ ] REPAIR / OVERHAUL [ ] FREE
[ ] INSPECTION / SUPERVISI[ ] WARRANTY
[ ] TRIAL / TEST RUNNING [ ]
[ ] OTHERS [ ]
UNIT AND SYSTEM WORK DESCRIPTION
UNIT NO :
SYSTEM NO :
MODEL :
SERIAL :
MANUFACTURE :
COMPRESSOR :
SERIAL :
MATERIAL / PART USED

CUSTOMER NOTE TECHNICAL ADVISE

TIME ARRIVAL :
TIME DEPARATURE :
JOB COMPLETED : [ ] YES [ ] NO

SUPERVISOR EXECUTOR CUSTOMER

........................................ ............................ .................................................


...................
TEHNIK UTAMA PRIMA
LAPORAN KONDISI AHU
PROYEK :
PERIODE :
LOKASI :
AHU NO :
KONDISI
NO DESCRIPTION NILAI KETERANGAN
BAIK BERSIH RUSAK
1 COOLING COIL
a. Water Inlet temperature
b. Water outlet temperature
c. Water Delta Temperature
d. Water Inlet Pressure
e. Water Outlet Pressure
f. Water Delta Pressure
2 AIR FILTER
3 BLOWER
4 STRAINNER INLET WATER
5 BEARING BLOWER + PULLEY
a. Check Visual
b. Penambahan Grease ( Pelumasan )
6 BEARING MOTOR + PULLEY
a. Check Visual
b. Penambahan Grease ( Pelumasan )
7 FAN BELT
8 MOTORIZED TWOWAY VALVE
9 THERMOSTAT
10 BODY AHU
11 VALVE IN
12 VALVE OUT
13 PIPING INSULATION
14 CONTACTOR
a. Main Contactor
b. Delta Contactor
c. Star Contactor
15 MOTOR AHU
a. Ampere Motor FLA :
b. Check terminal motor
c. Retighten terminal connection
16 DRAIN SYSTEM
CATATAN :

CUSTOMER EXECUTOR
............................ ...............................
LAPORAN KONDISI CHILLER
PROYEK :
PERIODE :
CHILLER NO :
COMPRESSOR
NO DESCRIPTION KETERANGAN
1
1 MOTOR FAN CONDENSER & CONTACTOR
FAN 1
FAN 2
FAN 3
FAN 4
FAN 5
FAN 6
FAN 7
FAN 8
FAN 9
FAN 10
3 CONTACTOR COMPRESSOR
a. Main Contactor
b. Delta Contactor
c. Star Contactor
4 SENSOR TEMPERATURE
a. Suction temperature
b. Leaving Water Temperature
c. Return Water Temperature
5 HP SWITCH
6 LP SWITCH
7 BATTERY EXPANTION DRIVER
8 EVD DRIVER
9 FLOW SWITCH
10 MOTORIZED VALVE LEAVING WATER
11 CAPACITY TRANSDUCER
12 REFRIGERANT R 134 a
13 OIL EMKARATE RL 68
14 TRANSDUCER HP
15 TRANSDUCER LP
16 BATTERY CHARGER
17 MAIN BOARD PICO CARREL
18 DISPLAY PICO CARREL
19 CORE DRIER
20 OIL FILTER
21 PHASE MONITOR
22 FUSE COMPRESSOR
23 OVER LOAD COMPRESSOR
24 OVER LOAD FAN CONDENSER
25 FUSE CONTROL
26 ELECTRONIC EXPANTION VALVE
CUSTOMER EXECUTOR

............................. ...............................
Mc QUAY SINGLE SCREW LOG SHEET - MICROTECH II
PROYEK : DATE :
MODEL : TIME :
CHILLER NUMBER :
SERIAL NUMBER :
DESCRIPTION STANDARD COMPRESSOR
1 UNIT STATUS 1 2 3
a Unit Status ON / OFF ON
b Unit Stagging % 25 - 100
c Setpoint Source °C 6 - 10 C
2
a Ent Evap Temp °C 10 - 16 C
b Lvg Evap Temp °C 6 - 12 C
c Delta Evap Water Tem °C 2-5C
3 COMPRESSOR STATUS
a Status Auto/ Man Auto
b Compressor Stagging % 25 - 100
c Saturated Evap Pressu Bar 1.5 - 4.5
d Saturated Evap Temp °C ( - 3.3 ) - 8.6
e Saturated Cond Pressu Bar 10 - 16.0
f Saturated Cond Temp °C 40.6 - 62.8
g Suction Temperature °C 6.2 - 18.5
h Suction Superheat °C 3.0 - 8.5
i Delivery Superheat °C 30.0 - 42.5
j Expantion Position 900 - 1800
k Oil Pressure ( I/O menu Bar 11.5 - 16
l Discharge temperatur °C 60.0 - 98
m Stage Position Up/Dn/Fix/Of
4 MANUAL INSPECTION
a Inlet Water Pressure Kg/Cm² 2.0 - 4.5
b Outlet Water Pressure Kg/Cm² 2.0 - 4.5
c Delta Evap Water Pres Kg/Cm² 0.5 - 1.0
5 d Oil Level % 50 - 100
e Liquid Line Sight GlassClear / Bubbl Clear
f Fan Condenser Status n 5.
6 ELECTRICAL MEASURMENT
R AMPERE < 260
a Ampere S AMPERE < 260
T AMPERE < 260
NOTE
GALUH PAKUAN SERVICE
PERUMAHAN TAMAN ALAMANDA BLOK C 2 NO 44 RT 04/013 KELURAHAN KARANGSTRIA - TAMBUN - BEKASI
TLP : 0812 9410 867 / 0813 1671 2272

SERVICE WORK ORDER


NUMBER : DATE :
CUSTOMER WORK PERFORMED
NAME : [ ] SERVICE
ADDRESS : [ ] REPAIR / OVERHAUL
[ ] INSPECTION / SUPERVISI
[ ] TRIAL / TEST RUNNING
[ ] OTHERS
UNIT AND SYSTEM WORK DESCRIPTION
UNIT NO :
SYSTEM NO :
MODEL :
SERIAL :
MANUFACTURE :
COMPRESSOR :
SERIAL :
MATERIAL / PART USED

CUSTOMER NOTE TECHNICAL ADVISE

TIME ARRIVAL :
TIME DEPARATURE :
JOB COMPLETED : [ ] YES [ ] NO

SUPERVISOR EXECUTOR
........................................ ............................
SERVICE
HAN KARANGSTRIA - TAMBUN - BEKASI
2272

ORDER
DAY :
STATUS
[ ] CHARGE
[ ] FREE
[ ] WARRANTY
[ ]
[ ]
WORK DESCRIPTION

TECHNICAL ADVISE

CUSTOMER
..................................................
LAPORAN CHECKLIST HARIAN CHILLER
PROYEK DATE :
MODEL TIME :
CHILLER NUMBER :
DESCRIPTION STANDARD COMPRESSOR
1 UNIT STATUS R 407 C
a Unit Status ON / OFF ON
b Unit Stagging % 25 - 100
c Setpoint Source °C 6.0 - 10.0
2 WATER STATUS
a Ent Evap Temp °C 12.0 - 16.0
b Lvg Evap Temp °C 5.5 - 12.0
c Delta Evap Water Temp °C 2.0 - 5.0
3 COMPRESSOR STATUS
a Status Auto/ Man Auto
b Compressor Stagging % 25 - 100
c Saturated Evap Pressure Bar 3.3 - 5
d Saturated Evap Temp °C ( -1.1 ) - 8.9
e Saturated Cond Pressure Bar 16.0 - 25.0
f Saturated Cond Temp °C 40.6 - 60.0
g Suction Temperature °C 3.0 - 12.0
h Suction Superheat °C 3.0 - 6.0
I VALVE Position 1800 - 3000
k Oil Pressure ( I/O menu ) Bar 16.0 - 25.0
l Discharge temperature °C 60.0 - 95.0
m Stage Position Up/Dn/Fix/Off
4 MANUAL INSPECTION
a Inlet Water Pressure Kg/Cm² 2.0 - 3 Bar
b Outlet Water Pressure Kg/Cm² 2.0 - 3 Bar
c Delta Evap Water Pressure Kg/Cm² 0.5 - 1 Bar
5 d Oil Level % 50 - 100
e Liquid Line Sight Glass Clear / Bubble Clear
6 ELECTRICAL MEASURMENT
7 AMPERE COMPRESSOR Ampere
8 KONDISI FAN CONDENSER
9 KONDISI POMPA CHILLER CHWP 1 CHWP2 CHWP 3 CHWP 4 CHWP5
a Bearing motor
b Bearing Pompa
c Kopel
d Karet Kopel
e Ampere Motor
f Mechanical seal
g Impeller pompa
h Make Up Water
CHECKED BY SUPERVISED BY Head Of Engineering CUST0MER
LAPORAN KONDISI FCU
PROYEK :
PERIODE :
LOKASI :
FCU NO :
KONDISI
NO DESCRIPTION NILAI KETERANGAN
BAIK BERSIH RUSAK
1 COOLING COIL
2 AIR FILTER
3 BLOWER
4 STRAINNER INLET WATER
5 BLOWER
a. Kondisi Blower
b. Kondisi Motor
c. Kondisi capcitor
d. Kondisi Fan belt
b. Penambahan Grease
8 MOTORIZED TWOWAY VALVE
9 THERMOSTAT
10 BODY FCU
11 VALVE IN
12 VALVE OUT
13 PIPING INSULATION
15 MOTOR FCU
a. Ampere Motor FLA :
b. Check terminal motor
c. Retighten terminal connection
16 DRAIN SYSTEM
CATATAN :

CUSTOMER EXECUTOR

............................ ...............................
...................
PT. MULIA INTAN PERSADA
GENERAL CONTRACTORS, MECHANICAL ELECTRICAL SPECIALIST,
DESIGN & BUILD

LAPORAN CHECKLIST HARIAN CHILLER


PROYEK PERAWATAN CHILLER KENCANA DATE
MODEL TIME
CHILLER NUMBER
DESCRIPTION STANDARD COMPRESSOR
1 UNIT STATUS R 134 a 1 2 3
a Unit Status ON / OFF ON
b Unit Stagging % 25 - 100
c Setpoint Source °C 6 - 10 C
2 WATER STATUS
a Ent Evap Temp °C 10 - 16 C
b Lvg Evap Temp °C 6 - 12 C
c Delta Evap Water Temp °C 2-5C
3 COMPRESSOR STATUS
a Status Auto/ Man Auto
b Compressor Stagging % 25 - 100
c Saturated Evap Pressure Bar 1.5 - 4.5
d Saturated Evap Temp °C ( 0.3 ) - 8.6
e Saturated Cond Pressure Bar 10 - 16.0
f Saturated Cond Temp °C 40.6 - 62.8
g Suction Temperature °C 6.2 - 18.5
h Suction Superheat °C 3.0 - 8.5
i Delivery Superheat °C 30.0 - 42.5
j Expantion Position 900 - 1800
k Oil Pressure ( I/O menu ) Bar 11.5 - 16
l Discharge temperature °C 60.0 - 98
m Stage Position Up/Dn/Fix/Off
4 MANUAL INSPECTION
a Inlet Water Pressure Kg/Cm² 2.0 - 4.5
b Outlet Water Pressure Kg/Cm² 2.0 - 4.5
c Delta Evap Water Pressure Kg/Cm² 0.5 - 1.0
d Oil Level % 50 - 100
e Liquid Line Sight Glass Clear / Bubble Clear
5 KONDISI FAN CONDENSER Contactor Bearing Contactor Bearing Contactor Bearing
a FAN NO 1
b FAN NO 2
c FAN NO 3
d FAN NO 4
e FAN NO 5
6 KONDISI POMPA CHILLER CHWP1 CHWP 2 CHWP 3 CHWP 4 NOTE
a Bearing Motor
b Bearing pompa
c Kopel
d Karet kopel
e Pelumasan Bearing
f FLA Motor 56 A 56 A 56 A 56 A 56 A
g Running Ampere Motor
RSUPN Dr.Cipto Mangunkusumo User RSCM Pengawas Teknisi pelaksana

Nuzul Putra Prima,ST.MT Purwo Deswanto,Amd Suharta Wijaya


NPS : 145521 NIP : 197012172010121001 NPS : 143773
LAPORAN CHECKLIST HARIAN CHILLER
PROYEK PERAWATAN CHILLER KENCANA DATE
MODEL TIME
CHILLER NUMBER
DESCRIPTION STANDARD COMPRESSOR
1 UNIT STATUS R 134 a 1 2 3
a Unit Status ON / OFF ON
b Unit Stagging % 25 - 100
c Setpoint Source °C 6 - 10 C
2 WATER STATUS
a Ent Evap Temp °C 10 - 16 C
b Lvg Evap Temp °C 6 - 12 C
c Delta Evap Water Temp °C 2-5C
3 COMPRESSOR STATUS
a Status Auto/ Man Auto
b Compressor Stagging % 25 - 100
c Saturated Evap Pressure Bar 1.5 - 4.5
d Saturated Evap Temp °C ( 0.3 ) - 8.6
e Saturated Cond Pressure Bar 10 - 16.0
f Saturated Cond Temp °C 40.6 - 62.8
g Suction Temperature °C 6.2 - 18.5
h Suction Superheat °C 3.0 - 8.5
i Delivery Superheat °C 30.0 - 42.5
j Expantion Position 900 - 1800
k Oil Pressure ( I/O menu ) Bar 11.5 - 16
l Discharge temperature °C 60.0 - 98
m Stage Position Up/Dn/Fix/Off
4 MANUAL INSPECTION
a Inlet Water Pressure Kg/Cm² 2.0 - 4.5
b Outlet Water Pressure Kg/Cm² 2.0 - 4.5
c Delta Evap Water Pressure Kg/Cm² 0.5 - 1.0
d Oil Level % 50 - 100
e Liquid Line Sight Glass Clear / Bubble Clear
5 KONDISI FAN CONDENSER Contactor Bearing Contactor Bearing Contactor Bearing
a FAN NO 1
b FAN NO 2
c FAN NO 3
d FAN NO 4
e FAN NO 5
6 KONDISI POMPA CHILLER CHWP1 CHWP 2 CHWP 3 CHWP 4 NOTE
a Bearing Motor
b Bearing pompa
c Kopel
d Karet kopel
e Pelumasan Bearing
f FLA Motor 56 A 56 A 56 A 56 A 56 A
g Running Ampere Motor
RSUPN Dr.Cipto Mangunkusumo User RSCM Pengawas Teknisi pelaksana

Nuzul Putra Prima,ST.MT Purwo Deswanto,Amd Suharta Wijaya


NPS : 145521 NIP : 197012172010121001 NPS : 143773
LAPORAN PEKERJAAN PEMELIHARAAN AC
PROYEK PERAWATAN TATA UDARA KENCANA
PERIODE
TANGGAL
LOKASI

AHU / FCU NO :
KONDISI KONDISI KONDISI KONDISI
NO DESCRIPTION NILAI
Bersih Baik Rusak Bersih Baik Rusak Bersih Baik Rusak Bersih Baik Rusak
1 COOLING COIL
2 FILTER
3 Strainner Inlet Water
4 BLOWER
a. Kondisi Blower
b. Kondisi Motor
c. Kondisi Fan belt
d. Ukuran Fan Belt
e. Kondisi bearing
f. Penambahan Grease
5 MOTORIZED Valve
6 THERMOSTAT
7 Temperatur Ruangan
8 BODY FCU
9 ISOLASI PIPA
10 MOTOR FCU
a. Ampere Motor
b. FLA Motor
c.Terminal motor
11 DRAIN SYSTEM
CATATAN :

CHECKED BY SUPERVISED BY CUSTOMER HEAD OF ENGINEERING


Proyek PERAWATAN TATA UDARA KENCANA Merk Unit
Lokasi Model Unit
Tanggal Kapasitas Unit
Jam Mulai Refrigerant
Jam Selesai
V Dikerjakan
PEKERJAAN PERAWATAN AC SPLIT
X Tidak
INDOOR UNIT
Putuskan pasokan listrik di panel AC
Bersihkan kotoran/debu pada cover indoor
Bersihkan kotoran/debu pada blower fan indoor
Periksa skrup cover Indoor terhadap kemungkinan karat
Bersihkan kotoran pada komponen listrik dan PCB control
Bersihkan motor blower, dan periksa bearing
Bersihkan dan check kondisi saluran drain air kondensasi
Bersihkan filter dan fin Evaporator
OUTDOOR UNIT
Putuskan pasokan listrik di panel AC
Bersihkan fin Condenser dengan steam air
Perbaikan Fin Condenser jika ada yg rebah
Bersihkan body condenser
Bersihkan kotoran pada komponen listrik, relay, contactor
Pemeriksaan dan pengencangan koneksi pada terminal kabel
PENGUJIAN ARUS LISTRIK
Pengukuran beban dengan tang ampere ( sebelum cleaning )
Pengukuran beban dengan tang ampere ( sesudah cleaning )
PENGUJIAN TEKANAN REFRIGERANT
Pengukuran tekanan suction dengan Manifold Gauge ( sebelum cleaning )
Pengukuran tekanan suction dengan Manifold Gauge ( sesudah cleaning )
CATATAN / REKOMENDASI

Dengan ini menerima hasil pekerjaan yang dilakukan sesuai yang tercantum diatas
Checked By Supervised By User RSCM Head Office Engineering
LAPORAN CHECKLIST HARIAN CHILLER
PROYEK PERAWATAN CHILLER KIRANA DATE
MODEL TIME
CHILLER
NO DESCRIPTION STANDARD

1 UNIT STATUS / REFRIGERANT R 407 C COMP 1 KETERANGAN


a Unit Status ON / OFF ON
b Unit Stagging % 25 - 100
c Setpoint Source °C 6.0 - 10.0
2 WATER STATUS
a Ent Evap Temp °C 12.0 - 16.0
b Lvg Evap Temp °C 5.5 - 12.0
c Delta Evap Water Temp °C 2.0 - 5.0
3 COMPRESSOR STATUS
a Status Auto/ Man Auto
b Compressor Stagging % 25 - 100
c Saturated Evap Press Bar 3.3 - 5
d Saturated Evap Temp °C ( -1.1 ) - 8.9
e Saturated Cond Press Bar 16.0 - 25.0
f Saturated Cond Temp °C 40.6 - 60.0
g Suction Temperature °C 3.0 - 12.0
h Suction Superheat °C 3.0 - 6.0
I VALVE Position 1800 - 3000
k Oil Pressure Bar 16.0 - 25.0
l Discharge temperature °C 60.0 - 95.0
m Stage Position Up/Dn/Fix
4 MANUAL INSPECTION
a Inlet Water Pressure Kg/Cm² 2.0 - 3 Bar
b Outlet Water Pressure Kg/Cm² 2.0 - 3 Bar
c Delta Evap Water Press Kg/Cm² 0.5 - 1 Bar
5 d Oil Level % 50 - 100
e Liquid Line Sight Glass Clear/Bubble Clear
6 AMPERE COMPRESSOR FLA A
7 KONDISI Fan Condenser FAN 1 FAN 2 FAN 3 FAN 4 FAN 5 FAN 6 FAN 7 FAN 8 FAN 9 FAN 10
a Bearing
b Contactor
8 KONDISI POMPA CHILLER CHWP 1 CHWP 2 CHWP 3 CHWP 4 CHWP 5
a Bearing motor
b Bearing Pompa
c Kopel
d Karet Kopel
e FLA Motor 17,3 A 17,3 A 17,3 A 12,4 A 12,4 A
f Running Ampere Motor
g Pelumasan Bearing
CATATAN :

CHECKED BY SUPERVISED BY CUSTOMER HEAD OF ENGINEERING


LAPORAN PEMELIHARAAN/PERBAIKAN RO
PROYEK PEMELIHARAAN/PERBAIKAN RO RS UI
PERIODE
TANGGAL
LOKASI

NO DESCRIPTION JENIS KEGIATAN Keterangan

1
2
3
4

CATATAN :

TEKNISI USER
Lokasi Merk Unit
Tanggal Model Unit
Jam Mulai Kapasitas Unit
Jam Selesai Refrigerant
V Dikerjakan
PEKERJAAN PERAWATAN AC SPLIT
X Tidak
INDOOR UNIT
Putuskan pasokan listrik di panel AC
Bersihkan kotoran/debu pada cover indoor
Bersihkan kotoran/debu pada blower fan indoor
Periksa skrup cover Indoor terhadap kemungkinan karat
Bersihkan kotoran pada komponen listrik dan PCB control
Bersihkan motor blower, dan periksa bearing
Bersihkan dan check kondisi saluran drain air kondensasi
Bersihkan filter dan fin Evaporator
OUTDOOR UNIT
Putuskan pasokan listrik di panel AC
Bersihkan fin Condenser dengan steam air
Perbaikan Fin Condenser jika ada yg rebah
Bersihkan body outdoor unit
Bersihkan kotoran pada komponen listrik, relay, contactor
Pemeriksaan dan pengencangan koneksi pada terminal kabel
PENGUJIAN ARUS LISTRIK
Pengukuran beban dengan tang ampere ( sebelum cleaning )
Pengukuran beban dengan tang ampere ( sesudah cleaning )
PENGUJIAN TEKANAN REFRIGERANT
Pengukuran tekanan suction dengan Manifold Gauge ( sebelum cleaning )
Pengukuran tekanan suction dengan Manifold Gauge ( sesudah cleaning )
CATATAN

Dengan ini menerima hasil pekerjaan yang dilakukan sesuai yang tercantum diatas
Checked By