0% found this document useful (0 votes)
172 views10 pages

Sample Method Statement PDF

This document provides a method statement for the proposed installation of additional cameras to an existing CCTV system. It outlines the following key points in 3 sentences or less: 1) The systems will be installed according to specification 6 for adding equipment to the existing system. 2) The engineers will ensure work is done safely and efficiently, following all health and safety procedures. 3) The document details specific safety measures around first aid, PPE, electrical safety, working at heights, waste management and more.

Uploaded by

Sujith Kunjumon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
172 views10 pages

Sample Method Statement PDF

This document provides a method statement for the proposed installation of additional cameras to an existing CCTV system. It outlines the following key points in 3 sentences or less: 1) The systems will be installed according to specification 6 for adding equipment to the existing system. 2) The engineers will ensure work is done safely and efficiently, following all health and safety procedures. 3) The document details specific safety measures around first aid, PPE, electrical safety, working at heights, waste management and more.

Uploaded by

Sujith Kunjumon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

METHOD STATEMENT

PROPOSED INSTALLATION OF
ADDITIONAL CAMERAS TO YOUR CCTV
SYSTEM.

PREPARED BY
Paul Chater (Director)

Smarter Security Solutions Ltd SSS


Office S22/S23
Moulton Park Business Centre
Redhouse Road Moulton Park
Northampton
NN3 6AQ

FOR WORKS AT

Smarter Security Solutions Ltd SSS


Subject: Method Statement

1. The systems will be installed generally as per the specification reference 6


for the installation of (additional equipment to the System).
1.2. Applicable Drawings: N/A

2. All our employees are responsible for their own safety, as well as the
safety of others who may be affected by their acts or omissions.
2.1. A common source of accidents is the condition & operation of equipment
used on site. In order to minimise the probability of accidents, all
equipment carried by Company Engineers will be formally audited on an
annual basis & supplemented by an additional, random safety inspection
carried out by their Manager.

3. Our engineers will ensure the work is being carried out in an efficient,
safe manner.
Only the highest standards of behaviour are expected of Company
Employees whilst on client’s premises on their Health & Safety.

On entering the site our Engineers must:-


 Report / Sign in.
 Determine the nature (if any) of hazards, they may be subjected to in
carrying their assigned tasks.
 Ensure it is safe to carry out the work before proceeding.
 Read & comply with all relevant instructions regarding emergency
procedures & local rules.
 Determine the location of control areas, including first aid posts.

Good housekeeping is essential in maintaining a courteous & working


relationship with the client. Accordingly, Engineers are encouraged to
clear away their waste, correctly store tools & clothing, keep gangways
clear for emergencies & generally demonstrate a positive attitude to site
safety. Instances of hazards beyond the Engineers control must be
reported to the Client immediately.

Company Employees will NOT operate specialised lifting equipment such


as forklift trucks, cranes, hydraulic equipment, etc unless licensed to do
so.

Engineers should inform Client of their departure from site & advise the
Client of any critical information regarding the state of his system.

Smarter Security Solutions Ltd SSS


4. First Aid

If you have an accident:-

 Report to the Client or his employees for treatment, if possible,


otherwise seek appropriate medical attention.
 Advise their Manager.
 Ensure the incident is recorded on the Client’s site & at our Office

In the case of serious injuries, the Company Safety Officer must be


informed.

4.1. Personal Protective Equipment

PPE is issued as a minimal protection & as a last resort to protect


Engineers from specific hazards & Engineers MUST wear it where
conditions require. It is the Engineer’s responsibility to obtain from his
Manager the correct items of PPE to perform specific tasks. This
equipment will be checked on audit.
As a general guide, safety goggles should be worn when drilling or other
activities potentially dangerous to the eyes. Hard hats, high visibility
jackets and safety shoes will be worn whilst in hazardous areas.

All safety equipment should be in accordance with current British


Standards.

4.2. COSHH

We are not aware of any hazardous substances to be used on this job.

4.3. Smoking
Engineers MUST comply with the Client’s Policy on smoking at all times
when on site.

Smarter Security Solutions Ltd SSS


4.4. Portable Electrical Equipment.

Electrical equipment has the greatest lethal potential than any other
hazards the Engineers has to deal with. It is therefore essential that a safe
system of work be complied with.

Engineers MUST comply with the Electricity at Work Regulations 1989


when working with electrical systems.

A qualified electrician or ‘competent person’ may only make panel


connections to an isolated mains supply.

Where possible, Engineers are encouraged to use battery – powered tools.

Whatever electrical powered tools are used, they MUST be suitable for
the environment. Where locations are wet, dusty, flammable or explosive,
electrical equipment must be compatible with the hazard.

All electrical installation work must be in accordance with the current


edition of the IEE Regs.

4.5. Safety Harness

Engineer’s safety harnesses are audited annually, but the person using it
must inspect the harness every time it is used. The inspection should
include a close examination of the stitching, buckles, hooks & the ropes.

Where there is a cause for concern as a result of the examination, the


harness should be conspicuously labelled & returned to their Manager.

Only harness approved to British Standards are to be used & no


unauthorised attachments are to be added.

Fixing points on buildings & other structures must be of adequate strength


& suitable for the purpose. Approval for their use must be obtained from
the Client.

Smarter Security Solutions Ltd SSS


4.6. Working on Roofs

Correct permits must be obtained before access to the roof will be allowed. Our
engineers will ensure that there fully comply with the sites rules on roof work.

4.7. Use of Equipment

Only Company owned equipment, or that hired from Hiring Firm


approved by the Company, is to be used on site.

All equipment is to be visually examined for defects. Suspect equipment


is not to be used. We intend to utilise mechanical access equipment
during our works, all our operations are fully trained & licensed.

Ladders & steps are a major source of serious accidents. Considerable


care is required to ensure they are correctly sited on safe ground in a safe
area & can be used with minimum risk.

Current Statutory Provisions state that ladders should only be used for
access to a work area, or for short periods, no more than 10 – 15 minutes.

Great care is taken to avoid tools & equipment falling from a height. The
safest way is to hoist items by rope. Small tools may be carried by a belt.

Ladders should be erected at an angle of 75 degrees (1 out to 4 up). They


are to be firmly secured near the top to prevent falls & should extend at
least 1.05m above the access point.

Areas immediately below the ladder should be roped off to prevent access
& hence injury, by falling objects.

Smarter Security Solutions Ltd SSS


4.8. Waste Management

Client’s waste is to be disposed of on the Client’s site. Under no


circumstances any non-Company waste to be removed from site by a
Company Employee.
Company waste, except for batteries & ionisation detectors, may only be:-

 Disposed of on site with Client approval.


 Removed from site by a registered Waste Company.
 Removed from site & returned to the Branch.

To avoid later disputes, the Engineer should report what has been
removed on Docket or Handover Certificate.

Dry fit batteries are to be returned to the Branch for transit to the
Warehouse.

Sub-Contractors are responsible for disposing of their own waste.

4.8. The Employee

Engineers on site must conduct their business with respect to the Client.
They should demonstrate courtesy to other site personnel at all times.
Horseplay & pranks cause accidents & this behaviour is unacceptable.

Company Employees are not to drink alcohol during working hours, nor
should arrive for work whilst under the influence of alcohol.

Abuse of drugs or solvents will justify disciplinary action.

Company Employees will be expected to be equipped with the necessary


kit & tools to carry out their duties on the Client’s site. They will also be
expected to demonstrate their competence for the job in hand & advise
their Managers when circumstances prevent their normal routine or when
unplanned risks are identified.

Apprentices & Trainees are to be adequately supervised at all times.

“Loner workers” must be advised of precautions to be observed during


their work & of emergency procedures that may be needed.

Smarter Security Solutions Ltd SSS


Working Hours – Employees must ensure they do not risk their own
health or safety, or that of others, by working excessive hours. The
Company will at all times abide by the statutory regulations & guidelines
pertaining to work time. The Company, where required, will seek
guidance from the Employees Federation.

The system will be installed generally as per the Client i.e. submitted for
approval based on the agreed standard specification. No procurement will
take place until design has been approved.

Liase with the electrical contractor on the design of the containment


system & preparation of drawings for approval to enable installation of
trunking, conduits & 240 volts mains supply feeds to the correct locations.

5. ON SITE WORK BY PHASE

Installation of cables would commence in line with agreed programme of


works.

PHASED PROGRAMMING

Liaise with Project Estate Department.

SECOND FIX BY PHASE

The installation of electronics & devices would commence.

As each point comes on line with power, its local operation is tested with
all the associated hardware. This ensures all local wiring is correct.

Smarter Security Solutions Ltd SSS


TESTING & COMMISSIONING

Test & commissioning of the system will take place when the cabling &
all devices have been fully installed.

The commissioning of the system will be carried out with approved


design parameter checklist documentation.

5.1. Wherever possible, completed goods are to be delivered to site without


delay. It is the responsibility of the Installation Manager to ensure that:

1) Any special instruction for packaging & also case marking are
complied with.
2) Packaging is of suitable quality to afford the protection required in
transit & on site. Due consideration is given to environmental
conditions, time in transit & handling methods en route.
3) Safe & secure modes of transport are used. (Under normal
circumstances Smarter Security Solutions Limited transport is to be
used although on practical & economical grounds approved carriers
may be used).

It is the responsibility of the Client to provide on site storage facilities. In the


event that on site storage is not available, bonded storage arrangements will be
made by Smarter Security Solutions Limited & an invoice raised on the Client
for any goods stored therein. It is our policy to store the minimum of equipment
on site necessary to maintain the smooth running of the contract.

All appropriate personnel are instructed in the need for extreme care when
handling material, particularly as some items are of a fragile nature. Special
emphasis is placed on ensuring that:

1) Material is afforded adequate protection during its movement through the


works, in transit to site & during movement around site.
2) Special materials & components cannot become mixed with those of
unknown or dissimilar quality.

Smarter Security Solutions Ltd SSS


5.2. ON SITE QUALITY CONTROL

This will essentially be the responsibility of the Installation Manager. He will


ensure that the system is being installed to specification at all times. He will
also ensure that:

A) The system is installed to British Standards.


B) Correct drawings are in circulation & being worked to at all times.
C) Obsolete drawings are removed from circulation.
D) All work is carried out in a neat & professional manner. (This
responsibility will be delegated by Installation Supervisor when
appropriate).

6. ON SITE WORK BY PHASE

The work as per specification reference is schedule for a maximum


of 14 day.

7. HEALTH & SAFETY RISK ASSESSMENT

DETAILS OF HIGH RISK

8. Ceiling level work carried out from ladder/steps/mobile tower


scaffold/mechanical access equipment.
8.1. Working on/with equipment connected to 230v ac supply
8.2. Head injury from falling or falling objects
8.3. Personal injury from the misuse of hand tools or incorrectly completed
installations.

PROPOSED ACTIONS OR REMEDIES

8.4.
a) Extension ladders to be raised or lowered from base.
b) Ladder should be placed on a firm level surface at an angle of 75.
c) Ensure ladder correctly secured.
d) Mobile scaffold tower will be erected & used by our qualified engineers.
e) All engineers trained on use of mechanical access equipment & hold valid
licence.

Smarter Security Solutions Ltd SSS


8.5.
a) Live working on 230v ac powered equipment prohibited.
b) Suitable equipment isolation supplied.
c) Separation of 230v ac & low voltage wiring.
d) Training of all staff.

8.6.
a) Issue of relevant staff with head protection.
b) Regular inspection to ensure hard hats serviceable.
c) Training of all relevant staff.

8.7.
a) Training for all relevant staff on correct methods of using hand tools &
installation techniques.
b) Training of all relevant staff on the importance of completing installation
& leaving the work place clean.
c) Training to all relevant staff in equipment & maintenance.

8.8.
a) Emergency Telephone Number is 08452577318
24 hour number.

Smarter Security Solutions Ltd SSS

You might also like