Checklist For Excavation and Backfilling of Structures

Sign: Assistant: Sign: Assistant: Sign:

Uploaded by

Sreyleap Nhet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Checklist For Excavation and Backfilling of Structures

Sign: Assistant: Sign: Assistant: Sign:

Uploaded by

Sreyleap Nhet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT NAME

Location:

CHECK SHEET FOR:


Form No. : 0
EXCAVATION AND BACKFILLING – STRUCTURES
Rev. No. : 0
SUBCONTRACTOR CONTRACTOR
 Page : 1 of 1

Section of Work: CIVIL – SITE WORKS Location:


Level:

Checked by Checked by
STAGE ITEM CONSULT DATE
S/C CONT.
ANT

Setting Out – Lines &


- Lines & Levels are within the Specified Tolerances.
Levels

Dewatering System - Area is free from water

Excavation For - Nature ground lines & levels are recorded & agreed
Structure

- Elevation & Dimension as shown on the Latest Approved


Drawings.

- Bottom of excavation is not disturbed.

- Underground services protected (If any)

Backfill Materials - Verify Tested & Approved

Placement &
- 200 mm layers for compaction by heavy equipment
Compaction

- 100 mm layers for compaction by hand – operated


equipment

- Compaction Test carried out &Results are Satisfactory

For S/C: Date: For CONTRACTOR QA/QC: Date For CONSULTANT Rep. Date: