This document provides cost estimates for the construction of a 3-floor residential building. It lists 14 line items with detailed costs for things like: 1) Brick work for a sump totaling Rs. 96,669 2) Compound wall costs of Rs. 49,950 for the eastern side and Rs. 92,842 for the western side 3) Weathering course with brick jelly and white tiles flooring for Rs. 1,61,000 The total estimated cost for the proposed construction as per the 14 line items is Rs. 69,90,150

Uploaded by

Maha Kalai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views10 pages

Madhan Kumar Bill PDF

This document provides cost estimates for the construction of a 3-floor residential building. It lists 14 line items with detailed costs for things like: 1) Brick work for a sump totaling Rs. 96,669 2) Compound wall costs of Rs. 49,950 for the eastern side and Rs. 92,842 for the western side 3) Weathering course with brick jelly and white tiles flooring for Rs. 1,61,000 The total estimated cost for the proposed construction as per the 14 line items is Rs. 69,90,150

Uploaded by

Maha Kalai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

FINAL DETAIL BILLS OF PROPOSED CONSTRUCTION OF GROUND FLOOR, FIRST FLOOR AND

SECOND FLOOR RESIDENTIAL BUILDING FOR MR. MADHAN KUMAR AT PLOT - 07,
1st STREET,EASWARI NAGAR, ZAMIN PALLAVARAM, CHENNAI - 600 043.

BUILT UP AREA
Ground floor area - 1565 sq.ft x 1650/- 25,82,250
First floor area - 1605 sq.ft x 1650/- 26,48,250
Second floor area - 680 sq.ft x 1650/- 11,22,000
2nd floor head room area - 231 sq.ft x 1650/- 3,81,150
Concrete slab - 220 sq.ft x 950/- 2,09,000
Back side service area - 50 sq.ft x 950/- 47,500
69,90,150 69,90,150

1 BRICK WORK SUMP

Providing Brick work sump


Outer Size 8' -10.5'' x 7'-10.5" x 5'-6"
Inner Size 7' -4.5'' x 6'-4.5" x 4'-6" = 212 cft

Specification :
9" thickness brick work wall all around the sump
Top and Bottom 5" thickness concrete slab with water Proffing
inside wall full of tiles work
Convert to litre 212 cft x 28.31 = 6,000 litres
SUMP COST 6,000 litres x 15/- = 90,000
Sump Tiles 171Sq.ft x 22/- = 3,762
Sump Tiles Laying Labour per Sq.ft 17/- x 171 = 2,907
Total = 96,669 96,669

2 COMPOUND WALL

EASTERN SIDE COMPOND WALL


Total Rft - 37rft x Height - 8'-0" 1 rft @1350/- = 37 rft x 1350/-
Specification :
Providing plinth beam Size 1'-0" x 0'-9" Length 37rft
Providing pillar 6Nos Size 9" x 9" Height 8'-0"
Providing solid block bricks, plastering work and white
washing work.
one rft @ 1350/-
37 rft @ 1350/- 49,950

WESTERN SIDE COMPOND WALL


Total Rft - 31rft App x Average Height - 10'-0" 1 rft
Specification :
Providing plinth beam Size 1'-0" x 0'-9" 41rft
Providing beam above the compound wall Size 1'-0" x 0'-9" 19rft
Providing piller 2Nos Size 1'-0" x 9" Height 11feet
Providing piller 3Nos Size 9" x 9" Heght 11feet
Providing bricks work, inner and outter plastering work and
white washing work.
Bricks 1500 Nos x 8/- = 12,000
3/4 jelly 85 cft x 35/- = 2,870
Sand 250 cft x 55/- = 13,750
Rods :
16mm - 3nos x 52/- = 3,402
8mm - 13nos x 52/- = 3,380
12mm - 5nos x 52/- = 2,990
Cement 45Bag x 350/- = 15,750
Labours = 38,700
Total = 92,842 92,842

3 WEATHERING COURSE

Providing Brick jelly with White tiles flooring


1400 sqft @ 115/- 1,61,000

4 CONCRETE OVER HEAD TANK

Providing concrete Over head tank


outer to outer size - 14'-6" x 5'-6" x 5'-6"
inner to inner size - 13'-0" x 4'-0" x 4'-6"

Specification
For outer 4.5" thickness Brick wall all around the tank
For inner 4.5" thickness concrete wall all around the tank
( Rod Details - 10mm and 8mm Rod )
Top and Bottom 5" thickness concrete slab with water Proffing
inside wall full of tiles work
Size 13' -0' x 4'-0" x 4'-6" = 234 cft
Convert to litre 234 cft x 28.317 = 6625 litres

OHT COST 6625 litres x 20/- = 1,32,500 /- 1,32,500

5 EXTRA ROOF HEIGHT

BRICK WORK
For Ground floor - 1'-0" = 425 cft
For First floor - 0'-6" = 487 cft
Total = 912 cft
912 cft x 60/- = 54,720
column work
For Ground floor - 1'-0" = 14 cft
For First floor - 0'-6" = 07 cft
Total = 21 cft
21 cft x 750/- = 15,750
Total = 70,470 70,470

6 ELECTRICAL EXTRA WORK

Electrical work - MADHAN expenditure

5 Ams Switch 245 Points x 650 = 1,59,250


15 Ams Switch 38 Points x 750 = 28,500
A/C 8 Points x 7500 = 60,000
Total Amount = 2,47,750

Electrical work - Engineer expenditure

5 Ams Switch 90 Points x 650 = 58,500


15 Ams Switch 14 Points x 750 = 10,500
A/C 3 Points x 7500 = 22,500
Total Amount = 91,500

Electrical work - MADHAN expenditure = 2,47,750


Electrical work-TSR HOMES expenditure ( - )= 91,500
Balance Amount = 1,56,250
tube light fittings + = 7,264
EB Mainboard cost + = 17,203
EB Deposit cost + = 75,000
Switch, Sheet & Metal box Extra Cost + = 22,831
Total Amount = 2,78,548 2,78,548

7 Parking area Granite work


Madhan Expences
Granite - 232 x 165/- = 38,280
Labour = 600
transport = 1,000
tax = 2,331
Total = 42,211
Engineer Expenditure ( - )
Parking tiles 177 sft x 32/- = 5,664
Total = 36,547 36,547
8 GRILL WORK

Safety gate 289 kg 85/- = 24,607


design grill = 10,430
transport = 400
ladder sheet = 18,810
handrail pipe = 3,520
Balcony grill fixing = 6,500
ladder fixing and pipe fixing labour = 4,500
transport = 900
Total = 69,667 69,667

9 Baskar PVC
Alluminium Glass work 51.25 sq.ft x 250/- = 12,812
transport = 1,500
Total = 14,312 14,312

10 Sump Pipe line work


5 length 2.5" pipe Ashirwadh
Pipe 1180 x 5 = 5,900
Elbow = 100
Labour = 6,000
Brick , cement, for thotti = 3,000
Total = 15,000 15,000

11 Providing Rain water harvesting - 2 nos


one is Engineer's contribution
Another one is Madhan cost
size - 4'-0" x 3'-0" x 2'-6"
brick - 250 nos - 2000
sand - 8 cft - 480
cement - 1 bag - 300
brick jelly - 10 cft - 3600
labour - 4000
Total = 10,380 10,380

12 Rump work

20'-0" x 6'-0" = 120 sqft x 110/- 13,200

13 Camera Point including labour and material


Per point - 750/- 15 point x 750/- 11,250
14 FLOATING STAIRECASE - INNER STAIRCASE

Providing Concrete Steps - 43 Nos

Specification
1'-3" x 9" thick wall beam - 34 rft
( rod details - 12mm , 8mm & 6mm )

concreate steps - 43 nos


rod details - 12mm and 6mm rods

one steps @ 6000/- 43 steps X 6000/- = 2,58,000


( including Ply wood & Achary Cost )
( Granite and Granite laying charge not included )
SS hand rails 70 rft @ 1500/- = 1,05,000
Granite = 71,055
Total = 4,34,055 4,35,055

15 OUTER STAIRCASE

42 Steps straight steps with tile flooring and MS hand


rails
42 steps straight steps and four landing
1 step @3250 = 42 step x 3250/- = 1,46,250
landing 81 sq.ft @ 750/- = 60,750
MS Grill handrails = 40,000
tiles and laying cost ( tiles cost 45/- ) = 33,000
Total = 2,80,000 2,80,000

16 FLOOR TILES WORK - MADHAN Expenditure

Onex pearl
103 box x 93/- = 1,97,904
8 box x 105 /- = 17,430
Total = 2,15,334
( - ) engineer cost 2294 sq.ft x 50/- = 1,14,700
Balance Amount = 1,00,634 1,00,634

Amazon Walnut 22 box


devi room balcony & madhan room
balcony = 21,598
( - ) engineer cost 203 x 50/- = 10,150
total = 11,448
( - ) sunken tiles cost 120 x 50/- = 6,000
total = 5,448 5,448
Toilet tiles details

17 BATHROOM TILES WORK - MADHAN Expenditure

Invoice number 2275 = 22,724


Invoice number 2676 = 1,163
Invoice number 2640 = 2,908
Invoice number 2704 = 45,581
Invoice number 2796 = 12,398
Invoice number 2344 = 36,312
Invoice number 2358 = 27,063
Invoice number 2584 = 4,072
Invoice number 2394 = 2,327
Invoice number 2453 = 12,217
total = 1,66,765

( - ) engineer cost 976 sq.ft 32/- = 31,232


= 1,35,533 1,35,533

( Chitty toilet - 247 sq.ft, chittappa toilet - 216.00 sq.ft


devi toilet - 165 sq.ft, madhan toilet - 219 sq.ft
staircase toilet - 129 sq.ft )

18 INNER AND OUTER PLUMBING

Plumbing material - Ashirvadh company


( madhan expenditure ) outer Plumbing materil
( Attached yaasmin hardwares bill ) = 1,14,088
( - ) engineer cost = 72,565
total = 41,523 41,523

19 TAP FITTINGS AND WASH BASIN

VSP 27-7-18 = 10,940


VSP 30-7-18 = 8,130
VSP 03-9-18 = 2,735
VSP 15-9-18 = 12,590
VSP 08-10-18 = 300
VSP 12-10-18 = 200
VSP 07-02-19 = 5,100
Invoice number 0546 = 22,736
Invoice number 0553 = 23,481
Invoice number 0579 = 2,530
Invoice number 0667 = 15,800
Invoice number 0691 = 5,950
total = 1,10,492
( - ) engineer cost = 53,000
total = 57,492 57,492
20 PUTTY WORK

Providing brilla white care for wal and ceiling


for wall ( G.F + F.F +S.F ) 4155 sq.ft @ 22/- 91,140
for ceiling ( G.F + F.F ) 2811 sq.ft @ 22/- 61,842
1,52,982 1,52,982

21 GROUND FLOOR LIVING SUNKEN CONCRETE COST DETAILS

G.F Living Sunken Concrete Flooring Size 10'-0" x 11'-0"


SUNKEN concrete flooring 110 sq.ft

Specification
5" thick Concrete Mat
( Rod Details - 10mm x 10mm
One Sqft @ 750/- ( 110 Sqft @ 750/- = 82,500/- 82,500

22 RIVER SAND EXTRA COST

River sand purchase details

sand - 20 .12.17 - dharma supply 350 cft 58,000


sand - 23 .12.17 - P.G.S Supply 170 cft 24,500
sand - 26 .12.17 - malaivamanan supply 270 cft 36,500
sand - 30 .12.17 - Appu supply 326 cft 60,000
sand - 05 .02.18 671 cft 1,07,200
sand -13 .03.18 - dharma supply 338 cft 36,000
sand -15 .03.18 - dharma supply 139 cft 16,000
sand -29 .03.18 - vedha sri transport 620 cft 55,800
sand -24 .04.18 - vedha sri transport 582 cft 66,930
sand -07 .06.18 - vedha sri transport 310 cft 37,200
sand -26 .06.18 - Dasan supply nice sand 283 cft 29,715
sand -26 .06.18 - velavan supply 187 cft 22,000
sand -14.07.18 - dasan supply 307 cft 32,235
sand -27.07.18 - GST Supply 377 cft 41,470
sand -16.08.18 - ramanathan supply 538 cft 53,800
sand -09.09.18 - ramanathan supply 263 cft 32,875
sand -26.09.18 - ramanathan supply 247 cft 31,250
sand -26.09.18 - ramanathan supply 357 cft 32,875
sand -12.10.18 - ramanathan supply 263 cft 36,820
6598 cft 8,11,170
Sand Purchase extra cost details
Sand purchase - MADHAN expenditure
6,598 cft = 8,11,170
Sand purchase - engineer expenditure
( - ) 6,598 cft @ 55/- = 3,62,890
total = 4,48,280 4,48,280
River Sand Extra cost - 4,48,280/-

23 WOOD WORK - MADHAN Expenditure

Arasan timber wood Purchase = 2,66,750


Shortage wood = 13,000
Beading plaining charges = 13,000
Apsara Doors Purchase doors = 61,630
Total = 3,54,380
polish work details
for windows ( varnish ) 415 sq.ft x 110/- = 45,650
for doors ( varnish ) 805 sq.ft x 110/- = 88,550
Total = 1,34,200

Windows and door fixing labours charges


for Main Door - 28 sq.ft x 350/ = 9,800

For Bedrom Doors - 315 sq.ft x 200/- = 63,000

For windows - 189 sq.ft x 150/- = 28,350

For ventilator - 6 nos x 800/- = 4,800


Total = 1,05,950

WOOD WORK - MADHAN expenditure

Arasan timber wood purchase = 3,54,380


Wood polish work = 1,34,200
Achary Labour = 1,05,950
Total = 5,94,530
WOOD WORK - TSR HOMES expenditure

Particulars Size Nos of Rate Amount

Main Door 3'-6" x 7'-0" 2 35,000 70,000

Bedroom Door 3'-0" x 7'-0" 10 6,825 68,250

Balcony Door 3'-0" x 7'-0" 1 5,687 5,687

Window 1 5'-0" x 4'-0" 3 11,000 33,000

Window 2 4'-0" x 4'-0" 9 8,800 79,200

Window 3 3'-0" x 3'-0" 2 4,950 9,900

Window 4 2'-0" x 4'-0" 4 4,200 16,800

Ventilator 2'-0" x 1'-6" 7 1,800 12,600

Enamel for Doors & windows 21,500

6 Nos PVC Doors for Toilets 9,600

Total 3,26,537

WOOD work different cost

WOOD WORK - MADHAN expenditure = 5,94,530

WOOD WORK - TSR HOMES expenditure ( - ) = 3,26,537


2,67,993 2,67,993
( Main Doors border wood not included )

24 Sump water proofing & Toilet sunken water proofing work 19,500

25 Compound wall main gate 75,000

26 Granite laying charge and tiles laying extra cost

Granite Laying - 820 sq.ft x 35/- 28,700


Granite molding - 838 rft x 80/- 67,040
Service Area Granite Work Labour 6,000
Granite Soap Self work 3,000
Granite full molding - 44 rft x 120/- 5280
tiles laying extra cost ( floor, Barhroom wall & floor )
madhan coat - 25/-
engineer cost - 17/-
difference amount - 8/-

flooring tiles ( g.f + f.f ) - 2680 sq.ft x 8/- 21,440


Bathroom tiles - 1346 sq.ft x 8/- 10,768
1,42,228 1,42,228

TOTAL AMOUNT 1,02,86,653