Testing of Pipes
Testing of Pipes
Page 1 of 4
CHENNAI ENVIRONMENTAL MANAGEMENT COMPANY OF TANNERS
Daily Log Ref.________ Tested as per Date Tested Test Head : 2.5
Date __________ CPHEEO _____ m at highest
point
Observation: 1
hr
Sl. No ID Time in Stretch Length Water level Volume of water to restore to
(mm) hrs (m) Drop (mm) original level (liters)
10 30 min 10 min 30 min
min
Witnessed by:
Name Designation Signature
Page 2 of 4
CHENNAI ENVIRONMENTAL MANAGEMENT COMPANY OF TANNERS
Daily Log Ref.________ Date Tested as per CPHEEO _____ Date Tested
__________
Witnessed by:
Name Designation Signature
Page 3 of 4
CHENNAI ENVIRONMENTAL MANAGEMENT COMPANY OF TANNERS
Daily Log Ref.________ Date Tested as per CPHEEO _____ Date Tested Duration of
__________ Water Retention:
24 hrs
S. No Manhole No. Water Level (m) Sign Drop in water Remarks
Initial Final level
(mm)
Witnessed by:
Name Designation
Page 4 of 4