100% found this document useful (3 votes)
660 views

Sop Stenter

The document outlines the standard operating procedure for using a stenter machine. It details checking the batch card and special instructions, ensuring the machine is clean and pressures are set correctly, setting the parameters like diameter, speed and temperature for the fabric type, assigning manpower roles, and checking the width, GSM, shade and quality of the finished product. Operators are instructed to open the door if the machine stops, notify supervision if widths are off, keep filters clean, and not open the door if a fire occurs inside the machine.

Uploaded by

Fathi Mustafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
660 views

Sop Stenter

The document outlines the standard operating procedure for using a stenter machine. It details checking the batch card and special instructions, ensuring the machine is clean and pressures are set correctly, setting the parameters like diameter, speed and temperature for the fabric type, assigning manpower roles, and checking the width, GSM, shade and quality of the finished product. Operators are instructed to open the door if the machine stops, notify supervision if widths are off, keep filters clean, and not open the door if a fire occurs inside the machine.

Uploaded by

Fathi Mustafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Standard Operating Procedure

(Stenter Machine)
1. Check Requirement
Batch Card 2. DIA, GSM, Stitch Length, Yarn Count
3. Follow any Special Instruction

1. Need Clean or not/ Filter


Machine 2. Air & Gas Pressure Sufficient or not
3. Temperature all burner same?

1. Dia wise width set up

Parameter 2. Overfeed, Under feed & Speed


3. Temperature Set fabrics type wise

1. Back side-1, Operating Side-1, Front side-1

Manpower 2. Quality Check & Fabrics feeding-1 person


3. Softener Preparation-1 person

1. Width & GSM Check

Check 2. Shade give to Quality for confirm


3. Hand feel, Quality issue confirm from Quality

Note: 1. If suddenly machine stop please open the door otherwise may be
caught fire.
2. If you got width plus from required please the Supervisor,
3. Filter keep clean,
4. If caught firing, stop the machine, blower also, can’t open the door
also & keep the mind, a fire that cannot carried outside of machine

You might also like