8-Noss Matrix l2
8-Noss Matrix l2
INSTALLATION MAINTENANCE
THREE PHASE INSTALLATION
AND TROUBLESHOOT
TROUBLESHOOTING
MODULE
INSTALLATION AND
MOTOR CONTROL
INSTALLATION
DRAWING
TESTING
JOB PROFILE CHART
NO
DUTY NO.TASK TASK M01 M02 M03 M04 M05
DUTY
01 DESIGN ELECTRICAL DRAWING 01.05 Perform three phase single line drawing
06 PERFORM TROUBLESHOOTING WORKS 06.04 Troubleshoot three phase appliance / machinery fault
xi
07 PERFORM ELECTRICAL MAINTENANCE 07.02 Maintain electrical installation
xi