PIER
PIER
VERTICAL LOADS ;
(b)LIVE LOADS :
WIND LOADS :
WIND LOAD ON GIRDER AND ON PROJECTED AREA OF TRAIN
LENGTH OF GIRDER = 13.4
GIR DEP=OVERALL DEPTH (RL TO GIR BOT ) -TRAC KDEPTH
2166 MM
CENTER TO CENTER OF GIRDER = 1980 MM
FACTOR FOR WIND = 0.25
DEPTH OF PROJECTED AREA OF GIRDER(INCL TRACK) = 2.478 MM
TOTAL PROJECTED AREA = 41.5065 SQM
DEPTH OF BASE PLATE = 50 MM
LEVERARM FOR WIND FORCE FROM TOP OF BED BLOCK 1289 MM
WIND LOAD ON TRAIN
DEPTH OF BOGIE AS PER CL 2.11.3.1.(b)(II)
= RL TO TOP OF HIGHEST STOCK - 600 MM
3515 MM
PROJECTED AREA OF TRAIN = 47.101 SQM
LEVER ARM FROM TOP OF BEDBLOCK = 4885.5 MM
S S L C WITHOUT WIND
SELF WEGHT OF BEDBLOCK = 6.429888 t
SIDL(GIRDER WT+TRACK) = 22.908
LIVELOAD = 86.4800257732 t
TOTAL LOAD = 115.817913773 t ecce 0.3 0.3
Mxx DUE TO ECCENTRICITY OF LIVE LOAD = 25.944007732 t-m
Mxx DUE TO LONG FORCE = 9.62 t_m
TOTAL Mxx = 35.564007732 t_m
STRESSES AT BOTTOM OF BED BLOCK = 65.1085886034 t/sqmSAFE
AND = -13.232787397 t/sqm
S S L C WITH WIND
Myy DUE TO WIND ON GIRDER = 11.760866775 t_m
Myy DUE TO WIND ONTRAIN = 19.3779401625
TOTAL MyY = 31.1388069375 t-m
3.66
0.6725
0.6725
1.345
cut water
BATTER 1 IN 16 16
depth considerd = 1 m
this section is above MWL
width of section with side batter of 1.345 m
TOTAL 129.477208268 t
Iyy = 9.3346177738 m4
HENCE SAFE
I ) S S L C WITH WIND
TOTAL 150.260591 t
Ixx = 0.8102858525 m4
Iyy = 9.3346177738 m4
HENCE SAFE
I ) D S L C WITH WIND
Ixx = 13.6268278773 m4
Iyy = 45.5716919486 m4
3.66
1.6575
1.6575
3.315
cut water
TOTAL 532.61286525 t
Ixx = 13.6268278773 m4
Iyy = 45.5716919486 m4
HENCE SAFE
I ) S S L C WITH WIND
TOTAL 566.11286525 t
Ixx = 13.6268278773 m4
Iyy = 45.5716919486 m4
HENCE SAFE
I I ) D S L C WITH WIND
8.775
5.115
3.66
2.5575
PLAN AREA = 44.884125 M2
TOTAL LOAD
DEAD LOAD +LIVE LOAD= 625.81916025 T
Ixx = 97.8594551086 m4
Iyy = 288.008806465 m4
I ) S S L C WITH WIND
TOTAL 659.31916025 t
Ixx = 97.8594551086 m4
Iyy = 288.008806465 m4
HENCE SAFE
I I ) D S L C WITH WIND
0.6
BATTER 1 IN
16.76
3.315