0% found this document useful (0 votes)
49 views3 pages

L 453 Approval 05082015

Aramco Approval Welding inspector.

Uploaded by

Ehab Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
49 views3 pages

L 453 Approval 05082015

Aramco Approval Welding inspector.

Uploaded by

Ehab Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
oo Tere Appgauull gSoh! >A ‘Saudi Aramco PIPELINES & COMMUNICATIONS PROJECTS DEPARTMENT Communications & Security Projects Division Communication Projects Unit Dammam Office Building, Dammam #8 807-9159; & 862-2212 August 6, 2015 C&SPD/BI-10-00617/MAS/L-453/15 Contract No, 6600027500, BI-10-00617 Install P/L Leak Detection & Corrosion Moritoring Systems ~ Phase I Re-evaluation QC Welding Inspector (Mr, Nasr Ibrahim _ Ayman Murrar, Project Manager Mohammed A. Al-Sweilem Company (MASCO) Prince Faisal Bin Fahad St., AHKhobar, KSA '® 807-9061 & 807-9061 Reference: Letter No: MA-IS-QCD-161/15 dated on July 23, 2015. Attached proposed QC Welding Inspector Mr. Nasr Ibrahim has been evaluated by Saudi Aramco and approved as QC Welding Inspector for the project Bl-10-00617 with no further comments. This approval does not relieve MASCO of its responsibilities under the terms and conditions of the referenced Contract. If any additional information is required, the undersigned can be contacted at 053- 811-3132, lod ‘ i Company Representative ‘Communications and Security Projects Division AYS/Bde: Attachment(s): DRR from PID ce! St. Project Engineer Project File/ Letter book a INSPECTION DEPARTMENT SAPID/ Southern Area Project Inspection Section/SAPIU R716, Building No. 9-5121 Abaaia ‘013-574-4218 & 013-572-1096 Document Review Response Sheet ‘Transmittal Reference |SAPIS-SAPIU-BI-10-00617-L-0111-16 Date: JULY 30 , 2015 fro line & Communication Project Dept. Jatention [Abdullah Y. Al-Salman vision ntact Nos, [Communication & Security Projects Division REVIEW STATUS ‘Ace 2 tc cannes ‘cRodenedoh Reon jeans 1 Ganson oe nO cut Pr oy inh 38ers ean BI/JO# PROJECT TITLE Contractor's Contract No. / CONTRACTOR 10-00617 Install Pipeline Leak Detection ana Corrosion Monitoring System Phase | 6600029500/MASCO sara Transmittal Reference |conua tr Transmit Reference MA-TS-QCD-161/15 [subject IC&SPDIBI-10-00617/SA/L-219/15 Date: JULY 27, 2015 Re evaluation QC Welding Inspector Mr. Nasr Ibrahim REVIEW COMMENTS rte: Noe |SAPIU/SAPID has evaluated Mr, Nasr Ibrahim and appoved him as QC Welding Inspector for the project BI-10-00617 1) The approved Persone shall be dedicated to above mentioned Bi ony. Tins Company Review sol notre the Contacte ie esponstitis forthe seca oth thc daca provid by tre Coco Mahmoud dels Ue ape ae [Supervisor Mohammed Y. Nuwaiser bute & Sinatire be =a Saudi Aramco: Company General Use POY 0:0 0 ccs MASCO Hobammed AAI Swatem Group BI-10-00617-INSTALL PIPELINES LEAK DETECTION & CORROSION MONITORING SYSTEMS PHASE-1 TRANSMITTAL Not MA-TS-QCD-161/15 To: SAUDI ARAMCO Sly 23, 2018 Attn: Mr, Hamoud A, AbTamimi/Company Representative Subject: Re-Evaluation of QC Welding Inspector (Mr. Nasr Ibrahim) Please find attached documents as shown below: Teen Date inti Ne Doe. No. Revs | ga patty | Hsued for Deseription 1 onewons ea 8 | Re-Ryaluation of QC Welding eproval | Inspector Ove. Nasr Bbrahisn) ‘Transmitted by: 4 ‘Name and Signature of Receiver Representative: bi Name: Mr. Gitbgit Ramos a vad : Signatures Project Manager Dates 4 $S8UUS 22 ay ANS ‘QCF-020 Rev. 00 Aub 1). 2000

You might also like