We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
oo Tere
Appgauull gSoh! >A
‘Saudi Aramco
PIPELINES & COMMUNICATIONS PROJECTS DEPARTMENT
Communications & Security Projects Division
Communication Projects Unit
Dammam Office Building, Dammam
#8 807-9159; & 862-2212
August 6, 2015
C&SPD/BI-10-00617/MAS/L-453/15
Contract No, 6600027500, BI-10-00617
Install P/L Leak Detection & Corrosion
Moritoring Systems ~ Phase I
Re-evaluation QC Welding Inspector
(Mr, Nasr Ibrahim _
Ayman Murrar, Project Manager
Mohammed A. Al-Sweilem Company (MASCO)
Prince Faisal Bin Fahad St., AHKhobar, KSA
'® 807-9061 & 807-9061
Reference: Letter No: MA-IS-QCD-161/15 dated on July 23, 2015.
Attached proposed QC Welding Inspector Mr. Nasr Ibrahim has been evaluated by
Saudi Aramco and approved as QC Welding Inspector for the project Bl-10-00617
with no further comments.
This approval does not relieve MASCO of its responsibilities under the terms and
conditions of the referenced Contract.
If any additional information is required, the undersigned can be contacted at 053-
811-3132,
lod ‘ i Company Representative
‘Communications and Security Projects Division
AYS/Bde:
Attachment(s):
DRR from PID
ce! St. Project Engineer
Project File/ Letter booka
INSPECTION DEPARTMENT
SAPID/ Southern Area Project Inspection Section/SAPIU
R716, Building No. 9-5121 Abaaia
‘013-574-4218 & 013-572-1096
Document Review Response Sheet
‘Transmittal Reference
|SAPIS-SAPIU-BI-10-00617-L-0111-16 Date: JULY 30 , 2015
fro
line & Communication Project Dept.
Jatention
[Abdullah Y. Al-Salman
vision
ntact Nos,
[Communication & Security Projects Division
REVIEW STATUS
‘Ace
2 tc cannes
‘cRodenedoh Reon
jeans
1 Ganson oe
nO cut Pr oy
inh 38ers ean
BI/JO#
PROJECT TITLE
Contractor's Contract No. /
CONTRACTOR
10-00617
Install Pipeline Leak Detection ana
Corrosion Monitoring System Phase |
6600029500/MASCO
sara Transmittal Reference
|conua tr Transmit Reference
MA-TS-QCD-161/15
[subject
IC&SPDIBI-10-00617/SA/L-219/15 Date: JULY 27, 2015
Re evaluation QC Welding Inspector Mr. Nasr Ibrahim
REVIEW COMMENTS
rte:
Noe
|SAPIU/SAPID has evaluated Mr, Nasr Ibrahim and appoved him as QC Welding Inspector for the project BI-10-00617
1) The approved Persone shall be dedicated to above mentioned Bi ony.
Tins Company Review sol notre the Contacte ie esponstitis forthe seca oth thc daca provid by tre Coco
Mahmoud
dels Ue ape ae
[Supervisor
Mohammed Y. Nuwaiser
bute & Sinatire
be =a
Saudi Aramco: Company General UsePOY 0:0 0 ccs
MASCO Hobammed AAI Swatem Group
BI-10-00617-INSTALL PIPELINES LEAK DETECTION & CORROSION MONITORING SYSTEMS PHASE-1
TRANSMITTAL
Not MA-TS-QCD-161/15
To: SAUDI ARAMCO Sly 23, 2018
Attn: Mr, Hamoud A, AbTamimi/Company Representative
Subject: Re-Evaluation of QC Welding Inspector (Mr. Nasr Ibrahim)
Please find attached documents as shown below:
Teen Date inti
Ne Doe. No. Revs | ga patty | Hsued for Deseription
1 onewons ea 8 | Re-Ryaluation of QC Welding
eproval | Inspector Ove. Nasr Bbrahisn)
‘Transmitted by: 4 ‘Name and Signature of Receiver Representative:
bi Name: Mr. Gitbgit Ramos
a vad
: Signatures
Project Manager
Dates 4 $S8UUS
22 ay ANS
‘QCF-020 Rev. 00
Aub 1). 2000