This document appears to be a list of approvals and endorsements for the construction design of the Setia Budi Station for the LRT Jabodebek rail project in Indonesia. It includes the names, positions and signatures of various parties involved in the management, design, construction and approval of the station plans, including representatives from the Ministry of Transportation, the project management consultant, construction contractors, and engineers who checked and approved the design drawings. The document also lists the drawing reference number and title for the station design.

Uploaded by

Rofa Udin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views

01 PDF

This document appears to be a list of approvals and endorsements for the construction design of the Setia Budi Station for the LRT Jabodebek rail project in Indonesia. It includes the names, positions and signatures of various parties involved in the management, design, construction and approval of the station plans, including representatives from the Ministry of Transportation, the project management consultant, construction contractors, and engineers who checked and approved the design drawings. The document also lists the drawing reference number and title for the station design.

Uploaded by

Rofa Udin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES :

EMPLOYER
MINISTRY OF TRANSPORTATION
DIRECTORATE GENERAL OF RAILWAY
DIRECTORATE OF RAILWAY INFRASTRUCTURE

Karya Building11th Floor


Medan Merdeka Barat Street No.8, Jakarta 10110
ENDORSED BY :

NAME POSITION DATE SIGNATURE

P.P.K.
Ir. ERNI BASRI.ST.M.Eng, IPM,ASEAN Eng PEMBANGUNAN
NIP: 19760813.200212.2.001 PRASARANA
LRT JABODEBEK

MANAGEMENT CONSULTANT

OCG - JOPRISS

ENDORSED BY :

NAME POSITION DATE SIGNATURE

PROJECT
R. MANAI
MANAGER
DEPUTY
A. RAHMAT PROJECT
MANAGER

APPROVED BY :
H. NAGASHIMA RE LINE 1
J. SARRE RE LINE 2
H. OKUHARA RE LINE 3
S. SIMLAI CRE-D (Electrical)

YOSHIRO MIKI Station Expert


General Electrical
MD. SABIR HUSSAIN
Expert

CHECKED BY
Donald Situmeang ENGINEER

Faisal Thohirronie ENGINEER

CONSTRACTOR DESIGN & BUILD

PT. ADHI KARYA (Persero) Tbk.


RAYA PASAR MINGGU STREET KM.18 JAKARTA 12510, INDONESIA

REV DATE DESCRIPSION

ENDORSED BY :

NAME POSITION DATE SIGNATURE

PROJECT
I PUTU INDRA PRABAWA
MANAGER

CHECKED BY

AROKA ARYADETA

DRAWN BY

RACHMAD

PROJECT

PEKERJAAN PRASARANA KERETA API RINGAN


/ LRT TERINTEGRASI DI WILAYAH JABODEBEK
LINTAS PELAYANAN 02 CAWANG - DUKUH ATAS

LRT-CV-EL-DW-L2-STSB-04
DED REFERENCE NUMBER
01 APRIL 2019

DRAWING TITLE :

SETIA BUDI STATION


DRAWING LIST

SCALE SIZE DISCIPLINE REVISI NUMBER

N.T.S A2 MEP 3A
DRAWING NUMBER DATE

LRT-CV-MEP-EL-DW-L2-STSB-000 18/12/2019